ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Rack & Ballauer Excavating CO INC | R3Double Jay Construction INC | R4Eclipse CO LLC | R5Brumbaugh Construction INC | R6Barrett Paving Materials INC | R7John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 736 CY | $140 | $150 | $155 | $142 | $162 | $138 | $203 | 21% |
| 203E10000 EXCAVATION | 4,157 CY | $15.00 | $27.00 | $16.50 | $20.50 | $15.00 | $24.00 | $15.19 | 13% |
| Item | Quantity | R1Eagle Bridge CO | R2Rack & Ballauer Excavating CO INC | R3Double Jay Construction INC | R4Eclipse CO LLC | R5Brumbaugh Construction INC | R6Barrett Paving Materials INC | R7John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 250 FT | $1.50 | $5.50 | $5.15 | $5.50 | $5.50 | $2.20 | $2.20 |
| 202E75000 FENCE REMOVED | 1,142 FT | $3.50 | $4.15 | $3.60 | $4.00 | $3.75 | $2.50 | $2.50 |
| 204E13000 EXCAVATION OF SUBGRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 448 (183 CY |
| $172 |
| $185 |
| $191 |
| $174 |
| $169 |
| $145 |
| $304 |
| 6% |
| 304E20000 AGGREGATE BASE | 519 CY | $60.00 | $57.00 | $54.20 | $48.50 | $50.00 | $72.00 | $75.83 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 131 CY | $214 | $240 | $238 | $216 | $211 | $200 | $312 | 6% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 3,181 SY | $8.50 | $7.65 | $10.55 | $5.20 | $7.50 | $7.40 | $7.47 | 6% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $22,500 | $26,350 | $17,950 | $17,000 | $25,000 | $25,000 | $23,179 | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,183 FT | $10.00 | $11.00 | $11.55 | $9.50 | $14.00 | $12.00 | $12.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $6,605 | $53,604 | $23,000 | $14,500 | $16,142 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE (0" T | 1,005 SY | $16.50 | $6.65 | $18.35 | $8.00 | $9.50 | $12.00 | $18.00 | 3% |
| 602E20000 CONCRETE MASONRY | 9.9 CY | $1,500 | $1,800 | $692 | $1,643 | $1,400 | $2,850 | $2,227 | 3% |
| 206E10500 CEMENT | 83 TON | $167 | $169 | $194 | $171 | $180 | $170 | $223 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $12,500 | $13,000 | $12,175 | $11,519 | $13,000 | $10,970 | $10,970 | 3% |
| 202E23000 PAVEMENT REMOVED | 2,294 SY | $5.00 | $5.15 | $6.05 | $7.00 | $11.00 | $7.75 | $7.48 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $500 | $653 | $7,652 | $5,000 | $4,000 | $1,572 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $12,000 | $9,158 | $10,500 | $8,000 | $12,500 | $8,070 | 2% |
| 659E10000 SEEDING AND MULCHING | 7,925 SY | $1.25 | $1.05 | $1.20 | $1.00 | $1.00 | $1.05 | $1.05 | 2% |
| 203E20000 EMBANKMENT | 682 CY | $14.00 | $12.50 | $18.80 | $33.50 | $15.00 | $20.00 | $17.82 | 2% |
| 659E00300 TOPSOIL | 900 CY | $10.00 | $43.00 | $51.84 | $45.00 | $38.00 | $43.00 | $43.00 | 2% |
| 36 CY |
| $35.00 |
| $31.00 |
| $55.60 |
| $70.50 |
| $30.00 |
| $86.00 |
| $105 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 36 CY | $55.00 | $52.00 | $78.65 | $57.00 | $75.00 | $92.00 | $211 |
| 204E45000 PROOF ROLLING | 2 HOUR | $175 | $180 | $188 | $222 | $300 | $100 | $208 |
| 204E50000 GEOTEXTILE FABRIC | 92 SY | $1.50 | $1.80 | $6.80 | $2.50 | $6.50 | $5.75 | $5.70 |
| 206E11000 CURING COAT | 3,181 SY | $1.10 | $1.20 | $1.00 | $1.50 | $1.50 | $1.20 | $2.00 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $8,100 | $4,000 | $6,105 | $9,044 | $9,500 | $8,615 | $7,650 |
| 606E15050 GUARDRAIL, TYPE MGS | 325 FT | $15.80 | $15.80 | $17.55 | $16.50 | $17.00 | $18.60 | $18.60 |
| 606E20050 ROUNDED END SECTION | 1 EACH | $25.00 | $25.00 | $28.00 | $26.50 | $27.00 | $66.00 | $66.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 3 EACH | $2,450 | $2,450 | $2,720 | $2,573 | $2,600 | $2,380 | $2,380 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $925 | $925 | $1,027 | $972 | $1,000 | $985 | $985 |
