ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Brumbaugh Construction INC | R3Eagle Bridge CO | R4Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 247 CY | $750 | $900 | $750 | $710 | 19% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $162,000 | $130,000 | $120,000 | $120,000 | 17% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $12.00 | $12.50 | $12.53 | $12.50 | 11% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 55,173 LB | $1.06 | $1.00 |
| Item | Quantity | R1Complete General Construction Company | R2Brumbaugh Construction INC | R3Eagle Bridge CO | R4Double Z Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $1,200 | $6,000 | $8,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2 FT | $100 | $25.00 | $45.00 | $40.00 |
| 202E38000 GUARDRAIL REMOVED | 427 FT | $2.00 | $2.10 | $1.80 | $2.00 |
| 202E75000 FENCE REMOVED | 105 FT | $2.20 | $2.30 | $2.00 | $1.00 |
| 203E10000 EXCAVATION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.05 |
| $1.30 |
| 6% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 80 CY | $575 | $580 | $600 | $650 | 5% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $45,000 | $50,000 | $45,000 | $80,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $28,000 | $40,000 | $40,000 | 4% |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 474 FT | $74.50 | $67.00 | $76.00 | $70.00 | 4% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 132 SY | $250 | $270 | $235 | $255 | 3% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 29,609 LB | $1.06 | $1.00 | $1.05 | $1.30 | 3% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 24 CY | $1,300 | $800 | $1,050 | $1,500 | 3% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 9,100 SF | $3.00 | $3.75 | $3.76 | $3.10 | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,100 SF | $2.80 | $3.75 | $3.76 | $2.90 | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,100 SF | $2.80 | $3.50 | $3.76 | $2.90 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $60,000 | $30,000 | $60,000 | 2% |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 11 CY | $1,800 | $1,050 | $2,000 | $2,500 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 982 SY | $20.00 | $24.50 | $20.00 | $20.00 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 1,080 FT | $17.00 | $18.00 | $16.50 | $15.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,000 | $500 | $1,500 | $1,500 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 76 CY | $216 | $260 | $217 | $216 | 2% |
| 333 CY |
| $17.00 |
| $20.00 |
| $15.00 |
| $26.00 |
| 203E20000 EMBANKMENT | 313 CY | $22.00 | $18.00 | $15.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 1,116 SY | $2.00 | $1.30 | $4.00 | $6.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 237.5 FT | $20.40 | $21.50 | $16.54 | $20.40 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 12.5 FT | $23.20 | $24.45 | $17.04 | $23.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,325 | $2,450 | $2,305 | $2,325 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $985 | $1,035 | $952 | $985 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,180 | $2,300 | $2,005 | $2,180 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $465 | $490 | $451 | $465 |
| 607E15000 FENCE, TYPE 47 | 130 FT | $21.60 | $22.75 | $30.07 | $21.60 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $185 | $195 | $120 | $185 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 4 CY | $150 | $150 | $100 | $150 |
| 659E00300 TOPSOIL | 107 CY | $35.00 | $20.00 | $5.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 961 SY | $3.48 | $2.00 | $3.00 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $610 | $550 | $1,250 | $450 |
| 659E31000 LIME | 0.2 ACRE | $75.00 | $50.00 | $10.00 | $10.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $5.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $4,300 | $3,500 | $2,000 | $3,000 |
| 605E31100 AGGREGATE DRAINS | 63 FT | $17.00 | $17.00 | $13.00 | $20.00 |
| 611E05200 12" CONDUIT, TYPE F | 53 FT | $65.00 | $81.00 | $80.00 | $50.00 |
| 304E20000 AGGREGATE BASE | 171 CY | $90.00 | $50.00 | $75.00 | $85.00 |
| 407E10000 TACK COAT | 53 GAL | $6.00 | $10.00 | $6.01 | $6.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 8 CY | $150 | $50.00 | $75.00 | $120 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 38 CY | $306 | $270 | $307 | $306 |
| 609E24510 CURB, TYPE 4-C | 37.5 FT | $60.00 | $35.00 | $45.00 | $40.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 8 EACH | $12.00 | $7.65 | $10.02 | $7.25 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 11 EACH | $13.00 | $8.50 | $8.02 | $8.00 |
| 646E10000 EDGE LINE, 4" | 0.14 MILE | $21,210 | $22,325 | $21,259 | $21,210 |
| 646E10200 CENTER LINE | 0.07 MILE | $22,050 | $23,210 | $22,101 | $22,050 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $85.00 | $70.00 | $90.00 | $65.00 |
| 614E12337 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), AS P | 4 EACH | $1,900 | $2,000 | $1,904 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,420 | $5,850 | $7,500 | $7,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 28 EACH | $11.00 | $11.60 | $6.00 | $14.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 28 EACH | $13.00 | $13.70 | $12.00 | $19.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $950 | $900 | $825 |
| 616E10000 WATER | 2 MGAL | $70.00 | $5.00 | $1.00 | $60.00 |
| 202E22900 APPROACH SLAB REMOVED | 160 SY | $40.00 | $38.00 | $40.00 | $36.00 |
| 202E23500 WEARING COURSE REMOVED | 160 SY | $11.00 | $6.00 | $5.00 | $12.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $6,000 | $2,000 | $25,000 | $15,000 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 342 EACH | $12.00 | $14.00 | $13.00 | $18.00 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 10 CY | $745 | $760 | $750 | $650 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 3 FT | $300 | $500 | $150 | $350 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 284 SY | $25.00 | $20.00 | $25.00 | $25.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,920 EACH | $3.50 | $3.25 | $3.30 | $3.50 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $50.00 | $85.00 | $85.20 | $51.28 |
| 514E10000 FINAL INSPECTION REPAIR | 10 EACH | $150 | $150 | $150 | $155 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $10.00 | $6.00 | $17.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 92 SF | $12.00 | $12.00 | $12.00 | $16.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 82 FT | $45.00 | $30.00 | $30.00 | $30.00 |
| 516E31010 2" DEEP JOINT SEALER | 64 FT | $25.00 | $16.00 | $12.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,006 | $1,060 | $1,250 | $1,000 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,179 | $975 | $1,250 | $1,050 |
| 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 4 EACH | $942 | $930 | $1,250 | $1,300 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 45 CY | $110 | $85.00 | $100 | $110 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 92 FT | $7.00 | $10.00 | $10.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 41 FT | $18.00 | $10.00 | $25.00 | $16.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 4 SF | $225 | $500 | $300 | $200 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 100 SY | $38.00 | $28.00 | $30.00 | $45.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $9,000 | $15,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $3,477 | $6,500 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 247 CY | $750 | $185k | 16% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $162,000 | $162k | 14% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 9,100 SF | $12 | $109k | 9% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 55,173 LB | $1.06 | $58k | 5% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 80 CY | $575 | $46k | 4% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $45,000 | $45k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 474 FT | $74.5 | $35k | 3% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 132 SY | $250 | $33k | 3% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 29,609 LB | $1.06 | $31k | 3% |