CUY-/LAK-IR 271-13.61/00.00
CUY County · est $4.8M
Bid dateThursday, February 11—
CUY County · est $4.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 13,090 CY | $160 | $148 | $195 | 56% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 5,300 SY | $70.00 | $50.00 | $95.00 | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 326,589 SY | $1.00 | $1.00 | $1.30 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $430,000 | $377,188 | 8% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 2,550 SY | $50.00 | $45.00 |
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $1,000 | $2,000 | $470 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.00 | $2.00 | $1.25 |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 690 SY | $1.00 | $10.00 | $3.30 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 3,616 FT | $2.25 | $3.17 | $1.95 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $47.00 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $387,200 | $100,000 | 3% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 582 CY | $170 | $275 | $210 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 27,818 GAL | $2.50 | $2.15 | $1.91 | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,268 CY | $5.00 | $5.00 | $0.50 | 1% |
| 621E00100 RPM | 1,591 EACH | $23.50 | $23.50 | $23.50 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 475 CY | $50.00 | $85.00 | $125 | 1% |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 21.33 MILE | $1,000 | $762 | $750 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 36 SNMT | $585 | $585 | $585 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $65.00 | $65.00 | $80.00 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 21.33 MILE | $750 | $950 | $700 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,500 | $35,000 | $20,000 | 0% |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,636 FT | $7.50 | $7.50 | $7.50 | 0% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $2,000 | $2,000 | $2,000 | 0% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 769 STA | $15.00 | $20.00 | $70.00 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 21.33 MILE | $530 | $950 | $530 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,200 EACH | $2.50 | $1.00 | $2.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 21.33 MILE | $520 | $520 | $520 |
| 642E00204 LANE LINE, 6", TYPE 1 | 17.64 MILE | $225 | $225 | $225 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 11,261 FT | $0.75 | $0.75 | $0.75 |
| 646E10400 STOP LINE | 104 FT | $10.50 | $10.50 | $10.50 |
| 646E10500 CROSSWALK LINE | 461 FT | $6.50 | $6.50 | $6.50 |
| 646E20300 LANE ARROW | 15 EACH | $200 | $200 | $200 |
| 646E20320 WRONG WAY ARROW | 6 EACH | $250 | $250 | $250 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 5,638 FT | $0.65 | $0.65 | $0.65 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 6 EACH | $1,250 | $1,250 | $1,200 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 10 EACH | $165 | $165 | $165 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 50 CY | $90.00 | $200 | $130 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 9 SNMT | $900 | $900 | $900 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 17.64 MILE | $415 | $950 | $400 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 17.64 MILE | $350 | $950 | $350 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 11,261 FT | $0.75 | $1.00 | $0.70 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 11,261 FT | $0.70 | $1.00 | $0.70 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 5,638 FT | $0.65 | $1.00 | $0.60 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 5,638 FT | $0.60 | $1.00 | $0.60 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 104 FT | $2.50 | $3.50 | $2.40 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 104 FT | $2.40 | $3.50 | $2.40 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 461 FT | $2.10 | $3.50 | $2.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 461 FT | $2.00 | $3.50 | $2.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 15 EACH | $55.00 | $45.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 15 EACH | $50.00 | $45.00 | $50.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $20.00 | $20.00 | $20.00 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $15,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 13,090 CY | $160 | $2.09M | 54% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 5,300 SY | $70 | $371k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 326,589 SY | $1 | $327k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $300,000 | $300k | 8% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 2,550 SY | $50 | $128k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 582 CY | $170 | $99k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 27,818 GAL | $2.5 | $70k | 2% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,268 CY | $5 | $46k | 1% |
| 621E00100 RPM | 1,591 EACH | $23.5 | $37k | 1% |