HUR-US 250-05.10
HUR County · est $4.0M
Bid dateThursday, November 5—
HUR County · est $4.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 78 more items below.
| Item | Quantity | R1Gerken Paving INC | R2Kokosing Construction Company INC | R3Erie Blacktop INC | R4Shelly & Sands INC | R5Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,535 CY | $137 | $161 | $152 | $154 | $157 | 46% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 3,855 CY | $130 | $132 | $126 | $130 | $138 | 15% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5 INCH) | 195,674 SY | $1.05 | $0.50 | $1.25 | $0.90 | $0.77 | 6% |
| 251E01042 |
| Item | Quantity | R1Gerken Paving INC | R2Kokosing Construction Company INC | R3Erie Blacktop INC | R4Shelly & Sands INC | R5Karvo Companies INC |
|---|---|---|---|---|---|---|
| 202E30801 TRAFFIC ISLAND REMOVED, AS PER PLAN | 272 SY | $18.10 | $18.10 | $19.00 | $18.10 | $20.75 |
| 202E38000 GUARDRAIL REMOVED | 2,456.25 FT | $1.80 | $1.80 | $1.90 | $1.80 | $1.80 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 37.5 FT | $2.40 | $2.40 | $2.55 | $2.40 | $2.40 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,120 CY |
| $178 |
| $170 |
| $160 |
| $220 |
| $215 |
| 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2.5 INCH) | 76,875 SY | $1.75 | $0.49 | $1.90 | $1.25 | $1.48 | 4% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 72,653 FT | $1.65 | $0.25 | $1.25 | $0.20 | $0.72 | 4% |
| 617E10100 COMPACTED AGGREGATE | 2,100 CY | $49.00 | $56.00 | $44.00 | $45.00 | $25.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $212,997 | $140,000 | $257,000 | $225,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $100,000 | $100,000 | $100,000 | $178,000 | 2% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 280 CY | $265 | $450 | $225 | $380 | $325 | 2% |
| 407E10000 TACK COAT | 26,104 GAL | $1.90 | $2.05 | $2.05 | $1.85 | $2.25 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 14,395 GAL | $3.40 | $3.45 | $3.85 | $3.25 | $3.00 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 19 EACH | $2,125 | $2,125 | $2,230 | $2,125 | $2,125 | 1% |
| 209E60500 LINEAR GRADING | 21.39 MILE | $1,875 | $1,300 | $1,475 | $1,500 | $1,400 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,825.5 FT | $16.50 | $16.50 | $17.35 | $16.50 | $16.50 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 33.47 MILE | $875 | $875 | $920 | $875 | $875 | 1% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 27.52 MILE | $900 | $625 | $945 | $1,000 | $625 | 1% |
| 621E00100 RPM | 978 EACH | $22.50 | $22.50 | $23.65 | $22.50 | $23.00 | 1% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 80 CY | $260 | $175 | $160 | $350 | $218 | 1% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 26 EACH | $730 | $400 | $400 | $800 | $410 | 1% |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 23 EACH | $135 | $135 | $142 | $135 | $145 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 8 EACH | $100 | $100 | $105 | $100 | $125 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 24 EACH | $75.00 | $75.00 | $78.75 | $75.00 | $75.00 |
| 203E10000 EXCAVATION | 4 CY | $90.00 | $90.00 | $94.50 | $90.00 | $90.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 91 CY | $68.50 | $68.50 | $71.95 | $68.50 | $68.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 37.44 STA | $50.00 | $50.00 | $52.50 | $50.00 | $50.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 7.96 MILE | $495 | $2,000 | $1,220 | $1,500 | $1,850 |
| 209E80000 GRADING MAILBOX APPROACHES | 14 EACH | $225 | $25.00 | $350 | $25.00 | $35.00 |
| 606E13000 GUARDRAIL, TYPE 5 | 506.25 FT | $16.40 | $16.40 | $17.25 | $16.40 | $17.20 |
| 606E13050 GUARDRAIL, TYPE 5A | 37.5 FT | $22.60 | $22.60 | $23.75 | $22.60 | $23.40 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 25 FT | $27.50 | $27.50 | $29.00 | $27.50 | $29.50 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 100 FT | $19.20 | $19.20 | $20.20 | $19.20 | $19.20 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E (MASH 2016) | 4 EACH | $2,020 | $2,020 | $2,120 | $2,020 | $2,050 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 8 EACH | $980 | $980 | $1,030 | $980 | $980 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,050 | $2,050 | $2,155 | $2,050 | $2,120 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 20 EACH | $785 | $785 | $825 | $785 | $785 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 13 EACH | $685 | $500 | $720 | $685 | $770 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $1,725 | $1,725 | $1,815 | $1,725 | $2,255 |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 20 CY | $450 | $415 | $225 | $450 | $400 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.25 INCH) | 424 SY | $2.00 | $0.49 | $3.50 | $4.00 | $1.62 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (TAPER 2.5" TO | 3,361 SY | $2.00 | $0.49 | $3.50 | $3.00 | $1.78 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 958 SY | $2.00 | $0.49 | $1.90 | $2.50 | $2.90 |
| 254E01600 PATCHING PLANED SURFACE | 1,367 SY | $6.00 | $1.25 | $6.85 | $3.00 | $1.00 |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 115 CY | $141 | $161 | $152 | $154 | $157 |
