HUR-CULVERT FY2021
HUR County · est $0.6M
Bid dateThursday, February 11—
HUR County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Catts Construction INC | R3Eclipse CO LLC | R4Bcc Ohio INC | R5R & I Construction INC | R6Geo Gradel CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,101 CY | $20.00 | $13.50 | $8.50 | $32.62 | $20.00 | $30.00 | 12% |
| 611E59100 103" X 71" CONDUIT, TYPE A, 707.03 (0.168) | 40 FT | $900 | $1,000 | $953 | $1,320 | $1,100 | $1,300 | 10% |
| 611E53300 53" X 83" CONDUIT, TYPE A, 706.04 | 90 FT | $387 | $585 | $458 | $814 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Catts Construction INC | R3Eclipse CO LLC | R4Bcc Ohio INC | R5R & I Construction INC | R6Geo Gradel CO |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $2,750 | $15,392 | $7,740 | $10,000 | $10,000 |
| 202E20010 HEADWALL REMOVED | 4 EACH | $400 | $475 | $1,795 | $690 | $500 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 552 SY | $8.00 | $14.50 | $13.00 | $14.23 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $800 |
| $580 |
| 10% |
| 611E26001 72" CONDUIT, TYPE A, AS PER PLAN | 88 FT | $355 | $716 | $500 | $766 | $800 | $700 | 9% |
| 659E00300 TOPSOIL | 549 CY | $55.00 | $48.00 | $48.50 | $37.35 | $20.00 | $40.00 | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 133 CY | $171 | $250 | $232 | $252 | $169 | $240 | 7% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 190 CY | $95.00 | $109 | $93.50 | $147 | $80.00 | $140 | 5% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 73 CY | $237 | $303 | $258 | $357 | $235 | $340 | 5% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 303 SY | $50.00 | $90.00 | $54.50 | $67.74 | $35.00 | $55.00 | 4% |
| 304E20000 AGGREGATE BASE | 228 CY | $55.00 | $60.00 | $55.50 | $89.19 | $60.00 | $100 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $2,900 | $22,000 | $4,020 | $6,000 | $10,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $12,500 | $12,381 | $25,000 | $16,590 | $42,000 | $20,000 | 4% |
| 659E10000 SEEDING AND MULCHING | 4,944 SY | $2.00 | $1.65 | $1.50 | $1.68 | $1.50 | $1.60 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 562.5 FT | $16.50 | $18.50 | $16.50 | $16.38 | $15.90 | $15.60 | 3% |
| 203E10000 EXCAVATION | 770 CY | $12.00 | $21.00 | $12.00 | $9.75 | $10.00 | $30.00 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $2,700 | $2,280 | $2,022 | $2,021 | $2,550 | $1,925 | 2% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (103" X | 93 FT | $85.00 | $167 | $173 | $158 | $600 | $330 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,550 | $5,555 | $11,000 | $7,694 | $6,000 | $10,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,500 | $6,228 | $8,060 | $6,505 | $6,195 | $3,000 | 2% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| $12.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 38 FT | $10.00 | $3.50 | $21.50 | $9.75 | $1.00 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 83 FT | $15.00 | $3.50 | $63.00 | $123 | $20.00 | $85.00 |
| 202E38000 GUARDRAIL REMOVED | 537.5 FT | $1.50 | $1.65 | $1.50 | $1.26 | $1.40 | $1.20 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $280 | $292 | $121 | $121 | $250 | $115 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $235 | $100 | $99.75 | $200 | $95.00 |
| 202E75000 FENCE REMOVED | 447 FT | $5.00 | $2.50 | $3.50 | $2.63 | $2.00 | $2.50 |
| 204E10000 SUBGRADE COMPACTION | 635 SY | $1.00 | $1.85 | $3.50 | $1.46 | $1.00 | $2.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $900 | $1,100 | $977 | $977 | $885 | $930 |
| 623E38500 MONUMENT ASSEMBLY | 5 EACH | $850 | $1,317 | $1,029 | $1,234 | $600 | $900 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 3 EACH | $600 | $1,317 | $409 | $292 | $400 | $400 |
| 659E00100 SOIL ANALYSIS TEST | 6 EACH | $250 | $59.00 | $26.00 | $52.50 | $25.00 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 247 SY | $1.00 | $0.50 | $0.50 | $0.51 | $1.00 | $3.00 |
| 659E15000 INTER-SEEDING | 247 SY | $1.00 | $0.50 | $0.11 | $0.11 | $0.10 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.7 TON | $4.00 | $912 | $330 | $323 | $500 | $308 |
| 659E31000 LIME | 1.02 ACRE | $1,200 | $1,169 | $48.00 | $47.25 | $10.00 | $45.00 |
| 659E35000 WATER | 27.37 MGAL | $1.00 | $1.00 | $1.00 | $1.05 | $1.00 | $2.00 |
| 605E31100 AGGREGATE DRAINS | 160 FT | $10.00 | $12.60 | $14.50 | $15.35 | $7.00 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C | 16 FT | $40.00 | $92.00 | $67.00 | $73.61 | $30.00 | $260 |
| 611E07600 18" CONDUIT, TYPE C | 75 FT | $50.00 | $77.00 | $65.50 | $89.53 | $35.00 | $100 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $1,050 | $2,717 | $2,499 | $2,142 | $2,000 | $3,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 276 SY | $6.00 | $12.00 | $20.50 | $25.20 | $30.00 | $24.00 |
| 407E10000 TACK COAT | 125 GAL | $4.00 | $2.00 | $10.50 | $1.05 | $4.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $100 | $5.80 | $19.00 | $15.60 | $5.00 | $105 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $8.00 | $9.00 | $8.00 | $7.88 | $8.00 | $7.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $19,000 | $9,065 | $23,690 | $16,275 | $17,875 | $23,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $25,000 | $9,065 | $33,990 | $16,275 | $23,830 | $33,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,000 | $1,037 | $927 | $998 | $950 | $500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,500 | $2,818 | $13,698 | $2,340 | $8,000 | $30,000 |
| 602E20000 CONCRETE MASONRY | 7.1 CY | $735 | $870 | $2,058 | $1,597 | $2,000 | $1,500 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,500 | $14,500 | $8,076 | $5,850 | $35,000 | $20,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,500 | $2,487 | $5,173 | $3,180 | $8,000 | $10,000 |
| 602E20000 CONCRETE MASONRY | 5.6 CY | $550 | $993 | $913 | $1,609 | $2,000 | $1,200 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $850 | $3,090 | $6,500 | $3,180 | $8,000 | $15,000 |
| 602E20000 CONCRETE MASONRY | 3.3 CY | $550 | $1,685 | $1,811 | $3,105 | $2,000 | $1,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,900 | $2,855 | $28,972 | $5,940 | $24,420 | $10,000 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $1,000 | $750 | $525 | $1,766 | $1,000 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 2,101 CY | $20 | $42k | 10% |
| 611E59100 103" X 71" CONDUIT, TYPE A, 707.03 (0.168) | 40 FT | $900 | $36k | 9% |
| 611E53300 53" X 83" CONDUIT, TYPE A, 706.04 | 90 FT | $386.5 | $35k | 8% |
| 611E26001 72" CONDUIT, TYPE A, AS PER PLAN | 88 FT | $354.5 | $31k | 7% |
| 659E00300 TOPSOIL | 549 CY | $55 | $30k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 133 CY | $171 | $23k | 5% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 190 CY | $95 | $18k | 4% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 73 CY | $237 | $17k | 4% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 303 SY | $50 | $15k | 4% |
| 304E20000 AGGREGATE BASE | 228 CY | $55 | $13k | 3% |