HUR-SR 60/SR 99-10.78/08.04
HUR County · est $0.4M
Bid dateThursday, May 21—
HUR County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Adena Corporation | R2Mosser Construction INC | R3Great Lakes Demolition Company | R4Fabrizi Trucking & Paving CO INC | R5Eclipse CO LLC | R6Kelstin INC | R7Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 100 FT | $660 | $733 | $640 | $706 | $439 | $600 | $1,000 | 24% |
| 611E94900 8' X 5' CONDUIT, TYPE A, 706.05 | 60 FT | $1,057 | $863 | $815 | $1,219 | $802 | $600 | $1,500 | 23% |
| 203E20000 EMBANKMENT |
| Item | Quantity | R1Adena Corporation | R2Mosser Construction INC | R3Great Lakes Demolition Company | R4Fabrizi Trucking & Paving CO INC | R5Eclipse CO LLC | R6Kelstin INC | R7Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 277 SY | $15.82 | $7.31 | $14.00 | $14.00 | $13.00 | $9.00 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 115 FT | $1.96 | $15.53 | $15.00 | $12.00 | $15.00 | $5.00 | $10.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 65 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,152 CY |
| $13.89 |
| $9.48 |
| $19.50 |
| $17.00 |
| $10.50 |
| $30.00 |
| $15.00 |
| 6% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 45 CY | $275 | $320 | $220 | $218 | $360 | $315 | $370 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 60 CY | $205 | $250 | $211 | $215 | $272 | $285 | $300 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 22 CY | $430 | $403 | $1,000 | $360 | $771 | $850 | $400 | 3% |
| 304E20000 AGGREGATE BASE | 116 CY | $76.43 | $63.63 | $61.00 | $45.00 | $53.50 | $62.50 | $50.00 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,482 | $5,150 | $5,000 | $7,410 | $5,408 | $7,410 | $7,400 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,595 | $21,000 | $11,600 | $10,000 | $16,000 | $22,500 | $12,000 | 3% |
| 203E10000 EXCAVATION | 474 CY | $15.32 | $11.78 | $15.00 | $8.00 | $15.00 | $40.00 | $15.00 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 57 CY | $124 | $113 | $80.00 | $125 | $94.50 | $160 | $125 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $871 | $1,179 | $1,000 | $850 | $2,542 | $2,200 | $3,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,947 | $5,000 | $5,500 | $12,000 | $8,500 | $10,000 | $1,000 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,138 | $1,050 | $952 | $950 | $1,103 | $950 | $950 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,362 LB | $1.81 | $2.83 | $1.50 | $1.75 | $3.00 | $1.25 | $1.00 | 2% |
| 659E00300 TOPSOIL | 331 CY | $16.18 | $61.65 | $55.00 | $20.00 | $58.00 | $30.00 | $30.00 | 2% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,245 | $5,390 | $19,000 | $22,840 | $9,500 | $5,500 | $17,500 | 2% |
| 602E20000 CONCRETE MASONRY | 3 CY | $1,736 | $1,729 | $2,000 | $1,300 | $4,310 | $1,000 | $1,500 | 2% |
| 659E10000 SEEDING AND MULCHING | 2,983 SY | $1.60 | $1.20 | $1.00 | $4.25 | $1.25 | $7.00 | $1.00 | 2% |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $1,177 | $893 | $900 | $750 | $1,022 | $100 | $500 | 2% |
| $6.95 |
| $19.02 |
| $15.00 |
| $48.00 |
| $26.00 |
| $100 |
| $20.00 |
| 202E75000 FENCE REMOVED | 513 FT | $1.17 | $4.51 | $5.00 | $3.00 | $1.50 | $2.00 | $2.00 |
| 204E10000 SUBGRADE COMPACTION | 311 SY | $1.84 | $3.09 | $2.00 | $1.50 | $1.50 | $5.00 | $2.00 |
| 607E98000 FENCE, MISC.: TEMPORARY FENCING | 513 FT | $4.15 | $2.30 | $5.00 | $25.00 | $18.50 | $15.00 | $8.00 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $100 | $25.00 | $175 | $150 | $158 | $100 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 149 SY | $1.00 | $1.00 | $4.00 | $1.00 | $1.05 | $10.00 | $1.00 |
| 659E15000 INTER-SEEDING | 149 SY | $1.00 | $0.50 | $4.00 | $1.00 | $0.55 | $5.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.42 TON | $1,505 | $450 | $1,000 | $1,100 | $472 | $1,000 | $700 |
| 659E31000 LIME | 0.62 ACRE | $552 | $10.00 | $602 | $125 | $10.50 | $500 | $500 |
| 659E35000 WATER | 16.51 MGAL | $1.00 | $10.00 | $10.00 | $5.00 | $2.00 | $5.00 | $50.00 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 124 FT | $13.46 | $33.16 | $25.00 | $12.00 | $16.00 | $5.00 | $10.00 |
| 611E06100 15" CONDUIT, TYPE C | 73 FT | $35.38 | $51.67 | $35.00 | $50.00 | $57.50 | $45.00 | $75.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,616 | $1,422 | $1,500 | $2,450 | $1,746 | $675 | $1,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 270 SY | $11.29 | $22.00 | $15.00 | $10.00 | $31.50 | $20.00 | $5.00 |
| 407E10000 TACK COAT | 69 GAL | $10.58 | $2.00 | $3.52 | $4.00 | $2.00 | $10.00 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $18.84 | $12.00 | $50.00 | $200 | $8.00 | $50.00 | $65.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $21,259 | $16,710 | $6,975 | $16,710 | $26,250 | $16,710 | $12,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $29,602 | $22,280 | $9,875 | $22,280 | $26,250 | $22,280 | $22,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,622 | $3,426 | $5,000 | $8,000 | $6,500 | $2,500 | $4,900 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) | 1 LS | $2,622 | $4,334 | $9,000 | $1,200 | $4,357 | $1,500 | $5,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $548 | $617 | $1,000 | $900 | $1,264 | $2,000 | $1,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 27 SY | $43.80 | $33.00 | $40.00 | $32.00 | $28.00 | $50.00 | $15.00 |
| 512E33000 TYPE 2 WATERPROOFING | 157 SY | $21.12 | $13.10 | $25.00 | $30.00 | $24.00 | $30.00 | $12.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 30 SF | $4.83 | $8.62 | $10.00 | $6.50 | $8.50 | $3.00 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,806 | $1,082 | $5,000 | $500 | $1,546 | $3,500 | $1,200 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,622 | $3,800 | $5,001 | $5,000 | $7,500 | $2,500 | $4,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,647 | $1,925 | $5,250 | $8,100 | $9,500 | $6,800 | $9,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,394 | $2,000 | $4,000 | $11,500 | $15,500 | $8,000 | $12,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $522 | $1,800 | $501 | $1,200 | $683 | $500 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,058 | $4,500 | $5,000 | $4,500 | $15,000 | $3,500 | $2,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 100 FT | $660.15 | $66k | 20% |
| 611E94900 8' X 5' CONDUIT, TYPE A, 706.05 | 60 FT | $1,057 | $63k | 19% |
| 203E20000 EMBANKMENT | 1,152 CY | $13.89 | $16k | 5% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 45 CY | $274.66 | $12k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 60 CY | $205.42 | $12k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 22 CY | $430.06 | $9k | 3% |
| 304E20000 AGGREGATE BASE | 116 CY | $76.43 | $9k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $8,482 | $8k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,595 | $8k | 2% |
| 203E10000 EXCAVATION | 474 CY | $15.32 | $7k | 2% |