SCI-SR 348-09.42
SCI County · est $0.5M
Bid dateThursday, January 28—
SCI County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2D G M INC | R3Axis Civil Construction LLC | R4Heavy Highway Construction Company | R5Distel Construction INC | R6Complete General Construction Company | R7Eclipse CO LLC | R8Sunesis Construction CO | R9Skeens Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN | 100 FT | $1,832 | $2,025 | $1,980 | $1,600 | $1,683 | $1,500 | $1,946 | $2,278 | $2,100 | 44% |
| 624E10000 MOBILIZATION | 1 LS | $30,050 |
| Item | Quantity | R1Allard Excavation LLC | R2D G M INC | R3Axis Civil Construction LLC | R4Heavy Highway Construction Company | R5Distel Construction INC | R6Complete General Construction Company | R7Eclipse CO LLC | R8Sunesis Construction CO | R9Skeens Excavating INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,900 | $11,000 | $3,500 | $5,000 | $1,000 | $5,000 | $9,000 | $1,400 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 100 SY | $2.90 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $11,000 |
| $20,000 |
| $20,000 |
| $7,422 |
| $20,000 |
| $25,000 |
| $31,086 |
| $35,000 |
| 7% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 56 SY | $532 | $350 | $395 | $224 | $475 | $710 | $628 | $527 | $500 | 7% |
| 203E20000 EMBANKMENT | 1,725 CY | $15.00 | $15.00 | $23.00 | $19.00 | $22.00 | $11.00 | $15.50 | $24.68 | $10.00 | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 75 CY | $299 | $425 | $390 | $450 | $565 | $380 | $428 | $373 | $750 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $305 | $300 | $120 | $220 | $398 | $356 | $426 | $305 | $350 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $245 | $255 | $250 | $360 | $396 | $261 | $378 | $245 | $340 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,783 LB | $2.34 | $1.50 | $1.70 | $2.50 | $1.25 | $2.25 | $2.50 | $2.52 | $2.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $325 | $335 | $320 | $405 | $398 | $356 | $426 | $325 | $420 | 3% |
| 512E33000 TYPE 2 WATERPROOFING | 539 SY | $23.50 | $12.00 | $16.00 | $17.00 | $28.00 | $23.50 | $16.50 | $23.50 | $15.00 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $200 | $120 | $120 | $150 | $398 | $160 | $183 | $301 | $220 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,800 | $4,000 | $5,500 | $3,000 | $5,605 | $4,000 | $16,500 | $5,650 | $6,000 | 2% |
| 601E32011 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 100 CY | $58.50 | $60.00 | $75.00 | $80.00 | $100 | $110 | $67.50 | $79.00 | $100 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $6,000 | $8,250 | $8,000 | $6,500 | $8,200 | $9,788 | $9,050 | $6,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $15,000 | $3,500 | $8,000 | $4,190 | $3,000 | $9,500 | $1,503 | $8,000 | 1% |
| 253E01000 PAVEMENT REPAIR | 75 SY | $60.00 | $80.00 | $30.00 | $60.00 | $213 | $60.00 | $79.00 | $60.00 | $100 | 1% |
| 202E11202 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $4,200 | $22,500 | $12,000 | $30,000 | $27,200 | $25,000 | $15,718 | $25,082 | $90,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,100 | $4,000 | $4,500 | $7,847 | $9,219 | $6,500 | $13,500 | $4,029 | $7,000 | 1% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $3,700 | $2,500 | $10,000 | $8,000 | $3,000 | $60,000 | $9,500 | $12,593 | $15,000 | 1% |
| 203E10000 EXCAVATION | 239 CY | $14.15 | $20.00 | $20.00 | $20.00 | $17.00 | $10.50 | $8.50 | $3.24 | $15.00 | 1% |
| $10.00 |
| $11.00 |
| $15.00 |
| $10.00 |
| $40.00 |
| $16.00 |
| $21.48 |
| $20.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 70 FT | $4.15 | $15.00 | $29.00 | $20.00 | $20.50 | $35.00 | $19.00 | $4.25 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 87.5 FT | $3.50 | $1.00 | $4.00 | $2.00 | $10.00 | $4.80 | $8.50 | $1.75 | $50.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $37.67 | $250 | $400 | $450 | $300 | $265 | $439 | $350 | $100 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $30.50 | $200 | $400 | $775 | $250 | $220 | $365 | $350 | $100 |
| 202E75000 FENCE REMOVED | 649 FT | $0.53 | $3.00 | $2.00 | $2.00 | $5.00 | $3.50 | $4.50 | $3.00 | $2.00 |
| 204E10000 SUBGRADE COMPACTION | 461 SY | $5.93 | $3.00 | $2.00 | $2.50 | $2.00 | $9.00 | $1.50 | $3.19 | $2.00 |
