BRO-US 52-15.20 OH18-01
BRO County · est $0.2M
Bid dateThursday, December 3—
BRO County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Distel Construction INC | R3Sunesis Construction CO | R4Eclipse CO LLC | R5D G M INC | R6R C Construction Company And Son INC | R7John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,000 | $1,000 | $7,800 | $11,454 | $30,000 | $12,500 | $22,593 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $47,790 | $51,000 | $43,425 | $51,500 | $55,000 | $62,793 | 10% |
| 614E12384 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Distel Construction INC | R3Sunesis Construction CO | R4Eclipse CO LLC | R5D G M INC | R6R C Construction Company And Son INC | R7John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $400 | $500 | $590 | $278 | $400 | $1,500 | $487 |
| 202E38000 GUARDRAIL REMOVED | 12.5 FT | $3.00 | $20.00 | $15.00 | $12.03 | $2.00 | $5.00 | $9.60 |
| 203E20000 EMBANKMENT | 7 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| — |
| $1,850 |
| $2,280 |
| $2,000 |
| $1,995 |
| $1,800 |
| $1,800 |
| $1,900 |
| 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 99 CY | $220 | $331 | $285 | $368 | $290 | $395 | $394 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $10,755 | $36,000 | $44,226 | $15,000 | $20,000 | $10,000 | 8% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 950 FT | $18.00 | $23.50 | $25.00 | $21.00 | $18.00 | $30.00 | $20.00 | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $16,000 | $10,000 | $26,700 | $13,860 | $19,000 | $35,000 | $17,377 | 7% |
| 611E10400 24" CONDUIT, TYPE B, (VARIOUS) | 87 FT | $180 | $494 | $290 | $170 | $550 | $275 | $166 | 7% |
| 611E10600 24" CONDUIT, TYPE C | 96 FT | $120 | $144 | $142 | $106 | $240 | $275 | $246 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 33 CY | $320 | $392 | $47.00 | $499 | $345 | $450 | $574 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 103 SY | $100 | $125 | $122 | $235 | $80.00 | $125 | $169 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $12,267 | $5,250 | $8,987 | $4,000 | $15,000 | $3,044 | 3% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 207 FT | $35.00 | $50.00 | $20.00 | $17.60 | $50.00 | $35.00 | $94.12 | 3% |
| 304E20000 AGGREGATE BASE | 67 CY | $85.00 | $50.00 | $140 | $90.76 | $85.00 | $125 | $157 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 638E20770 SPECIAL - 1" COPPER WATER SERVICE LINE , AS PER PL | 150 FT | $30.00 | $20.00 | $47.00 | $29.77 | $50.00 | $40.00 | $47.19 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $6,317 | $2,500 | $5,037 | $18,000 | $12,500 | $1,531 | 2% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,000 | $4,338 | $4,300 | $5,832 | $6,000 | $5,000 | $5,072 | 2% |
| 203E10000 EXCAVATION | 145 CY | $26.00 | $25.00 | $52.00 | $24.53 | $30.00 | $25.00 | $110 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,100 | $2,250 | $1,400 | $630 | $750 | $100 | $1,847 | 1% |
| $26.00 |
| $200 |
| $26.00 |
| $74.61 |
| $50.00 |
| $25.00 |
| $146 |
| 204E10000 SUBGRADE COMPACTION | 413 SY | $3.00 | $3.00 | $8.00 | $1.95 | $10.00 | $2.00 | $4.39 |
| 204E45000 PROOF ROLLING | 0.14 HOUR | $185 | $5,000 | $1,400 | $688 | $100 | $100 | $217 |
| 204E50000 GEOTEXTILE FABRIC | 42 SY | $3.00 | $20.00 | $5.00 | $2.53 | $5.00 | $10.00 | $18.01 |
| 606E15050 GUARDRAIL, TYPE MGS | 12.5 FT | $21.00 | $250 | $75.00 | $205 | $60.00 | $150 | $195 |
| 601E28100 DUMPED ROCK FILL, TYPE C | 24.4 CY | $90.00 | $100 | $100 | $86.41 | $90.00 | $125 | $212 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1.8 CY | $125 | $250 | $200 | $698 | $150 | $125 | $721 |
