SCI-US 23-05.49 Safety
SCI County · est $0.5M
Bid dateThursday, November 5—
SCI County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Shelly Company | R3D G M INC | R4Axis Civil Construction LLC | R5Eclipse CO LLC | R6Fillmore Construction | % of bid |
|---|---|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $76,292 | $28,000 | $20,000 | $25,000 | $71,736 | $31,900 | 18% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 472 CY | $160 | $160 | $192 | $190 | $170 | $180 | 18% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,625 | $22,000 | $55,000 | $36,000 | $24,514 |
| Item | Quantity | R1Allard Excavation LLC | R2Shelly Company | R3D G M INC | R4Axis Civil Construction LLC | R5Eclipse CO LLC | R6Fillmore Construction |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,862 | $10,000 | $15,000 | $10,000 | $5,296 | $25,000 |
| 201E21800 TREE REMOVED, 18" | 14 EACH | $220 | $750 | $400 | $400 | $795 | $1,000 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $126 | $550 | $200 | $700 | $341 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $25,000 |
| 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (115 CY | $220 | $220 | $238 | $265 | $233 | $190 | 6% |
| 203E20000 EMBANKMENT | 2,459 CY | $9.20 | $12.00 | $25.00 | $22.00 | $10.85 | $25.00 | 5% |
| 203E10000 EXCAVATION | 2,479 CY | $8.92 | $16.00 | $20.00 | $22.00 | $14.45 | $20.00 | 5% |
| 832E30000 EROSION CONTROL | 21,203 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 304E20000 AGGREGATE BASE | 428 CY | $45.50 | $68.00 | $65.00 | $80.00 | $56.24 | $50.00 | 5% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 82 CY | $225 | $225 | $275 | $265 | $239 | $200 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,040 | $6,600 | $5,000 | $10,000 | $22,555 | $6,500 | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 157 SY | $76.00 | $80.00 | $75.00 | $90.00 | $101 | $150 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,690 | $6,009 | $7,500 | $7,500 | $6,505 | $8,500 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,160 FT | $9.17 | $9.50 | $15.00 | $14.00 | $10.61 | $15.00 | 3% |
| 659E00300 TOPSOIL | 783.2 CY | $11.56 | $25.00 | $15.00 | $38.00 | $48.42 | $30.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 670 FT | $13.25 | $24.00 | $15.00 | $16.00 | $20.67 | $25.00 | 2% |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 106 EACH | $78.00 | $78.00 | $65.00 | $80.00 | $63.60 | $78.00 | 2% |
| 611E05700 15" CONDUIT, TYPE A, 706.01, 706.02; 18" 707.01, 7 | 111 FT | $73.27 | $75.25 | $90.00 | $80.00 | $96.53 | $240 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 350 FT | $22.88 | $19.00 | $24.00 | $19.00 | $24.25 | $30.00 | 2% |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $1,950 | $2,000 | $1,700 | $2,014 | $2,500 | 2% |
| 659E10000 SEEDING AND MULCHING | 6,515 SY | $1.15 | $0.89 | $1.50 | $1.00 | $1.18 | $1.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 1,693 SY | $2.25 | $8.50 | $5.00 | $10.00 | $26.31 | $5.00 |
| 202E32500 CURB AND GUTTER REMOVED | 169 FT | $6.17 | $18.75 | $2.00 | $13.00 | $6.97 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 197 FT | $7.25 | $19.50 | $15.00 | $33.00 | $27.24 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 260 FT | $2.50 | $4.00 | $1.00 | $4.00 | $4.28 | $5.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $252 | $565 | $250 | $1,000 | $846 | $250 |
| 204E10000 SUBGRADE COMPACTION | 2,522 SY | $1.95 | $2.50 | $2.00 | $2.00 | $2.24 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 188 FT | $21.42 | $18.00 | $22.00 | $18.00 | $22.71 | $25.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 1 EACH | $1,375 | $1,450 | $1,500 | $1,450 | $1,458 | $2,500 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $83.77 | $495 | $50.00 | $100 | $158 | $200 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 17 CY | $82.92 | $175 | $100 | $120 | $73.48 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 325.8 SY | $0.05 | $0.68 | $0.05 | $1.00 | $1.18 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.88 TON | $500 | $668 | $650 | $610 | $721 | $610 |
| 659E31000 LIME | 0.15 ACRE | $200 | $153 | $80.00 | $80.00 | $94.47 | $80.00 |
| 659E35000 WATER | 35.2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.18 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 434 SY | $2.35 | $1.89 | $2.00 | $2.50 | $2.95 | $2.50 |
| 670E00700 DITCH EROSION PROTECTION | 90 SY | $2.35 | $1.59 | $3.00 | $2.50 | $2.95 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,662 | $1,450 | $2,000 | $1,500 | $1,696 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,875 | $720 | $4,000 | $16,400 | $7,950 | $16,400 |
