BRO-SR 41-03.34 Safety
BRO County · est $0.2M
Bid dateThursday, December 17—
BRO County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Fillmore Construction | R3Rack & Ballauer Excavating CO INC | R4D G M INC | R5Eclipse CO LLC | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 1,616 SY | $22.80 | $18.00 | $18.00 | $22.80 | $23.75 | $22.80 | 20% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $34,500 | $42,500 | $10,000 | $42,700 | $10,000 | 10% |
| 611E13400 30" CONDUIT, TYPE B, (VARIOUS) | 42 FT | $390 | $100 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Fillmore Construction | R3Rack & Ballauer Excavating CO INC | R4D G M INC | R5Eclipse CO LLC | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 99 SY | $12.00 | $10.00 | $34.00 | $15.00 | $18.00 | $87.38 |
| 202E35200 PIPE REMOVED, OVER 24" | 30 FT | $110 | $100 | $41.00 | $75.00 | $70.25 | $110 |
| 204E10000 SUBGRADE COMPACTION | 314 SY | $3.00 | $10.00 | $7.00 | $8.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $170 |
| $470 |
| $247 |
| $404 |
| 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 45 CY | $320 | $200 | $325 | $335 | $333 | $437 | 8% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $3,500 | $4,500 | $4,500 | $14,500 | $7,653 | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $9,500 | $13,500 | $22,000 | $15,080 | $25,892 | 6% |
| 304E20000 AGGREGATE BASE | 45 CY | $180 | $60.00 | $85.00 | $90.00 | $64.75 | $221 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $39,200 | $22,500 | $31,000 | $22,716 | $56,273 | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $17.75 | $19.75 | $17.75 | $18.00 | $16.50 | $17.75 | 3% |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,200 FT | $4.92 | $2.10 | $2.10 | $2.50 | $2.25 | $2.10 | 3% |
| 659E00300 TOPSOIL | 136 CY | $40.00 | $20.00 | $60.00 | $15.00 | $63.50 | $54.78 | 3% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.11 MILE | $48,000 | $50,000 | $105,000 | $50,000 | $49,920 | $67,040 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (13 CY | $400 | $300 | $525 | $345 | $343 | $645 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $65.00 | $100 | $70.00 | $40.00 | $67.50 | $107 | 3% |
| 203E20000 EMBANKMENT | 287 CY | $17.00 | $60.00 | $20.00 | $25.00 | $21.00 | $33.81 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,385 | $2,350 | $2,385 | $2,900 | $2,975 | $2,385 | 3% |
| 203E10000 EXCAVATION | 266 CY | $17.00 | $50.00 | $30.00 | $25.00 | $18.75 | $32.23 | 2% |
| 611E98231 CATCH BASIN, NO. 4, AS PER PLAN | 1 EACH | $4,500 | $5,000 | $7,200 | $8,000 | $6,240 | $6,354 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 212.5 FT | $19.50 | $22.50 | $19.50 | $19.00 | $17.75 | $19.50 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $400 | $340 | $650 | $350 | $349 | $798 | 2% |
| $6.36 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 4 CY | $125 | $200 | $215 | $150 | $118 | $488 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $125 | $150 | $200 | $150 | $121 | $867 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 | $100 | $50.00 | $104 | $200 |
| 659E10000 SEEDING AND MULCHING | 1,229 SY | $2.65 | $2.65 | $3.50 | $2.50 | $2.75 | $2.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 61 SY | $2.65 | $2.65 | $1.00 | $0.05 | $2.75 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $610 | $610 | $800 | $650 | $635 | $500 |
| 659E31000 LIME | 0.25 ACRE | $80.00 | $80.00 | $200 | $80.00 | $83.24 | $200 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $25.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 4.7 CY | $700 | $1,000 | $775 | $1,300 | $519 | $1,079 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $6.00 | $20.00 | $15.00 | $6.00 | $27.00 | $42.76 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $6.00 | $20.00 | $15.00 | $5.00 | $11.50 | $42.76 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $6.00 | $20.00 | $15.00 | $5.00 | $11.50 | $42.76 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 602 FT | $2.00 | $3.00 | $2.00 | $3.00 | $2.00 | $2.00 |
| 407E10000 TACK COAT | 30 GAL | $4.00 | $4.00 | $1.00 | $1.85 | $2.00 | $5.00 |
| 621E00100 RPM | 27 EACH | $129 | $101 | $101 | $110 | $105 | $101 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 15 EACH | $20.00 | $5.00 | $15.00 | $1.00 | $9.75 | $31.52 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 11 EACH | $14.00 | $10.00 | $14.00 | $15.00 | $13.50 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 124 FT | $10.00 | $15.00 | $12.75 | $13.00 | $13.25 | $12.75 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $25.00 | $45.00 | $54.00 | $60.00 | $56.25 | $54.00 |
| 630E80100 SIGN, FLAT SHEET | 67 SF | $25.00 | $20.00 | $17.00 | $20.00 | $17.75 | $17.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 13 EACH | $15.00 | $20.00 | $20.00 | $15.00 | $20.75 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $15.00 | $20.00 | $30.00 | $15.00 | $31.25 | $30.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.22 MILE | $5,555 | $6,735 | $6,735 | $6,000 | $7,005 | $6,735 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $11,425 | $6,920 | $6,920 | $11,000 | $7,197 | $6,920 |
| 614E12420 DETOUR SIGNING | 1 LS | $1,189 | $6,465 | $6,000 | $3,000 | $6,724 | $5,995 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.11 MILE | $10,550 | $6,875 | $6,875 | $11,000 | $7,150 | $6,875 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.16 MILE | $9,500 | $8,100 | $8,100 | $10,000 | $8,424 | $8,100 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.22 MILE | $5,500 | $6,790 | $6,790 | $6,000 | $7,062 | $6,790 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 49 FT | $14.00 | $10.00 | $10.00 | $14.00 | $10.50 | $10.00 |
| 616E10000 WATER | 1 MGAL | $10.00 | $1.00 | $95.00 | $1.00 | $123 | $719 |
| 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON | 1 LS | $3,500 | $3,500 | $2,500 | $17,500 | $7,500 | $2,846 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 421E10010 MICROSURFACING, SURFACE COURSE | 1,616 SY | $22.8 | $37k | 16% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 8% |
| 611E13400 30" CONDUIT, TYPE B, (VARIOUS) | 42 FT | $390 | $16k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 45 CY | $320 | $14k | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $13k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $12k | 5% |
| 304E20000 AGGREGATE BASE | 45 CY | $180 | $8k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $8k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $17.75 | $6k | 3% |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 1,200 FT | $4.92 | $6k | 3% |