UNI-SR 739-14.74
UNI County · est $0.7M
Bid dateThursday, July 16—
UNI County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Shelly Company | R2Strawser Construction INC | R3Henry W Bergman INC | % of bid |
|---|---|---|---|---|---|
| 422E25000 EMULSION, CHIP SEAL | 57,783 GAL | $2.36 | $2.45 | $3.25 | 22% |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 156,171 SY | $0.66 | $0.85 | $0.60 | 16% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,843 SY | $31.00 | $40.00 | $41.00 | 9% |
| 606E15050 GUARDRAIL, TYPE MGS | 3,375 FT | $15.80 | $18.00 | $17.00 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $45,500 | $91,137 | $75,000 | 7% |
| Item | Quantity | R1Shelly Company | R2Strawser Construction INC | R3Henry W Bergman INC |
|---|---|---|---|---|
| 209E60200 LINEAR GRADING | 30 STA | $100 | $50.00 | $100 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,280 | $1,300 | $1,280 |
| 606E98000 GUARDRAIL, MISC.: ALTERNATIVE GUARDRAIL PLACEMENT | 50 FT | $10.00 | $10.00 | $10.00 |
| 659E00300 TOPSOIL | 278 CY | $15.00 | $33.00 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 2,450 SY | $1.75 | $2.55 | $2.50 |
| 659E14000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC |
| 1 LS |
| $44,850 |
| $44,065 |
| $75,000 |
| 7% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 33.21 MILE | $1,290 | $1,400 | $1,600 | 7% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 OR MASH 201 | 14 EACH | $2,150 | $2,450 | $2,150 | 5% |
| 621E00101 RPM, AS PER PLAN | 837 EACH | $25.00 | $25.00 | $28.00 | 3% |
| 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN | 196 EACH | $75.00 | $80.00 | $175 | 2% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 22.14 MILE | $640 | $675 | $700 | 2% |
| 617E10100 COMPACTED AGGREGATE | 74 CY | $160 | $225 | $75.00 | 2% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 837 EACH | $11.00 | $20.00 | $12.00 | 1% |
| 203E20001 EMBANKMENT, AS PER PLAN | 600 CY | $15.00 | $75.00 | $15.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 11.07 MILE | $684 | $750 | $620 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 11.07 MILE | $665 | $700 | $700 | 1% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 445 SY | $14.50 | $15.00 | $50.00 | 1% |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 2,187.5 FT | $2.50 | $2.15 | $2.50 | 1% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 6 EACH | $900 | $1,050 | $900 | 1% |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 17 EACH | $315 | $250 | $315 | 1% |
| 123 SY |
| $0.68 |
| $0.45 |
| $2.50 |
| 659E15000 INTER-SEEDING | 123 SY | $0.68 | $0.10 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.33 TON | $670 | $425 | $750 |
| 659E31000 LIME | 0.51 ACRE | $153 | $105 | $200 |
| 659E35000 WATER | 13 MGAL | $1.00 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 617E25000 WATER | 1 MGAL | $1.00 | $5.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 84 EACH | $8.00 | $8.00 | $10.00 |
| 642E00500 STOP LINE, TYPE 1 | 96 FT | $7.20 | $8.00 | $5.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 96 FT | $7.00 | $8.00 | $5.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.45 MILE | $1,525 | $1,600 | $900 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 11.07 MILE | $375 | $550 | $700 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.1 MILE | $1,525 | $1,600 | $2,000 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 96 FT | $3.00 | $3.25 | $45.00 |
| 616E10001 WATER, AS PER PLAN | 5 MGAL | $1.00 | $5.00 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $7,500 | $7,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $1,000 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 422E25000 EMULSION, CHIP SEAL | 57,783 GAL | $2.36 | $136k | 21% |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 156,171 SY | $0.66 | $103k | 16% |
| 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,843 SY | $31 | $57k | 9% |
| 606E15050 GUARDRAIL, TYPE MGS | 3,375 FT | $15.8 | $53k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $45,500 | $46k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $44,850 | $45k | 7% |
| 642E30030 REMOVAL OF PAVEMENT MARKING | 33.21 MILE | $1,290 | $43k | 6% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 OR MASH 201 | 14 EACH | $2,150 | $30k | 5% |
| 621E00101 RPM, AS PER PLAN | 837 EACH | $25 | $21k | 3% |
| 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN | 196 EACH | $75 | $15k | 2% |