| 602E20000 CONCRETE MASONRY | 0.93 CY | $1,763 | $2,300 | $2,000 | $3,000 | $1,235 | $1,500 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 45 FT | $7.63 | $45.00 | $20.00 | $14.00 | $25.21 | $30.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $18.26 | $18.50 | $6.00 | $8.00 | $19.71 | $100 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $18.26 | $18.50 | $4.00 | $8.00 | $19.71 | $100 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $31.78 | $35.00 | $15.00 | $35.00 | $76.02 | $100 |
| 611E04400 12" CONDUIT, TYPE B, 706.01, 706.02, 707.34, 707.3 | 98 FT | $68.52 | $42.00 | $80.00 | $80.00 | $84.91 | $200 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 22 FT | $89.40 | $75.25 | $125 | $80.00 | $90.37 | $200 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,264 | $3,450 | $4,000 | $3,800 | $3,806 | $5,000 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,083 | $2,450 | $2,000 | $3,200 | $3,098 | $6,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $255 | $1,560 | $300 | $224 | $300 |
| 407E10000 TACK COAT | 330 GAL | $1.85 | $1.85 | $2.80 | $4.00 | $1.96 | $5.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 137 FT | $42.63 | $59.50 | $30.00 | $45.00 | $45.08 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 11 EACH | $9.00 | $8.00 | $10.00 | $8.00 | $9.54 | $100 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 70 FT | $12.00 | $12.50 | $12.00 | $12.50 | $11.66 | $11.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $25.00 | $45.00 | $30.00 | $45.00 | $79.50 | $75.00 |
| 630E80100 SIGN, FLAT SHEET | 43 SF | $30.00 | $20.00 | $30.00 | $20.00 | $26.50 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $20.00 | $20.00 | $20.00 | $20.00 | $21.20 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $20.00 | $20.00 | $20.00 | $20.00 | $26.50 | $25.00 |
| 644E00100 EDGE LINE, 4" | 0.25 MILE | $8,328 | $4,752 | $8,700 | $10,550 | $11,183 | $11,000 |
| 644E00300 CENTER LINE | 0.11 MILE | $17,119 | $9,693 | $19,000 | $12,110 | $12,837 | $13,000 |
| 644E00500 STOP LINE | 23 FT | $24.00 | $12.10 | $25.00 | $10.00 | $10.60 | $10.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 850 FT | $3.37 | $3.18 | $2.50 | $4.85 | $5.14 | $5.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $65.00 | $50.00 | $75.00 | $68.90 | $100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 12 EACH | $12.00 | $12.63 | $15.00 | $10.00 | $10.60 | $44.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 3 EACH | $12.00 | $12.62 | $20.00 | $10.00 | $11.66 | $118 |
| 614E13350 OBJECT MARKER, ONE WAY | 12 EACH | $12.00 | $12.63 | $15.00 | $17.00 | $13.78 | $50.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 3 EACH | $12.00 | $12.62 | $20.00 | $17.00 | $15.90 | $120 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 1 SNMT | $1,650 | $1,650 | $2,000 | $1,200 | $954 | $1,650 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.04 MILE | $24,445 | $24,445 | $25,000 | $12,085 | $12,810 | $25,000 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.09 MILE | $10,599 | $10,599 | $12,000 | $11,900 | $12,614 | $12,000 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I ( | 0.41 MILE | $5,895 | $5,898 | $6,000 | $9,240 | $9,794 | $6,000 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 38 FT | $12.50 | $12.50 | $15.00 | $5.00 | $5.30 | $13.00 |
| 616E10000 WATER | 11.5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $10.69 | $1.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $5,000 | $2,500 | $7,500 | $6,557 | $5,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,605 | $3,000 | $17,500 | $6,000 | $8,524 | $5,500 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,200 | $1,550 | $750 | $1,600 | $850 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $76,292 | $76k | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 472 CY | $160 | $76k | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,625 | $29k | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (115 CY | $220 | $25k | 5% |
| 203E20000 EMBANKMENT | 2,459 CY | $9.2 | $23k | 4% |
| 203E10000 EXCAVATION | 2,479 CY | $8.92 | $22k | 4% |
| 832E30000 EROSION CONTROL | 21,203 EACH | $1 | $21k | 4% |
| 304E20000 AGGREGATE BASE | 428 CY | $45.5 | $19k | 4% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 82 CY | $225 | $18k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $14,040 | $14k | 3% |