ATH-SR 124-01.60
ATH County · est $2.1M
Bid dateThursday, February 13—
ATH County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Litman Excavating INC | R2Amaazz Construction Ohio LLC | R3Shecklers Excavating INC | R4Allard Excavation LLC | R5Beaver Excavating Company | R6Cast & Baker Corporation | R7Parker Corporation | R8Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 8,110 CY | $60.00 | $75.60 | $42.25 | $67.25 | $65.00 | $85.00 | $75.00 | $72.00 | 32% |
| 203E20000 EMBANKMENT | 50,514 CY | $5.00 | $2.70 | $8.15 | $3.16 | $4.95 | $1.50 |
| Item | Quantity | R1Litman Excavating INC | R2Amaazz Construction Ohio LLC | R3Shecklers Excavating INC | R4Allard Excavation LLC | R5Beaver Excavating Company | R6Cast & Baker Corporation | R7Parker Corporation | R8Shelly & Sands INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $12,533 | $2,980 | $37,500 | $94,550 | $55,000 | $10,000 | $1,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $500 | $234 | $250 | $215 | $90.53 | $350 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10.00 |
| $11.25 |
| 16% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN (NO. 8 AGGREGATE) | 2,217 CY | $102 | $70.20 | $44.30 | $49.50 | $41.00 | $38.00 | $60.00 | $128 | 15% |
| 203E10000 EXCAVATION | 48,010 CY | $4.00 | $6.00 | $8.91 | $4.83 | $4.70 | $10.00 | $8.35 | $4.00 | 12% |
| 622E41000 PORTABLE BARRIER, 32" | 960 FT | $80.00 | $21.80 | $18.25 | $17.30 | $26.00 | $30.00 | $10.00 | $18.00 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 220 CY | $265 | $283 | $237 | $195 | $195 | $240 | $233 | $226 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 199 CY | $221 | $229 | $221 | $182 | $182 | $200 | $185 | $192 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $31,388 | $1,635 | $13,800 | $17,000 | $7,245 | $16,000 | $22,000 | $12,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,000 | $12,260 | $22,000 | $67,000 | $140,325 | $60,000 | $10,000 | $6,150 | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $25,000 | $38,143 | $12,500 | $17,500 | $18,845 | $10,000 | $200 | $31,500 | 2% |
| 304E20000 AGGREGATE BASE | 205 CY | $84.00 | $87.30 | $100 | $66.25 | $75.13 | $88.00 | $75.00 | $71.00 | 1% |
| 611E01400 6" CONDUIT, TYPE E, 707.31, PERFORATED | 2,599 FT | $6.45 | $5.90 | $4.66 | $3.80 | $5.71 | $1.50 | $10.00 | $1.25 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $29,726 | $19,500 | $150,000 | $40,000 | $30,000 | $17,850 | $100,000 | 1% |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 1,050 FT | $12.00 | $10.90 | $11.00 | $12.20 | $9.96 | $13.00 | $10.00 | $10.00 | 1% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 2,028 CY | $6.00 | $79.90 | $44.85 | $71.36 | $64.00 | $85.00 | $72.00 | $68.00 | 1% |
| 659E00530 SEEDING AND MULCHING, CLASS 3B | 12,022 SY | $1.00 | $0.80 | $0.71 | $0.82 | $0.70 | $1.00 | $1.00 | $0.71 | 1% |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC, 712.09, TYPE A | 6,004 SY | $2.00 | $1.80 | $0.94 | $1.25 | $3.67 | $1.50 | $2.50 | $0.45 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $2,725 | $6,000 | $24,000 | $7,486 | $10,000 | $10,000 | $22,000 | 1% |
| 611E01500 6" CONDUIT, TYPE F, 707.33, NON-PERFORATED | 665 FT | $11.54 | $13.00 | $10.01 | $9.40 | $9.77 | $9.50 | $10.00 | $15.25 | 0% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 650 FT | $10.00 | $12.10 | $10.00 | $11.52 | $11.98 | $9.00 | $10.00 | $12.25 | 0% |
| $1,000 |
| $125 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,230 SY | $3.82 | $6.00 | $9.42 | $3.80 | $6.31 | $12.50 | $5.00 | $4.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 30 FT | $13.35 | $15.60 | $7.86 | $7.00 | $2.90 | $11.00 | $50.00 | $3.25 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 1,050 FT | $2.38 | $4.40 | $4.00 | $2.49 | $4.00 | $2.00 | $2.00 | $4.00 |
| 204E10000 SUBGRADE COMPACTION | 1,264 SY | $3.50 | $2.10 | $4.98 | $3.75 | $1.99 | $2.00 | $1.00 | $1.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 37 CY | $111 | $95.50 | $94.98 | $68.84 | $103 | $95.00 | $75.00 | $103 |
| 659E20000 COMMERCIAL FERTILIZER | 1.62 TON | $2,500 | $662 | $575 | $500 | $610 | $550 | $1,235 | $610 |
| 659E31000 LIME | 2.48 ACRE | $968 | $165 | $207 | $200 | $154 | $225 | $807 | $154 |
| 659E35000 WATER | 65 MGAL | $38.46 | $1.10 | $65.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.6 CY | $700 | $1,188 | $443 | $2,980 | $2,335 | $1,100 | $1,000 | $1,590 |
| 611E13600 30" CONDUIT, TYPE C | 52 FT | $48.00 | $69.10 | $185 | $196 | $113 | $75.00 | $100 | $96.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $1,000 | $290 | $1,000 | $225 | $217 | $550 | $150 | $275 |
| 407E20000 NON-TRACKING TACK COAT | 396 GAL | $5.00 | $4.40 | $9.90 | $3.25 | $3.25 | $4.25 | $5.00 | $4.00 |
| 621E00100 RPM | 29 EACH | $200 | $131 | $138 | $120 | $120 | $125 | $121 | $120 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 29 EACH | $200 | $10.00 | $10.48 | $8.00 | $11.90 | $55.00 | $5.00 | $4.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.44 MILE | $8,000 | $2,016 | $2,128 | $1,850 | $1,850 | $2,000 | $1,851 | $1,850 |
| 642E00300 CENTER LINE, TYPE 1 | 0.22 MILE | $13,636 | $3,494 | $3,688 | $3,206 | $3,205 | $3,400 | $3,207 | $3,205 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,500 | $2,180 | $6,250 | $2,500 | $2,000 | $2,600 | $1,500 | $2,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 20 EACH | $75.00 | $27.20 | $28.75 | $15.00 | $25.00 | $30.00 | $10.00 | $7.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 20 EACH | $42.50 | $27.20 | $28.75 | $15.00 | $20.99 | $30.00 | $10.00 | $18.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.42 MILE | $3,571 | $2,452 | $2,586 | $2,250 | $2,250 | $2,400 | $2,381 | $2,250 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 22 FT | $22.73 | $13.60 | $14.39 | $12.50 | $12.50 | $14.00 | $10.00 | $12.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 8,110 CY | $60 | $487k | 30% |
| 203E20000 EMBANKMENT | 50,514 CY | $5 | $253k | 16% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN (NO. 8 AGGREGATE) | 2,217 CY | $101.6 | $225k | 14% |
| 203E10000 EXCAVATION | 48,010 CY | $4 | $192k | 12% |
| 622E41000 PORTABLE BARRIER, 32" | 960 FT | $80 | $77k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 220 CY | $265 | $58k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 199 CY | $220.8 | $44k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $31,388 | $31k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,000 | $27k | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $25,000 | $25k | 2% |