MEG-Middleport Trail Phase 2
MEG County · est $0.2M
Bid dateThursday, May 7—
MEG County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Shelly Company | R2Amaazz Construction Ohio LLC | R3Parker Corporation | R4Axis Civil Construction LLC | R5D V Weber Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 304E20000 AGGREGATE BASE | 380 CY | $72.50 | $66.00 | $85.00 | $110 | $130 | 17% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 134 CY | $185 | $205 | $195 | $200 | $225 | 15% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 159 SY | $110 | $125 | $76.00 | $86.00 | $95.00 | 11% |
| 203E10000 EXCAVATION |
| Item | Quantity | R1Shelly Company | R2Amaazz Construction Ohio LLC | R3Parker Corporation | R4Axis Civil Construction LLC | R5D V Weber Construction |
|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 88 FT | $5.00 | $4.00 | $5.00 | $5.00 | $32.00 |
| 202E75250 GATE REMOVED | 1 EACH | $450 | $175 | $100 | $200 | $500 |
| 204E45000 PROOF ROLLING | 1 HOUR | $175 | $220 | $100 | $225 | $250 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $20.30 | $55.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 402 CY |
| $29.00 |
| $27.00 |
| $25.00 |
| $35.00 |
| $53.00 |
| 7% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 659E00300 TOPSOIL | 168 CY | $51.00 | $22.00 | $35.00 | $28.00 | $88.00 | 5% |
| 607E23000 FENCE, TYPE CLT | 200 FT | $31.50 | $32.50 | $31.50 | $31.50 | $31.50 | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $5,500 | $3,000 | $5,000 | $3,500 | $2,600 | 3% |
| 659E10000 SEEDING AND MULCHING | 3,020 SY | $1.80 | $1.50 | $1.00 | $1.41 | $1.41 | 3% |
| 608E53020 DETECTABLE WARNING | 101 SF | $51.00 | $25.00 | $30.00 | $25.00 | $56.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $12,500 | $11,200 | $20,000 | $7,500 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $4,834 | $2,800 | $5,000 | $4,500 | $5,500 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,500 | $1,500 | $100 | $1,200 | $1,500 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $1,200 | $5,000 | $10,000 | $5,850 | 3% |
| 690E50600 SPECIAL - BOLLARD | 9 EACH | $450 | $500 | $500 | $450 | $450 | 3% |
| 607E61201 GATE, TYPE CLT, AS PER PLAN | 1 EACH | $3,850 | $4,200 | $3,850 | $3,850 | $3,850 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $2,901 | $5,000 | $15,000 | $21,925 | 2% |
| 204E10000 SUBGRADE COMPACTION | 2,624 SY | $1.25 | $3.40 | $0.50 | $2.00 | $2.00 | 2% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 183 FT | $15.00 | $16.50 | $15.00 | $15.00 | $15.00 | 2% |
| 203E20000 EMBANKMENT | 101 CY | $18.00 | $18.25 | $25.00 | $35.00 | $48.00 | 1% |
| $20.00 |
| $20.00 |
| $50.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $250 | $330 | $500 | $750 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $338 | $110 | $50.00 | $100 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 151 SY | $0.68 | $1.50 | $0.10 | $1.41 | $1.41 |
| 659E15000 INTER-SEEDING | 151 SY | $0.68 | $1.50 | $0.10 | $1.41 | $1.41 |
| 659E20000 COMMERCIAL FERTILIZER | 0.41 TON | $665 | $670 | $2,440 | $605 | $605 |
| 659E31000 LIME | 0.64 ACRE | $150 | $75.00 | $1,563 | $70.00 | $70.00 |
| 659E35000 WATER | 17 MGAL | $1.00 | $1.05 | $0.10 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 960 SY | $1.55 | $2.75 | $2.50 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $2,770 | $5,000 | $1,750 | $1,375 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,000 | $3,900 | $5,000 | $7,400 | $2,350 |
| 630E80100 SIGN, FLAT SHEET | 34.5 SF | $30.00 | $32.00 | $30.00 | $30.00 | $30.00 |
| 642E00201 LANE LINE, 4", TYPE 1, AS PER PLAN (BROKEN YELLOW) | 0.38 MILE | $1,975 | $2,050 | $3,440 | $3,440 | $1,975 |
| 642E00201 LANE LINE, 4", TYPE 1, AS PER PLAN (SOLID YELLOW) | 0.03 MILE | $18,500 | $20,000 | $4,820 | $4,820 | $18,500 |
| 642E00500 STOP LINE, TYPE 1 | 25 FT | $9.00 | $9.75 | $4.00 | $4.00 | $9.00 |
| 642E00600 CROSSWALK LINE, TYPE 1 | 33 FT | $9.00 | $9.75 | $3.50 | $3.50 | $9.00 |
| 642E19000 SHARED LANE MARKING, TYPE 1 | 6 EACH | $200 | $210 | $180 | $180 | $200 |
| 616E10000 WATER | 1 MGAL | $1.00 | $41.00 | $1.00 | $30.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,000 | $1,280 | $2,650 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 304E20000 AGGREGATE BASE | 380 CY | $72.5 | $28k | 16% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 134 CY | $185 | $25k | 14% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 159 SY | $110 | $17k | 10% |
| 203E10000 EXCAVATION | 402 CY | $29 | $12k | 7% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 6% |
| 659E00300 TOPSOIL | 168 CY | $51 | $9k | 5% |
| 607E23000 FENCE, TYPE CLT | 200 FT | $31.5 | $6k | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $5,500 | $6k | 3% |
| 659E10000 SEEDING AND MULCHING | 3,020 SY | $1.8 | $5k | 3% |
| 608E53020 DETECTABLE WARNING | 101 SF | $51 | $5k | 3% |