| 623E40500 REFERENCE MONUMENT | 4 EACH | $700 | $500 | $514 | $558 | $500 | $275 | $916 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $6,500 | $5,000 | $6,016 | $6,955 | $12,000 | $6,500 | $27,100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $125 | $138 | $132 | $100 | $125 | $125 |
| 659E14000 REPAIR SEEDING AND MULCHING | 400 SY | $1.25 | $1.05 | $1.10 | $1.00 | $0.75 | $1.05 | $1.05 |
| 659E20000 COMMERCIAL FERTILIZER | 1.1 TON | $1,000 | $800 | $888 | $840 | $600 | $800 | $800 |
| 659E31000 LIME | 1.65 ACRE | $100 | $75.00 | $84.00 | $79.00 | $50.00 | $75.00 | $75.00 |
| 659E35000 WATER | 43 MGAL | $5.00 | $1.00 | $11.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 500 SY | $2.50 | $2.35 | $2.60 | $2.50 | $2.50 | $2.35 | $2.35 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,250 | $1,776 | $2,205 | $2,000 | $1,250 | $1,245 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,500 | $3,400 | $13,320 | $4,725 | $11,473 | $4,150 | $2,040 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,500 | $9,100 | $13,320 | $9,505 | $9,500 | $9,200 | $9,052 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 127 SY | $8.00 | $7.55 | $8.40 | $8.00 | $7.00 | $7.55 | $7.55 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 26 CY | $90.00 | $105 | $147 | $85.50 | $120 | $140 | $293 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 372 FT | $10.00 | $13.00 | $11.90 | $10.00 | $14.00 | $12.00 | $29.20 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 70 FT | $20.00 | $30.00 | $23.25 | $31.50 | $28.00 | $25.00 | $45.95 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,000 | $770 | $895 | $533 | $1,000 | $400 | $2,190 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $250 | $310 | $415 | $274 | $400 | $230 | $360 |
| 503E21100 UNCLASSIFIED EXCAVATION | 14 CY | $150 | $80.00 | $47.50 | $55.50 | $75.00 | $150 | $269 |
| 407E20000 NON-TRACKING TACK COAT | 678 GAL | $3.25 | $1.00 | $3.60 | $3.50 | $7.00 | $3.25 | $10.00 |
| 621E00100 RPM | 12 EACH | $195 | $195 | $249 | $205 | $210 | $195 | $195 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $10.00 | $17.00 | $46.90 | $11.50 | $40.00 | $12.00 | $22.60 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 3 EACH | $7.50 | $7.50 | $8.50 | $8.00 | $8.00 | $8.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 218 FT | $10.50 | $10.50 | $11.65 | $11.00 | $11.00 | $10.50 | $12.50 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $32.00 | $32.00 | $35.65 | $33.50 | $34.00 | $32.00 | $45.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 24 EACH | $35.00 | $35.00 | $39.00 | $37.00 | $37.00 | $35.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 16 EACH | $15.00 | $15.00 | $16.70 | $16.00 | $16.00 | $15.00 | $15.00 |
| 644E00104 EDGE LINE, 6" | 0.5 MILE | $5,407 | $5,500 | $6,000 | $5,678 | $5,750 | $5,418 | $5,407 |
| 644E00300 CENTER LINE | 0.29 MILE | $10,737 | $11,000 | $12,000 | $11,274 | $11,341 | $10,774 | $10,737 |
| 644E00500 STOP LINE | 30 FT | $12.35 | $12.50 | $13.70 | $13.00 | $13.00 | $12.35 | $12.35 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $65.00 | $70.00 | $55.00 | $68.50 | $75.00 | $75.00 | $102 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $5,000 | $6,170 | $10,500 | $7,000 | $2,500 | $5,601 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $3,500 | $18,759 | $10,671 | $25,000 | $23,180 | $26,848 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 736 CY | $140 | $103k | 17% |
| 203E10000 EXCAVATION | 4,157 CY | $15 | $62k | 10% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (183 CY | $172 | $31k | 5% |
| 304E20000 AGGREGATE BASE | 519 CY | $60 | $31k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 131 CY | $214 | $28k | 5% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 3,181 SY | $8.5 | $27k | 5% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1 | $25k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $22,500 | $23k | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,183 FT | $10 | $22k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |