DAR-SR 49-23.78
DAR County · est $0.5M
Bid dateThursday, January 28—
DAR County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Bcc Ohio INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Complete General Construction Company | R6Miller Bros Const INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E12040 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $11,000 | $10,696 | $12,500 | $13,570 | $13,500 | $14,600 | 30% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 42 CY | $1,200 | $910 | $1,350 | $865 | $800 | $1,200 | 14% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $44,840 | $42,500 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Bcc Ohio INC | R3Eagle Bridge CO | R4Sunesis Construction CO | R5Complete General Construction Company | R6Miller Bros Const INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $3.90 | $1,000 | $2,118 | $9,000 | $2,500 |
| 202E23000 PAVEMENT REMOVED | 343 SY | $16.00 | $11.02 | $10.00 | $10.09 | $10.00 | $11.00 |
| 202E38000 GUARDRAIL REMOVED | 416 FT | $3.00 | $5.78 | $2.50 | $2.83 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $34,353 |
| $35,000 |
| $70,000 |
| 10% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 100 SY | $225 | $268 | $225 | $218 | $260 | $277 | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 123 FT | $155 | $161 | $149 | $147 | $145 | $129 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 69 CY | $180 | $268 | $180 | $181 | $180 | $250 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,167 | $8,308 | $10,000 | $27,498 | $20,000 | $20,000 | 3% |
| 203E20000 EMBANKMENT | 669 CY | $15.00 | $9.75 | $17.00 | $10.18 | $16.00 | $18.00 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 4 EACH | $2,500 | $2,389 | $2,450 | $2,301 | $2,280 | $2,280 | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,200 | $2,048 | $2,175 | $2,018 | $2,050 | $2,050 | 2% |
| 203E10000 EXCAVATION | 576 CY | $15.00 | $9.75 | $14.00 | $10.64 | $15.00 | $18.00 | 2% |
| 511E50211 CLASS QC1 CONCRETE, SUBSTRUCTURE, AS PER PLAN | 11 CY | $750 | $1,295 | $1,350 | $1,063 | $1,900 | $1,550 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 8,241 LB | $1.00 | $1.52 | $1.10 | $1.27 | $1.25 | $1.50 | 2% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 105 CY | $75.00 | $132 | $70.00 | $90.29 | $95.00 | $115 | 2% |
| 526E90010 TYPE A INSTALLATION | 60 FT | $130 | $156 | $135 | $149 | $275 | $175 | 2% |
| 659E10000 SEEDING AND MULCHING | 2,469 SY | $3.00 | $1.05 | $2.00 | $1.92 | $1.80 | $1.80 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,000 | $5,040 | $10,000 | $8,745 | $13,000 | $4,300 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 29 CY | $235 | $452 | $222 | $224 | $222 | $350 | 2% |
| 202E23500 WEARING COURSE REMOVED | 290 SY | $20.00 | $10.68 | $10.00 | $8.40 | $25.00 | $11.00 | 2% |
| $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $350 | $184 | $200 | $384 | $265 | $265 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 100 FT | $30.00 | $28.20 | $15.00 | $37.67 | $15.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 483 SY | $1.00 | $1.95 | $5.00 | $3.77 | $3.00 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $18.00 | $22.58 | $15.65 | $18.17 | $17.40 | $17.40 |
| 623E40500 REFERENCE MONUMENT | 18 EACH | $200 | $305 | $75.00 | $219 | $500 | $100 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 20 EACH | $250 | $119 | $30.00 | $44.44 | $500 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $78.75 | $150 | $202 | $25.00 | $25.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.4 TON | $650 | $788 | $1,250 | $843 | $500 | $500 |
| 659E31000 LIME | 0.6 ACRE | $5.00 | $105 | $5.00 | $112 | $10.00 | $10.00 |
| 659E35000 WATER | 14 MGAL | $5.00 | $2.55 | $10.00 | $1.51 | $10.00 | $10.00 |
| 670E00700 DITCH EROSION PROTECTION | 106 SY | $7.00 | $2.63 | $3.00 | $2.81 | $3.00 | $3.00 |
| 605E31100 AGGREGATE DRAINS | 36 FT | $14.00 | $20.90 | $17.00 | $10.27 | $25.00 | $20.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $15.00 | $9.75 | $3.00 | $28.19 | $10.00 | $8.00 |
| 611E02500 8" CONDUIT, TYPE E | 50 FT | $10.00 | $9.75 | $3.00 | $22.19 | $10.00 | $5.00 |
| 611E02600 8" CONDUIT, TYPE F | 50 FT | $10.00 | $9.75 | $3.00 | $22.19 | $10.00 | $5.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 50 FT | $2.00 | $7.80 | $2.00 | $1.51 | $20.00 | $4.00 |
| 304E20000 AGGREGATE BASE | 79 CY | $55.00 | $91.94 | $80.00 | $92.57 | $90.00 | $70.00 |
| 407E20000 NON-TRACKING TACK COAT | 21 GAL | $5.00 | $21.00 | $4.50 | $4.54 | $4.50 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $100 | $15.60 | $10.00 | $1.01 | $50.00 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $10.00 | $15.75 | $8.00 | $10.09 | $7.00 | $7.00 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $20,000 | $18,428 | $18,720 | $30,444 | $17,555 | $17,555 |
| 646E10200 CENTER LINE | 0.06 MILE | $36,000 | $11,858 | $34,850 | $19,585 | $11,293 | $11,293 |
| 616E10000 WATER | 10 MGAL | $5.00 | $2.55 | $5.00 | $6.93 | $200 | $75.00 |
| 202E22900 APPROACH SLAB REMOVED | 100 SY | $40.00 | $37.28 | $40.00 | $49.58 | $50.00 | $40.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 124 FT | $10.00 | $21.05 | $20.00 | $45.79 | $50.00 | $30.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,500 | $2,933 | $4,000 | $1,322 | $8,000 | $10,000 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 140 EACH | $20.00 | $18.59 | $14.00 | $15.07 | $15.00 | $24.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 66 SY | $32.00 | $24.74 | $35.00 | $25.23 | $45.00 | $34.00 |
| 512E33000 TYPE 2 WATERPROOFING | 8 SY | $100 | $29.25 | $40.00 | $16.57 | $45.00 | $65.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 15 SF | $5.00 | $15.88 | $11.00 | $4.98 | $35.00 | $10.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 89 FT | $30.00 | $42.02 | $28.00 | $38.43 | $30.00 | $30.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 60 FT | $20.00 | $14.89 | $14.00 | $6.83 | $22.50 | $9.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 40 EACH | $100 | $127 | $125 | $85.14 | $125 | $80.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 23 CY | $70.00 | $63.28 | $80.00 | $93.72 | $200 | $115 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 134 FT | $9.00 | $11.68 | $12.00 | $9.81 | $13.50 | $15.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $5,903 | $5,000 | $0.01 | $5,000 | $6,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,500 | $1,502 | $1,000 | $5,650 | $5,000 | $5,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $800 | $1,111 | $750 | $1,243 | $1,700 | $1,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $1,920 | $5,500 | $6,611 | $4,000 | $3,150 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12040 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $11,000 | $110k | 25% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 42 CY | $1,200 | $50k | 11% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $35k | 8% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 100 SY | $225 | $23k | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 123 FT | $155 | $19k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 69 CY | $180 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,167 | $10k | 2% |
| 203E20000 EMBANKMENT | 669 CY | $15 | $10k | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 4 EACH | $2,500 | $10k | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 2% |