STA-SR MCRO FY2021(B)
STA County · est $0.9M
Bid dateThursday, November 5—
STA County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Pavement Maintenance Systems LLC | R2Strawser Construction INC | R3American Pavements INC | R4Missouri Petroleum Products Company | R5Microsurfacing Contractors LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 187,879 SY | $2.58 | $2.48 | $2.83 | $2.89 | $3.05 | 56% |
| 646E10010 EDGE LINE, 6" | 18.09 MILE | $2,915 | $2,700 | $2,610 | $2,915 | $2,700 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $103 | $80.00 | $80.00 | $140 | $103 | 6% |
| Item | Quantity | R1Pavement Maintenance Systems LLC | R2Strawser Construction INC | R3American Pavements INC | R4Missouri Petroleum Products Company | R5Microsurfacing Contractors LLC |
|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 154 FT | $4.30 | $4.30 | $2.00 | $4.30 | $4.30 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 3 EACH | $300 | $300 | $100 | $300 | $300 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9.91 MILE |
| $4,182 |
| $2,920 |
| $2,860 |
| $4,182 |
| $2,920 |
| 5% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 21.31 MILE | $1,473 | $1,473 | $1,584 | $1,473 | $1,473 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $28,870 | $89,396 | $57,900 | $77,500 | $150,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,900 | $60,754 | $62,000 | $75,300 | $93,500 | 3% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 17 EACH | $1,120 | $550 | $500 | $1,200 | $1,120 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,170 | $1,200 | $250 | $2,500 | $3,000 | 2% |
| 621E00100 RPM | 725 EACH | $25.50 | $25.50 | $25.50 | $27.80 | $25.50 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 19.82 MILE | $825 | $1,000 | $825 | $825 | $943 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,281 | $1,000 | $8,300 | $12,281 | $750 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $1,525 | $1,035 | $750 | $1,400 | $1,525 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 11 EACH | $1,020 | $600 | $425 | $1,000 | $1,020 | 1% |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 7.53 MILE | $1,473 | $1,473 | $1,584 | $1,473 | $1,473 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 589 EACH | $18.75 | $20.00 | $16.00 | $25.00 | $26.50 | 1% |
| 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON | 1 LS | $6,370 | $4,500 | $4,500 | $3,000 | $20,000 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 3 EACH | $1,210 | $1,275 | $1,000 | $1,100 | $1,210 | 0% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $70.00 | $75.00 | $85.00 | $65.00 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $900 | $900 | $900 | $900 | $900 | 0% |
| 646E10110 LANE LINE, 6" |
| 0.84 MILE |
| $1,892 |
| $1,680 |
| $1,410 |
| $1,892 |
| $1,680 |
| 646E10400 STOP LINE | 114 FT | $7.90 | $12.00 | $10.00 | $7.90 | $12.00 |
| 646E10500 CROSSWALK LINE | 40 FT | $3.80 | $7.00 | $5.25 | $3.80 | $7.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $510 | $625 | $600 | $510 | $625 |
| 646E20300 LANE ARROW | 1 EACH | $250 | $200 | $155 | $250 | $200 |
| 646E20350 LANE REDUCTION ARROW | 6 EACH | $250 | $375 | $200 | $250 | $375 |
| 646E20504 DOTTED LINE, 6" | 995 FT | $1.60 | $1.35 | $1.60 | $1.60 | $1.35 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 3 EACH | $90.00 | $90.00 | $100 | $90.00 | $90.00 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 995 FT | $0.39 | $0.39 | $2.00 | $0.39 | $0.39 |
| 614E12460 WORK ZONE MARKING SIGN | 44 EACH | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $135 | $400 | $250 | $700 | $250 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.68 MILE | $600 | $695 | $600 | $600 | $693 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 228 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 187,879 SY | $2.58 | $485k | 55% |
| 646E10010 EDGE LINE, 6" | 18.09 MILE | $2,915 | $53k | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $102.5 | $51k | 6% |
| 646E10200 CENTER LINE | 9.91 MILE | $4,182 | $41k | 5% |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 21.31 MILE | $1,473 | $31k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $28,870 | $29k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,900 | $26k | 3% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 17 EACH | $1,120 | $19k | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,170 | $19k | 2% |
| 621E00100 RPM | 725 EACH | $25.5 | $18k | 2% |