ASD-SR 60-09.95
ASD County · est $0.2M
Bid dateThursday, June 4—
ASD County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Rietschlin Construction INC | R4The Weber Company LLC | R5Kelstin INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 84 FT | $640 | $454 | $650 | $650 | $590 | 26% |
| 203E10000 EXCAVATION | 1,418 CY | $15.00 | $13.00 | $15.00 | $20.00 | $20.00 | 10% |
| 203E20000 EMBANKMENT | 994 CY | $20.00 | $7.50 | $13.00 | $20.00 | $25.00 | 10% |
| 659E00300 TOPSOIL | 298 CY | $50.00 | $63.00 | $20.00 | $65.00 | $40.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $15,000 | $18,000 | $7,000 | $15,000 | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 12 CY | $900 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Eclipse CO LLC | R3Rietschlin Construction INC | R4The Weber Company LLC | R5Kelstin INC |
|---|---|---|---|---|---|---|
| 204E10000 SUBGRADE COMPACTION | 237 SY | $2.00 | $4.00 | $5.00 | $2.00 | $5.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,200 | $1,013 | $880 | $260 | $100 |
| 601E11000 RIPRAP, TYPE D | 16 SY | $150 | $165 | $190 | $290 | $50.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $158 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $791 |
| $1,000 |
| $880 |
| $850 |
| 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 54 CY | $189 | $222 | $242 | $220 | $285 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,000 | $3,500 | $5,500 | $1,500 | $5,000 | 4% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 33 CY | $240 | $274 | $297 | $320 | $270 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $901 | $1,782 | $1,600 | $880 | $1,600 | 3% |
| 304E20000 AGGREGATE BASE | 81 CY | $65.00 | $58.00 | $100 | $81.00 | $62.50 | 3% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,000 | $6,036 | $8,600 | $500 | $3,200 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $15,413 | $5,100 | $5,000 | $3,000 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 44 CY | $110 | $93.00 | $105 | $193 | $160 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,629 | $9,500 | $2,750 | $6,500 | $4,000 | 2% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $4,000 | $1,931 | $1,680 | $3,800 | $1,500 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,369 LB | $1.62 | $4.00 | $2.00 | $1.50 | $1.25 | 2% |
| 202E23000 PAVEMENT REMOVED | 217 SY | $15.00 | $10.50 | $10.00 | $15.00 | $9.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 2,689 SY | $1.10 | $2.00 | $2.00 | $2.00 | $2.50 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 146 SY | $20.00 | $20.00 | $22.00 | $20.00 | $20.00 | 1% |
| $33.00 |
| $200 |
| $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 134 SY | $4.00 | $1.00 | $1.00 | $0.50 | $1.00 |
| 659E15000 INTER-SEEDING | 134 SY | $4.00 | $0.15 | $1.00 | $1.25 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.37 TON | $1,000 | $618 | $800 | $400 | $515 |
| 659E31000 LIME | 0.56 ACRE | $309 | $114 | $100 | $100 | $55.00 |
| 659E35000 WATER | 14.88 MGAL | $10.00 | $1.00 | $10.00 | $1.00 | $2.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 726 SY | $1.50 | $3.00 | $3.50 | $2.75 | $2.50 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 36 FT | $35.00 | $18.00 | $30.00 | $16.00 | $5.00 |
| 407E10000 TACK COAT | 66 GAL | $4.00 | $5.25 | $5.50 | $5.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 92 GAL | $5.00 | $15.00 | $16.50 | $15.00 | $15.00 |
| 621E00100 RPM | 2 EACH | $501 | $1,245 | $1,265 | $500 | $1,200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $50.00 | $20.00 | $45.00 | $10.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.18 MILE | $5,755 | $6,038 | $5,900 | $5,400 | $5,400 |
| 642E00300 CENTER LINE, TYPE 1 | 0.09 MILE | $9,300 | $11,813 | $7,900 | $7,500 | $7,200 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,900 | $2,940 | $3,200 | $2,900 | $3,500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,000 | $1,040 | $1,050 | $650 | $1,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 20 SY | $54.00 | $30.50 | $77.00 | $40.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 108 SY | $25.00 | $22.00 | $19.00 | $20.00 | $30.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,200 | $4,500 | $2,750 | $6,500 | $5,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,200 | $6,900 | $2,100 | $5,000 | $4,500 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $501 | $650 | $2,250 | $1,000 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 84 FT | $640 | $54k | 23% |
| 203E10000 EXCAVATION | 1,418 CY | $15 | $21k | 9% |
| 203E20000 EMBANKMENT | 994 CY | $20 | $20k | 8% |
| 659E00300 TOPSOIL | 298 CY | $50 | $15k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $13k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 12 CY | $900 | $11k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 54 CY | $189 | $10k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,000 | $8k | 3% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 33 CY | $240 | $8k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $901 | $7k | 3% |