| 623E40500 REFERENCE MONUMENT | 4 EACH | $448 | $300 | $225 | $1,500 | $266 | $950 | $291 | $323 | $250 |
| 659E10000 SEEDING AND MULCHING | 1,971 SY | $1.42 | $1.50 | $1.88 | $1.70 | $3.00 | $1.88 | $2.00 | $3.64 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 99 SY | $0.05 | $0.05 | $1.88 | $0.75 | $3.00 | $1.88 | $2.00 | $7.60 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $500 | $650 | $610 | $600 | $720 | $610 | $641 | $500 | $500 |
| 659E31000 LIME | 0.41 ACRE | $500 | $80.00 | $80.00 | $75.00 | $95.00 | $80.00 | $84.00 | $100 | $500 |
| 659E35000 WATER | 10.6 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $5.00 | $1.00 | $1.00 | $12.00 | $10.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 47 FT | $12.00 | $20.00 | $15.00 | $20.00 | $15.00 | $20.00 | $20.50 | $18.89 | $20.00 |
| 611E06400 15" CONDUIT, TYPE D | 70 FT | $42.65 | $60.00 | $65.00 | $45.00 | $53.70 | $175 | $42.50 | $41.88 | $35.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 48 FT | $3.50 | $8.00 | $2.50 | $3.00 | $10.00 | $15.00 | $10.50 | $10.80 | $40.00 |
| 304E20000 AGGREGATE BASE | 67 CY | $48.10 | $55.00 | $80.00 | $60.00 | $50.00 | $65.00 | $74.50 | $70.97 | $75.00 |
| 407E10000 TACK COAT | 69 GAL | $1.75 | $1.75 | $3.00 | $3.00 | $18.00 | $4.35 | $17.00 | $1.75 | $6.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 32 CY | $48.90 | $100 | $80.00 | $50.00 | $55.00 | $175 | $72.50 | $72.88 | $50.00 |
| 621E00100 RPM | 4 EACH | $416 | $775 | $775 | $875 | $915 | $522 | $15.00 | $775 | $900 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $5.00 | $1.00 | $40.00 | $25.00 | $25.00 | $22.57 | $10.50 | $36.88 | $100 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $25.00 | $15.00 | $40.00 | $25.00 | $100 | $35.00 | $42.00 | $12.50 | $100 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $11,557 | $10,000 | $9,500 | $7,850 | $11,210 | $9,225 | $9,912 | $9,500 | $20,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $22,626 | $20,000 | $18,850 | $14,913 | $22,243 | $18,450 | $9,912 | $18,850 | $30,000 |
| 407E10000 TACK COAT | 50 GAL | $1.75 | $1.70 | $2.00 | $3.00 | $4.00 | $4.35 | $17.00 | $1.75 | $6.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $75.00 | $40.00 | $65.00 | $75.00 | $100 | $85.00 | $68.50 | $87.00 | $65.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $25.00 | $200 | $65.00 | $10.32 | $10.00 |
| 202E22900 APPROACH SLAB REMOVED | 89 SY | $11.70 | $20.00 | $18.00 | $100 | $50.00 | $50.00 | $45.50 | $26.25 | $50.00 |
| 202E23500 WEARING COURSE REMOVED | 82 SY | $6.25 | $8.00 | $18.00 | $18.00 | $10.00 | $15.00 | $31.50 | $17.17 | $20.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,000 | $2,000 | $13,000 | $20,000 | $4,500 | $20,000 | $25,000 | $10,198 | $20,000 |
| 503E31100 ROCK EXCAVATION | 102 CY | $25.50 | $40.00 | $80.00 | $85.00 | $90.00 | $125 | $69.00 | $98.01 | $150 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 63 SY | $45.00 | $35.00 | $36.00 | $17.00 | $28.00 | $45.00 | $12.50 | $45.00 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 63 SF | $1.40 | $15.00 | $5.00 | $5.00 | $10.00 | $15.00 | $6.50 | $3.80 | $20.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 33 CY | $54.60 | $90.00 | $110 | $100 | $110 | $150 | $99.50 | $59.36 | $150 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,200 | $750 | $1,600 | $1,000 | $2,250 | $2,000 | $600 | $1,660 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96461 20' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN | 100 FT | $1,832 | $183k | 40% |
| 624E10000 MOBILIZATION | 1 LS | $30,050 | $30k | 7% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 56 SY | $532 | $30k | 7% |
| 203E20000 EMBANKMENT | 1,725 CY | $15 | $26k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 75 CY | $298.5 | $22k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $305 | $15k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $245 | $14k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,783 LB | $2.34 | $14k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 40 CY | $325 | $13k | 3% |
| 512E33000 TYPE 2 WATERPROOFING | 539 SY | $23.5 | $13k | 3% |