GAL-US 35-03.47
GAL County · est $0.3M
Bid dateThursday, July 30—
GAL County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 5 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC | R3Capitol Tunneling INC | R4Allard Excavation LLC | R5R C Construction Company And Son | R6INC Marra Services INC | R7Turn-key Tunneling INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 837E10000 LINER PIPE , 70" CONDUIT, TYPE A, 748.06 | 205 FT | $390 | $457 | $525 | $575 | $500 | $522 | $970 | 29% |
| 837E10000 LINER PIPE , 66" CONDUIT, TYPE A, 748.06, 707.12 | 194 FT | $375 | $343 | $267 | $575 | $400 | $500 | $890 | 27% |
| 837E21001 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Eclipse CO LLC | R3Capitol Tunneling INC | R4Allard Excavation LLC | R5R C Construction Company And Son | R6INC Marra Services INC | R7Turn-key Tunneling INC |
|---|---|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 150 FT | $2.08 | $2.50 | $1.00 | $1.65 | $15.00 | $6.00 | $20.00 |
| 607E15000 FENCE, TYPE 47 | 150 FT | $3.00 | $34.50 | $15.00 | $20.50 | $40.00 | $250 | $35.00 |
| 659E20000 COMMERCIAL FERTILIZER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 381 FT |
| $65.00 |
| $93.00 |
| $64.00 |
| $127 |
| $125 |
| $218 |
| $55.00 |
| 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $28,500 | $34,250 | $34,000 | $15,000 | $20,000 | $45,000 | 7% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 66" DI | 290 FT | $65.00 | $84.00 | $180 | $64.00 | $225 | $248 | $200 | 7% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 671 FT | $25.00 | $55.00 | $111 | $50.75 | $100 | $50.00 | $5.00 | 6% |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $30,000 | $30,000 | $27,500 | $25,000 | $5,000 | $6,000 | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $5,000 | $14,500 | $12,000 | $4,600 | $35,000 | $10,000 | $8,000 | 2% |
| 602E20000 CONCRETE MASONRY | 2.1 CY | $1,650 | $2,196 | $3,000 | $4,020 | $1,100 | $2,000 | $3,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $8,500 | $16,000 | $6,900 | $5,000 | $12,000 | $2,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $9,500 | $750 | $1,750 | $7,500 | $5,000 | $4,500 | 1% |
| 659E10000 SEEDING AND MULCHING | 910 SY | $3.00 | $3.50 | $3.00 | $2.50 | $3.00 | $2.75 | $4.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $8,500 | $5,500 | $6,400 | $18,000 | $12,000 | $12,000 | 1% |
| 511E47010 CLASS QC1 CONCRETE, CULVERT | 5 CY | $450 | $1,000 | $300 | $250 | $750 | $1,500 | $300 | 1% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,400 | $1,628 | $3,000 | $2,200 | $1,500 | $1,000 | $1,500 | 1% |
| 203E10000 EXCAVATION | 25 CY | $28.00 | $72.50 | $20.00 | $41.50 | $25.00 | $100 | $50.00 | 0% |
| 203E20000 EMBANKMENT | 25 CY | $28.00 | $72.50 | $40.00 | $41.50 | $25.00 | $100 | $50.00 | 0% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $138 | $138 | $500 | $448 | $100 | $1,500 | $250 | 0% |
| 202E35200 PIPE REMOVED, OVER 24" | 18 FT | $30.00 | $90.50 | $100 | $30.25 | $200 | $55.00 | $50.00 | 0% |
| 0.08 TON |
| $605 |
| $515 |
| $700 |
| $875 |
| $1,200 |
| $2,500 |
| $1,000 |
| 659E31000 LIME | 0.18 ACRE | $75.00 | $206 | $350 | $575 | $800 | $1,111 | $2,500 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $66.67 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 837E10000 LINER PIPE , 70" CONDUIT, TYPE A, 748.06 | 205 FT | $390 | $80k | 29% |
| 837E10000 LINER PIPE , 66" CONDUIT, TYPE A, 748.06, 707.12 | 194 FT | $375 | $73k | 26% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 381 FT | $65 | $25k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 7% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN: 66" DI | 290 FT | $65 | $19k | 7% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 671 FT | $25 | $17k | 6% |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1 | $8k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,500 | $8k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $5,000 | $5k | 2% |
| 602E20000 CONCRETE MASONRY | 2.1 CY | $1,650 | $3k | 1% |