TUS-US 36-17.49, TUS-US 250-21.35
TUS County · est $2.3M
Bid dateThursday, September 17—
TUS County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Amaazz Construction Ohio LLC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 4,673 CY | $160 | $185 | $206 | $203 | 31% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,400 SY | $195 | $200 | $178 | $190 | 27% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1-1/2" | 112,164 SY | $2.05 | $1.85 | $1.15 | $1.29 | 9% |
| 255E10111 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 400 SY | $500 | $285 | $320 | $312 |
| Item | Quantity | R1Shelly & Sands INC | R2Nls Paving, INC | R3Amaazz Construction Ohio LLC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,100 | $2,500 | $2,850 | $2,500 |
| 202E98200 REMOVAL MISC.:MOUNTABLE RAISED CURB | 1,040 FT | $5.25 | $5.50 | $5.25 | $2.80 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 200 FT | $15.00 | $15.00 | $23.00 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $125,000 | $80,000 | $140,000 | $144,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $87,000 | $100,000 | $31,006 | $135,000 | 4% |
| 690E98100 SPECIAL - MOUNTABLE RAISED CURB | 1,040 FT | $73.50 | $68.50 | $85.00 | $72.00 | 3% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 16,600 FT | $3.15 | $3.50 | $3.75 | $3.10 | 2% |
| 646E10010 EDGE LINE, 6" | 11.48 MILE | $2,900 | $2,880 | $2,900 | $2,984 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 45 SNMT | $725 | $550 | $725 | $550 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 550 CY | $55.00 | $60.00 | $85.00 | $55.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 9,531 GAL | $3.00 | $3.20 | $2.95 | $2.25 | 1% |
| 255E10111 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 100 SY | $280 | $265 | $365 | $200 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 5,995 GAL | $3.80 | $3.70 | $4.00 | $4.20 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $75.00 | $75.00 | $77.00 | $65.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 22.96 MILE | $650 | $650 | $650 | $650 | 1% |
| 621E00100 RPM | 453 EACH | $26.00 | $25.00 | $25.50 | $28.12 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,867 | $10,600 | $15,640 | $25,000 | 0% |
| 209E60500 LINEAR GRADING | 10.54 MILE | $850 | $1,350 | $2,600 | $2,000 | 0% |
| 646E10110 LANE LINE, 6" | 4.13 MILE | $2,100 | $1,995 | $2,000 | $2,020 | 0% |
| 254E01600 PATCHING PLANED SURFACE |
| 3,365 SY |
| $2.00 |
| $3.00 |
| $0.26 |
| $0.50 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 29,948 FT | $0.25 | $0.35 | $0.35 | $0.22 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 453 EACH | $4.90 | $5.50 | $13.00 | $1.65 |
| 646E10200 CENTER LINE | 0.07 MILE | $7,500 | $7,290 | $7,500 | $3,660 |
| 646E10310 CHANNELIZING LINE, 12" | 3,005 FT | $1.90 | $1.80 | $1.90 | $2.22 |
| 646E10400 STOP LINE | 219 FT | $11.50 | $11.00 | $11.25 | $11.50 |
| 646E10620 CHEVRON MARKING | 390 FT | $9.50 | $9.25 | $9.75 | $7.50 |
| 646E10800 ISLAND MARKING | 66 SF | $4.20 | $4.00 | $4.25 | $6.00 |
| 646E20300 LANE ARROW | 12 EACH | $180 | $175 | $185 | $175 |
| 646E20504 DOTTED LINE, 6" | 6,225 FT | $1.35 | $1.30 | $1.35 | $1.48 |
| 614E12460 WORK ZONE MARKING SIGN | 12 EACH | $82.50 | $50.00 | $82.50 | $85.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 12 EACH | $82.50 | $150 | $82.50 | $135 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 8.26 MILE | $675 | $700 | $625 | $700 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.14 MILE | $10,000 | $950 | $9,750 | $950 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 4,810 FT | $0.35 | $0.65 | $0.33 | $1.25 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 438 FT | $4.25 | $3.00 | $4.35 | $3.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10351 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 4,673 CY | $160 | $748k | 30% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,400 SY | $195 | $663k | 27% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1-1/2" | 112,164 SY | $2.05 | $230k | 9% |
| 255E10111 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 400 SY | $500 | $200k | 8% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $125,000 | $125k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $87,000 | $87k | 3% |
| 690E98100 SPECIAL - MOUNTABLE RAISED CURB | 1,040 FT | $73.5 | $76k | 3% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 16,600 FT | $3.15 | $52k | 2% |
| 646E10010 EDGE LINE, 6" | 11.48 MILE | $2,900 | $33k | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 45 SNMT | $725 | $33k | 1% |