| 659E10000 SEEDING AND MULCHING | 47 SY | $3.00 | $60.00 | $6.00 | $54.60 | $45.00 | $25.00 | $34.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $650 | $1,000 | $500 | $641 | $650 | $1,200 | $1,600 |
| 659E31000 LIME | 0.01 ACRE | $250 | $730 | $100 | $84.00 | $80.00 | $800 | $150 |
| 659E35000 WATER | 1 MGAL | $1.00 | $10.00 | $1.00 | $1.05 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $2,500 | $10,425 | $3,600 | $1,410 | $1,500 | $1,950 | $2,419 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 222 FT | $12.00 | $15.00 | $12.00 | $10.85 | $24.00 | $50.00 | $32.86 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 11 FT | $20.00 | $20.00 | $45.00 | $35.97 | $30.00 | $25.00 | $41.49 |
| 611E00900 6" CONDUIT, TYPE B | 33 FT | $20.00 | $30.00 | $60.00 | $24.22 | $25.00 | $25.00 | $42.39 |
| 611E01100 6" CONDUIT, TYPE C | 67 FT | $20.00 | $20.00 | $50.00 | $21.78 | $20.00 | $25.00 | $44.18 |
| 611E97200 CONDUIT, MISC.: CLEANOUT | 2 EACH | $1,000 | $350 | $1,200 | $3,791 | $200 | $500 | $1,583 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,200 | $2,892 | $3,900 | $3,858 | $2,500 | $3,500 | $3,008 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $300 | $380 | $326 | $200 | $275 | $396 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 64 FT | $4.00 | $5.00 | $9.00 | $12.27 | $10.00 | $50.00 | $5.00 |
| 407E10000 TACK COAT | 40 GAL | $3.00 | $10.50 | $2.00 | $5.25 | $9.50 | $10.00 | $39.73 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 28 SY | $88.00 | $125 | $170 | $145 | $100 | $100 | $376 |
| 621E00100 RPM | 2 EACH | $1,500 | $1,770 | $1,500 | $1,145 | $1,500 | $1,500 | $1,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $30.00 | $25.00 | $15.00 | $41.49 | $1.00 | $50.00 | $23.58 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.04 MILE | $28,850 | $34,043 | $29,000 | $28,828 | $30,000 | $12,500 | $28,850 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $54,750 | $64,609 | $55,000 | $52,884 | $57,500 | $12,500 | $54,750 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $85.00 | $75.00 | $68.25 | $50.00 | $35.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 850 FT | $2.00 | $2.35 | $2.00 | $2.63 | $2.25 | $10.00 | $15.04 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 16 EACH | $8.00 | $59.00 | $50.00 | $11.55 | $50.00 | $20.00 | $19.16 |
| 614E13360 OBJECT MARKER, TWO WAY | 16 EACH | $15.00 | $59.00 | $50.00 | $15.75 | $50.00 | $20.00 | $19.16 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.22 MILE | $10,250 | $12,095 | $10,250 | $7,476 | $11,000 | $12,500 | $10,250 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.23 MILE | $9,500 | $11,210 | $9,500 | $7,135 | $10,000 | $12,500 | $9,500 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 26 FT | $14.00 | $17.00 | $15.00 | $5.25 | $15.00 | $50.00 | $14.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $10.00 | $155 | $121 | $1.00 | $1.00 | $9.67 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,000 | $25k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 9% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,850 | $22k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 99 CY | $220 | $22k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 950 FT | $18 | $17k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $16,000 | $16k | 6% |
| 611E10400 24" CONDUIT, TYPE B, (VARIOUS) | 87 FT | $180 | $16k | 6% |
| 611E10600 24" CONDUIT, TYPE C | 96 FT | $120 | $12k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 33 CY | $320 | $11k | 4% |