| 609E54001 6" CONCRETE TRAFFIC ISLAND, AS PER PLAN | 272 SY | $66.00 | $66.00 | $70.00 | $66.00 | $94.65 |
| 617E20000 SHOULDER PREPARATION | 26,646 SY | $0.25 | $0.10 | $0.20 | $0.10 | $0.25 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 13.76 MILE | $625 | $625 | $660 | $800 | $625 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 976 EACH | $5.00 | $3.00 | $6.50 | $3.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 50 EACH | $7.50 | $7.50 | $7.90 | $7.50 | $7.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 29.54 MILE | $613 | $615 | $645 | $613 | $615 |
| 642E00300 CENTER LINE, TYPE 1 | 14.74 MILE | $550 | $850 | $895 | $550 | $850 |
| 644E00500 STOP LINE | 592 FT | $8.90 | $6.00 | $6.30 | $8.90 | $6.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $60.00 | $65.00 | $65.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,600 | $3,600 | $3,800 | $3,600 | $4,000 |
| 614E12460 WORK ZONE MARKING SIGN | 73 EACH | $50.00 | $50.00 | $52.50 | $50.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $300 | $125 | $358 | $200 | $100 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 214 FT | $3.50 | $3.50 | $3.70 | $3.50 | $3.50 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 88 FT | $4.50 | $4.50 | $4.75 | $4.50 | $4.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 80 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 88 FT | $82.00 | $82.00 | $86.20 | $82.00 | $87.50 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 82 FT | $2.44 | $2.44 | $2.55 | $2.44 | $10.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 82 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 281 SY | $8.15 | $8.15 | $8.55 | $8.15 | $20.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 153 FT | $1.95 | $1.95 | $2.05 | $1.95 | $5.00 |
| 516E31000 JOINT SEALER | 82 FT | $16.52 | $16.52 | $17.35 | $16.52 | $10.00 |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 88 FT | $82.00 | $82.00 | $86.20 | $82.00 | $87.50 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 100 FT | $4.50 | $4.50 | $4.75 | $4.50 | $4.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 86 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 100 FT | $82.00 | $82.00 | $86.20 | $82.00 | $87.50 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 50 FT | $4.50 | $4.50 | $4.75 | $4.50 | $4.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 82 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 50 FT | $82.00 | $82.00 | $86.20 | $82.00 | $87.50 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 88 FT | $2.44 | $2.44 | $2.55 | $2.44 | $10.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 88 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,105 SY | $8.15 | $8.15 | $8.55 | $8.15 | $18.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 678 FT | $1.95 | $1.95 | $2.05 | $1.95 | $5.00 |
| 516E31000 JOINT SEALER | 88 FT | $16.52 | $16.52 | $17.35 | $16.52 | $10.00 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 90 FT | $2.44 | $2.44 | $2.55 | $2.44 | $10.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 174 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 729 SY | $8.15 | $8.15 | $8.55 | $8.15 | $18.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 417 FT | $1.95 | $1.95 | $2.05 | $1.95 | $5.00 |
| 516E31000 JOINT SEALER | 90 FT | $16.52 | $16.52 | $17.35 | $16.52 | $10.00 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 90 FT | $2.44 | $2.44 | $2.55 | $2.44 | $10.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 166 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 455 SY | $8.15 | $8.15 | $8.55 | $8.15 | $20.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 267 FT | $1.95 | $1.95 | $2.05 | $1.95 | $5.00 |
| 516E31000 JOINT SEALER | 90 FT | $16.52 | $16.52 | $17.35 | $16.52 | $10.00 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 88 FT | $4.50 | $4.50 | $4.75 | $4.50 | $4.00 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 88 FT | $16.52 | $16.52 | $17.35 | $16.52 | $20.00 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 88 FT | $82.00 | $82.00 | $86.20 | $82.00 | $87.50 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,300 | $8,000 | $6,500 | $10,000 | $5,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,000 | $15,000 | $20,000 | $20,000 | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,250 | $1,500 | $2,175 | $2,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,000 | $4,000 | $9,500 | $5,000 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,535 CY | $137 | $1.58M | 42% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 3,855 CY | $130 | $501k | 13% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5 INCH) | 195,674 SY | $1.05 | $205k | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,120 CY | $178 | $199k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2.5 INCH) | 76,875 SY | $1.75 | $135k | 4% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 72,653 FT | $1.65 | $120k | 3% |
| 617E10100 COMPACTED AGGREGATE | 2,100 CY | $49 | $103k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $100k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75k | 2% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 280 CY | $265 | $74k | 2% |