HIG-SR 41-00.38
HIG County · est $1.1M
Bid dateThursday, January 14—
HIG County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2D G M INC | R3Heavy Highway Construction Company | R4LLC Double Z Construction Company | R5Complete General Construction Company | R6George J Igel & CO INC | R7Armstrong Steel Erectors INC | R8Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 54,710 LB | $2.31 | $2.10 | $1.83 | $2.15 | $1.85 | $2.25 | $1.71 | $2.13 | 17% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 91 CY | $963 | $1,150 | $1,000 | $1,200 | $950 |
| Item | Quantity | R1Sunesis Construction CO | R2D G M INC | R3Heavy Highway Construction Company | R4LLC Double Z Construction Company | R5Complete General Construction Company | R6George J Igel & CO INC | R7Armstrong Steel Erectors INC | R8Shelly & Sands INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,340 | $11,000 | $18,500 | $4,000 | $9,000 | $5,000 | $2,430 | $1,400 |
| 202E23000 PAVEMENT REMOVED | 613 SY | $16.00 | $8.00 | $14.00 | $16.00 | $10.00 | $9.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,300 |
| $1,356 |
| $1,620 |
| 12% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 212 SY | $261 | $230 | $240 | $275 | $185 | $275 | $286 | $256 | 8% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 74 CY | $664 | $450 | $475 | $500 | $610 | $610 | $506 | $928 | 7% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 96 FT | $441 | $440 | $275 | $510 | $410 | $320 | $424 | $413 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 213 CY | $190 | $200 | $240 | $203 | $240 | $230 | $203 | $203 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $39,380 | $40,000 | $20,000 | $44,000 | $15,000 | $45,000 | $69,630 | $42,000 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 31,950 LB | $1.23 | $1.05 | $1.40 | $1.20 | $1.05 | $1.10 | $1.18 | $1.09 | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $28,778 | $60,000 | $65,000 | $55,000 | $70,000 | $80,000 | $75,338 | $56,600 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 361 SY | $77.70 | $75.00 | $65.00 | $75.00 | $82.00 | $65.00 | $76.00 | $58.00 | 4% |
| 524E94802 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK | 63 FT | $437 | $330 | $160 | $370 | $450 | $220 | $457 | $489 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $26,650 | $20,000 | $30,000 | $40,000 | $40,000 | $40,000 | $40,000 | $40,000 | 4% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 270 CY | $95.46 | $65.00 | $100 | $65.00 | $65.00 | $51.00 | $78.71 | $48.00 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 120 CY | $200 | $220 | $320 | $240 | $320 | $200 | $240 | $240 | 3% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 46 CY | $502 | $450 | $475 | $650 | $675 | $710 | $499 | $680 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 110 FT | $140 | $150 | $155 | $160 | $160 | $160 | $152 | $152 | 2% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 130 CY | $115 | $110 | $100 | $135 | $175 | $200 | $123 | $126 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 760 FT | $18.02 | $13.00 | $18.00 | $17.00 | $20.00 | $19.00 | $17.00 | $15.00 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $13,037 | $14,000 | $10,001 | $10,000 | $35,000 | $30,000 | $52,811 | $32,000 | 2% |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,029 | $1,150 | $1,000 | $1,100 | $1,200 | $1,300 | $914 | $1,000 | 2% |
| $5.54 |
| $21.00 |
| 202E38000 GUARDRAIL REMOVED | 625 FT | $1.60 | $1.00 | $2.00 | $2.80 | $1.60 | $3.00 | $2.80 | $2.80 |
| 203E10000 EXCAVATION | 363 CY | $23.24 | $25.00 | $19.00 | $25.00 | $17.50 | $20.00 | $11.36 | $24.00 |
| 203E20000 EMBANKMENT | 175 CY | $7.31 | $20.00 | $20.00 | $15.00 | $20.00 | $15.00 | $20.68 | $14.00 |
| 204E10000 SUBGRADE COMPACTION | 1,442 SY | $1.81 | $4.00 | $2.00 | $4.00 | $5.00 | $3.00 | $5.18 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 125 FT | $15.90 | $18.00 | $18.60 | $18.00 | $15.90 | $18.00 | $18.00 | $18.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350 OR MASH 201 | 4 EACH | $2,450 | $2,500 | $2,350 | $2,250 | $2,450 | $2,250 | $2,250 | $2,250 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,175 | $2,200 | $2,150 | $2,000 | $2,175 | $2,000 | $2,000 | $2,000 |
| 659E10000 SEEDING AND MULCHING | 1,122 SY | $2.69 | $3.00 | $2.50 | $6.00 | $2.70 | $4.00 | $2.06 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 56 SY | $1.00 | $0.05 | $4.00 | $1.00 | $2.70 | $1.00 | $0.68 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $500 | $650 | $590 | $500 | $610 | $500 | $675 | $500 |
| 659E31000 LIME | 0.23 ACRE | $200 | $80.00 | $75.00 | $200 | $80.00 | $200 | $155 | $200 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $188 | $150 | $500 | $250 | $200 | $90.00 | $100 | $185 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 266 FT | $11.23 | $12.00 | $5.00 | $13.00 | $15.00 | $9.00 | $12.00 | $12.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 966 FT | $6.32 | $12.00 | $8.00 | $9.00 | $15.00 | $6.00 | $12.00 | $12.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 141 FT | $8.64 | $15.00 | $6.00 | $13.00 | $20.00 | $13.00 | $30.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $209 | $300 | $100 | $400 | $350 | $260 | $250 | $235 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" ) | 817 SY | $3.00 | $3.50 | $8.75 | $8.75 | $6.85 | $9.00 | $8.75 | $8.75 |
| 304E20000 AGGREGATE BASE | 215 CY | $57.29 | $65.00 | $65.00 | $80.00 | $60.00 | $50.00 | $64.05 | $65.00 |
