PRE-Spring St Bridge Replacement
PRE County · est $0.2M
Bid dateThursday, April 15—
PRE County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 35 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Axis Civil Construction LLC | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 515E10070 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 5 EACH | $11,600 | $11,250 | $12,700 | $15,207 | 30% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $25,000 | $35,000 | $25,000 | $3,049 | 13% |
| 520E10000 PNEUMATICALLY PLACED CONCRETE SHOTCRETE | 98 SF | $160 | $95.00 | $95.00 | $140 | 8% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 75 FT | $170 | $154 | $193 | $120 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Axis Civil Construction LLC | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 22 CY | $20.00 | $45.00 | $30.00 | $259 |
| 204E10000 SUBGRADE COMPACTION | 104 SY | $1.00 | $12.00 | $4.00 | $4.21 |
| 204E45000 PROOF ROLLING | 1 HOUR | $70.00 | $100 | $130 | $259 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $19.00 | $17.50 | $24.25 | $50.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 12 CF | $1,000 | $825 | $350 | $950 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $11,165 | $4,000 | $15,000 | $19,237 | 6% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,400 | $2,175 | $2,050 | $2,050 | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 3 EACH | $2,700 | $2,500 | $2,375 | $2,450 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 18 CY | $400 | $530 | $380 | $325 | 4% |
| 511E21521 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 7 CY | $850 | $1,050 | $1,080 | $869 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,500 | $4,500 | $2,800 | $3,916 | 2% |
| 512E33010 TYPE 3 WATERPROOFING | 77 SY | $45.00 | $45.00 | $38.00 | $28.00 | 2% |
| 659E00300 TOPSOIL | 49 CY | $55.00 | $55.00 | $45.00 | $234 | 1% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 20 EACH | $130 | $125 | $120 | $223 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3,500 | $4,500 | $1,699 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $500 | $2,500 | — | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $4,000 | $7,000 | $3,500 | 1% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $2,000 | $1,000 | $3,300 | $1,300 | 1% |
| 202E23500 WEARING COURSE REMOVED | 83 SY | $20.00 | $25.00 | $18.00 | $12.15 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4 CY | $400 | $540 | $650 | $500 | 1% |
| 1 EACH |
| $1,000 |
| $915 |
| $975 |
| $1,140 |
| 203E20000 EMBANKMENT | 6 CY | $20.00 | $50.00 | $30.00 | $61.26 |
| 202E23000 PAVEMENT REMOVED | 104 SY | $14.00 | $15.00 | $20.00 | — |
| 659E10000 SEEDING AND MULCHING | 441 SY | $3.00 | $5.00 | $3.00 | $18.47 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $2.00 | $1.00 | $1.00 | $31.89 |
| 659E15000 INTER-SEEDING | 22 SY | $2.00 | $1.00 | $4.00 | $31.89 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $650 | $1,250 | $350 | $5,126 |
| 659E31000 LIME | 0.09 ACRE | $5.00 | $10.00 | $300 | $7,593 |
| 659E35000 WATER | 2 MGAL | $5.00 | $10.00 | $10.00 | $683 |
| 832E30000 EROSION CONTROL | 632 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 5 CY | $90.00 | $125 | $155 | $247 |
| 602E20000 CONCRETE MASONRY | 1 CY | $600 | $800 | $1,950 | $979 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 36 FT | $5.00 | $2.00 | $6.00 | $9.72 |
| 304E20000 AGGREGATE BASE | 18 CY | $50.00 | $130 | $100 | $81.53 |
| 407E20000 NON-TRACKING TACK COAT | 12 GAL | $20.00 | $3.00 | $6.00 | $15.00 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $400 | $535 | $650 | $500 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 8 EACH | $8.00 | $7.50 | $10.50 | $10.00 |
| 630E01100 GROUND MOUNTED SUPPORT, NO. 1 POST | 48 FT | $12.00 | $18.00 | $17.00 | $9.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $30.00 | $22.00 | $20.50 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $50.00 | $13.00 | $25.00 | $25.00 |
| 202E38500 BRIDGE RAILING REMOVED | 80 FT | $8.00 | $5.00 | $35.00 | $6.69 |
| 407E20000 NON-TRACKING TACK COAT | 8 GAL | $20.00 | $3.00 | $6.00 | $10.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3 CY | $400 | $540 | $650 | $500 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $400 | $535 | $650 | $500 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 461 LB | $1.50 | $2.25 | $3.40 | $1.52 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 21 SY | $30.00 | $50.00 | $50.00 | $33.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 42 FT | $30.00 | $38.00 | $12.00 | $31.52 |
| 516E41100 1/8" PREFORMED BEARING PAD | 10 EACH | $25.00 | $8.00 | $33.00 | $49.55 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 68 FT | $12.00 | $16.00 | $15.00 | $29.77 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $1,500 | $6,500 | $3,500 | $1,773 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,000 | $1,500 | $3,500 | $1,666 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E10070 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 5 EACH | $11,600 | $58k | 27% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $25,000 | $25k | 12% |
| 520E10000 PNEUMATICALLY PLACED CONCRETE SHOTCRETE | 98 SF | $160 | $16k | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 75 FT | $170 | $13k | 6% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 12 CF | $1,000 | $12k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $11,165 | $11k | 5% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,400 | $10k | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 3 EACH | $2,700 | $8k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 18 CY | $400 | $7k | 3% |
| 511E21521 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 7 CY | $850 | $6k | 3% |