RIC-US 30-17.11
RIC County · est $0.5M
Bid dateThursday, February 25—
RIC County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Rietschlin Construction INC | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 470 CY | $155 | $144 | $143 | $137 | 21% |
| 611E10400 24" CONDUIT, TYPE B, 707.33 | 463 FT | $90.00 | $118 | $71.50 | $85.00 | 12% |
| 304E20000 AGGREGATE BASE | 571 CY | $55.00 | $52.00 | $67.50 | $66.00 | 9% |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 3 EACH | $8,000 | $4,450 | $8,134 | $17,360 | 7% |
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Rietschlin Construction INC | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $2,000 | $8,000 | $1,382 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $100 | $185 | $669 | $191 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 644 FT | $4.00 | $3.85 | $27.00 | $10.50 |
| 202E38000 GUARDRAIL REMOVED | 712.5 FT | $2.00 | $1.80 | $8.00 | $3.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D |
| 300 FT |
| $66.00 |
| $158 |
| $83.00 |
| $148 |
| 6% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 100 CY | $175 | $196 | $202 | $185 | 5% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 86 CY | $200 | $231 | $253 | $232 | 5% |
| 202E23000 PAVEMENT REMOVED | 1,130 SY | $14.00 | $15.00 | $35.00 | $9.50 | 4% |
| 203E10000 EXCAVATION | 713 CY | $19.00 | $17.75 | $21.00 | $23.50 | 4% |
| 611E10600 24" CONDUIT, TYPE C, 707.33 | 188 FT | $70.00 | $94.00 | $69.00 | $85.50 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 990 FT | $13.00 | $25.00 | $22.00 | $35.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $25,000 | $27,000 | $37,758 | 3% |
| 631E92001 SIGN FLASHER ASSEMBLY, AS PER PLAN | 1 EACH | $9,740 | $9,200 | $10,130 | $5,313 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $2,300 | $2,500 | $1,300 | $683 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 475 FT | $19.00 | $20.20 | $21.00 | $19.00 | 3% |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $4,400 | $2,500 | $3,523 | $9,862 | 2% |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 250 SY | $35.00 | $34.00 | $37.50 | $35.50 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,500 | $30,000 | $12,167 | $17,007 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $800 | $900 | $990 | $1,103 | 2% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 900 FT | $7.00 | $10.45 | $12.50 | $11.00 | 2% |
| $210 |
| $135 |
| $280 |
| $210 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $115 | $100 | $364 | $116 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $150 | $255 | $582 | $453 |
| 203E20000 EMBANKMENT | 82 CY | $19.00 | $18.00 | $23.00 | $33.00 |
| 204E10000 SUBGRADE COMPACTION | 2,021 SY | $1.30 | $3.00 | $2.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $90.00 | $180 | $96.00 | $221 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,400 | $2,625 | $2,542 | $2,468 |
| 606E35006 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, BARRIER DESI | 2 EACH | $2,200 | $1,930 | $2,272 | $2,205 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $80.00 | $100 | $52.00 | $26.50 |
| 659E00300 TOPSOIL | 95 CY | $37.00 | $73.00 | $35.00 | $49.00 |
| 659E10000 SEEDING AND MULCHING | 849 SY | $2.00 | $1.50 | $4.00 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 43 SY | $0.65 | $3.00 | $18.00 | $2.00 |
| 659E15000 INTER-SEEDING | 43 SY | $0.65 | $0.25 | $12.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1 TON | $350 | $800 | $500 | $578 |
| 659E31000 LIME | 1 ACRE | $30.00 | $0.10 | $400 | $105 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $2.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $651 | $600 | $696 | $773 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 23 FT | $9.00 | $45.00 | $16.00 | $20.00 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,300 | $2,850 | $1,914 | $2,157 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $370 | $614 | $222 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 200 SY | $20.00 | $3.90 | $3.00 | $2.50 |
| 407E20000 NON-TRACKING TACK COAT | 204 GAL | $3.00 | $2.25 | $3.75 | $3.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 47 GAL | $12.00 | $12.00 | $5.50 | $5.50 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 900 FT | $1.50 | $3.85 | $5.25 | $5.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 17 EACH | $95.00 | $90.00 | $99.00 | $76.50 |
| 625E14500 LIGHT POLE FOUNDATION | 1 EACH | $2,700 | $2,550 | $2,808 | $2,456 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 418 FT | $10.00 | $10.00 | $11.00 | $11.50 |
| 625E25408 CONDUIT, 2", 725.051 | 43 FT | $17.00 | $16.75 | $18.50 | $5.50 |
| 625E29000 TRENCH | 401 FT | $13.00 | $12.50 | $14.00 | $7.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,035 | $980 | $1,080 | $1,096 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,200 | $1,150 | $1,267 | $1,212 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $156 | $150 | $170 | $554 |
| 625E32000 GROUND ROD | 1 EACH | $280 | $265 | $292 | $172 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 401 FT | $0.85 | $0.85 | $1.00 | $0.14 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 1 EACH | $185 | $175 | $192 | $812 |
| 625E75800 DISCONNECT CIRCUIT | 2 EACH | $140 | $134 | $148 | $120 |
| 631E94490 REMOVAL, MISC.: SIGN FLASHER ASSEMBLY | 1 EACH | $850 | $800 | $880 | $635 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 116 FT | $3.17 | $2.40 | $3.00 | $3.50 |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 1 EACH | $2,750 | $2,600 | $2,863 | $2,564 |
| 644E00104 EDGE LINE, 6" | 0.18 MILE | $7,900 | $7,500 | $8,461 | $8,795 |
| 644E00204 LANE LINE, 6" | 0.23 MILE | $3,175 | $3,000 | $3,383 | $5,597 |
| 644E00404 CHANNELIZING LINE, 12" | 100 FT | $1.85 | $1.75 | $2.00 | $4.50 |
| 644E01510 DOTTED LINE, 6" | 800 FT | $1.50 | $1.45 | $2.00 | $2.50 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,680 | $2,627 | $2,045 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 31 EACH | $9.00 | $7.50 | $11.00 | $19.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 20 EACH | $15.00 | $7.50 | $14.00 | $33.50 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.31 MILE | $3,700 | $3,500 | $3,855 | $5,093 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,350 | $5,000 | $6,000 | $7,796 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,000 | $3,590 | $4,400 | $7,300 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 470 CY | $155 | $73k | 17% |
| 611E10400 24" CONDUIT, TYPE B, 707.33 | 463 FT | $90 | $42k | 10% |
| 304E20000 AGGREGATE BASE | 571 CY | $55 | $31k | 7% |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 3 EACH | $8,000 | $24k | 6% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 300 FT | $66 | $20k | 5% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 100 CY | $175 | $18k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 86 CY | $200 | $17k | 4% |
| 202E23000 PAVEMENT REMOVED | 1,130 SY | $14 | $16k | 4% |
| 203E10000 EXCAVATION | 713 CY | $19 | $14k | 3% |
| 611E10600 24" CONDUIT, TYPE C, 707.33 | 188 FT | $70 | $13k | 3% |