| 407E10000 TACK COAT | 266 GAL | $4.00 | $4.00 | $4.00 | $2.00 | $4.00 | $4.00 | $2.00 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 7 CY | $123 | $125 | $100 | $140 | $95.00 | $70.00 | $143 | $77.00 |
| 621E00100 RPM | 26 EACH | $90.86 | $140 | $140 | $130 | $140 | $130 | $90.86 | $148 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 26 EACH | $1.00 | $1.00 | $25.00 | $10.00 | $30.00 | $6.00 | $10.00 | $9.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 8 EACH | $8.00 | $10.00 | $10.00 | $10.00 | $8.00 | $10.00 | $10.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.38 MILE | $6,344 | $3,500 | $3,175 | $3,175 | $3,175 | $3,175 | $5,413 | $3,175 |
| 642E00300 CENTER LINE, TYPE 1 | 0.38 MILE | $6,529 | $3,600 | $3,395 | $3,395 | $3,395 | $3,395 | $490 | $3,395 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $65.00 | $40.00 | $75.00 | $65.00 | $80.00 | $73.50 | $90.00 | $72.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $1,900 | $1,900 | $2,000 | $2,180 | $2,200 | $1,900 | $2,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 22 EACH | $11.00 | $40.00 | $20.00 | $13.00 | $40.00 | $14.00 | $11.00 | $8.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 4 EACH | $12.00 | $50.00 | $30.00 | $13.00 | $50.00 | $11.00 | $12.00 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 31 EACH | $15.00 | $40.00 | $20.00 | $16.00 | $40.00 | $23.00 | $15.00 | $16.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.2 MILE | $6,750 | $6,000 | $5,650 | $5,650 | $5,650 | $5,650 | $6,750 | $5,650 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.6 MILE | $2,186 | $2,250 | $2,050 | $2,050 | $2,050 | $2,050 | $2,186 | $2,050 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.04 MILE | $10,829 | $17,000 | $16,752 | $16,752 | $16,752 | $16,752 | $10,829 | $16,755 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 20 FT | $17.44 | $17.00 | $14.00 | $14.00 | $14.00 | $14.00 | $17.44 | $14.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $1,796 | $2,000 | $25,000 | $9,500 | $15,000 | $15,000 | $8,413 | $18,000 |
| 616E10000 WATER | 2 MGAL | $17.84 | $1.00 | $1.00 | $50.00 | $175 | $50.00 | $150 | $32.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 150 FT | $26.66 | $19.00 | $22.00 | $30.00 | $25.00 | $30.00 | $21.50 | $48.00 |
| 202E22900 APPROACH SLAB REMOVED | 123 SY | $24.46 | $20.00 | $32.00 | $45.00 | $50.00 | $35.00 | $62.35 | $28.00 |
| 202E23500 WEARING COURSE REMOVED | 432 SY | $7.42 | $6.00 | $15.00 | $5.00 | $15.00 | $1.00 | $6.55 | $17.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 190 CY | $39.17 | $15.00 | $50.00 | $80.00 | $90.00 | $45.00 | $46.54 | $40.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,611 | $2,000 | $1,500 | $3,000 | $8,000 | $3,000 | $1,648 | $2,880 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 85 SY | $30.00 | $35.00 | $18.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 512E33001 TYPE 2 WATERPROOFING, AS PER PLAN | 136 SY | $23.50 | $20.00 | $15.00 | $25.00 | $23.50 | $40.00 | $23.50 | $10.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 990 EACH | $8.46 | $6.75 | $6.50 | $6.50 | $3.25 | $6.00 | $5.00 | $4.25 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 3 SF | $4.91 | $25.00 | $15.00 | $20.00 | $30.00 | $22.00 | $6.00 | $16.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 42 SF | $5.26 | $25.00 | $10.00 | $25.00 | $8.50 | $11.00 | $8.00 | $7.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 128 FT | $42.00 | $37.50 | $28.00 | $25.00 | $42.00 | $32.00 | $30.00 | $29.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 42 CY | $95.54 | $80.00 | $100 | $120 | $150 | $110 | $94.64 | $79.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 140 FT | $12.50 | $15.00 | $11.00 | $20.00 | $12.50 | $13.00 | $15.00 | $12.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 131 FT | $3.68 | $15.00 | $10.00 | $9.00 | $9.00 | $15.00 | $8.50 | $7.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 63 FT | $6.98 | $15.00 | $10.00 | $14.00 | $12.00 | $21.00 | $12.50 | $8.00 |
| 524E95100 DRILLED SHAFTS, MISC.:THERMAL INTEGRITY PROFILER, | 2 EACH | $4,234 | $2,000 | $5,100 | $3,200 | $3,500 | $5,000 | $3,200 | $7,700 |
| 526E90010 TYPE A INSTALLATION | 88 FT | $127 | $160 | $140 | $165 | $180 | $160 | $146 | $183 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,736 | $29,000 | $11,690 | $7,000 | $11,000 | $5,200 | $9,162 | $6,100 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $943 | $700 | $2,000 | $1,000 | $2,000 | $1,500 | $1,750 | $2,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,450 | $6,000 | $8,000 | $10,000 | $3,000 | $10,000 | $5,000 | $14,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 54,710 LB | $2.31 | $126k | 14% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 91 CY | $963.22 | $88k | 9% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 212 SY | $260.83 | $55k | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 74 CY | $664.11 | $49k | 5% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 96 FT | $440.97 | $42k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 213 CY | $190 | $40k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $39,380 | $39k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 31,950 LB | $1.23 | $39k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $28,778 | $29k | 3% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 361 SY | $77.7 | $28k | 3% |