| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3Gerken Paving INC | % of bid |
|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2736 CY | $154 | $154 | $152 | 20% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,345 CY | $165 | $165 | $164 | 19% |
| 515E12091 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $24,000 | $27,000 | $24,500 | 9% |
| 253E02000 PAVEMENT REPAIR | 853 CY | $190 | $190 | $190 | 8% |
| 203E20000 EMBANKMENT | 5,696 CY | $18.50 | $18.00 |
| Item | Quantity | R1Miller Bros Const INC | R2Vernon Nagel INC | R3Gerken Paving INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $500 | $60,000 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $7,000 | $9,000 | $25,000 |
| 202E23000 PAVEMENT REMOVED | 209 SY | $10.00 | $10.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 1,200 FT | $2.00 | $3.00 | $2.00 |
| 203E10001 EXCAVATION, AS PER PLAN | 450 CY | $18.50 | $8.00 | $18.00 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $30.00 |
| 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" THICKNE | 56,472 SY | $1.80 | $1.80 | $1.80 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | 5% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 960 FT | $90.00 | $72.00 | $72.00 | 4% |
| 617E10100 COMPACTED AGGREGATE | 827 CY | $80.00 | $80.00 | $80.00 | 3% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 72 CY | $800 | $900 | $900 | 3% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $50,000 | $30,000 | $30,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 283 CY | $175 | $175 | $175 | 2% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 77 CY | $600 | $600 | $600 | 2% |
| 204E30030 GRANULAR MATERIAL, TYPE D | 667 CY | $62.00 | $80.00 | $78.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40,000 | $138,000 | 2% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 142 SY | $265 | $250 | $250 | 2% |
| 203E20000 EMBANKMENT | 2,832 CY | $12.50 | $14.00 | $14.00 | 2% |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 380 CY | $80.00 | $100 | $101 | 1% |
| 611E20900 48" CONDUIT, TYPE B, RCP | 84 FT | $348 | $375 | $710 | 1% |
| 304E20000 AGGREGATE BASE | 362 CY | $72.00 | $80.00 | $80.00 | 1% |
| 209 SY |
| $1.50 |
| $1.00 |
| $3.00 |
| 209E60500 LINEAR GRADING | 8 MILE | $1,100 | $750 | $1,100 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 8 MILE | $1,700 | $1,700 | $900 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 200 CY | $70.00 | $80.00 | $98.00 |
| 659E00300 TOPSOIL | 437 CY | $10.00 | $25.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 7,995 SY | $0.78 | $1.10 | $0.78 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $350 | $350 | $350 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $1,600 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,100 | $2,200 | $5,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,100 | $6,000 | $10,000 |
| 602E20000 CONCRETE MASONRY | 18 CY | $1,075 | $900 | $1,950 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 47 CY | $200 | $200 | $200 |
| 304E20000 AGGREGATE BASE | 35 CY | $89.50 | $80.00 | $115 |
| 407E20000 NON-TRACKING TACK COAT, INTERMEDIATE COURSE | 4,784 GAL | $1.95 | $1.95 | $1.95 |
| 407E20000 NON-TRACKING TACK COAT, SURFACE COURSE | 3,096 GAL | $1.95 | $1.95 | $1.95 |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 71 CY | $165 | $165 | $164 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (29 CY | $154 | $154 | $152 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 5,624 LB | $1.50 | $1.50 | $1.50 |
| 621E00100 RPM | 293 EACH | $28.00 | $29.62 | $28.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 293 EACH | $6.50 | $6.50 | $6.50 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 7.94 MILE | $700 | $700 | $800 |
| 642E00300 CENTER LINE, TYPE 1 | 3.97 MILE | $700 | $700 | $1,000 |
| 644E00500 STOP LINE | 30 FT | $20.00 | $20.00 | $20.00 |
| 512E73501 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 716 SY | $11.00 | $17.00 | $11.30 |
| 516E31000 JOINT SEALER | 67 FT | $8.00 | $16.00 | $19.35 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $85.00 | $85.00 | $110 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $144 | $144 | $110 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $56.00 | $56.00 | $60.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 15 MILE | $700 | $950 | $950 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $2,000 | $2,000 |
| 202E23000 PAVEMENT REMOVED | 1,660 SY | $5.00 | $10.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED | 791 FT | $2.00 | $3.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $115 | $115 | $115 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $65.00 | $65.00 | $65.00 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 20 FT | $17.00 | $17.00 | $17.00 |
| 203E10000 EXCAVATION | 1,717 CY | $12.50 | $10.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 1,985 SY | $1.50 | $1.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 230 CY | $13.50 | $10.00 | $10.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 260 CY | $52.00 | $80.00 | $80.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $55.00 | $150 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 780 SY | $1.80 | $1.50 | $1.50 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 700 FT | $19.80 | $19.80 | $19.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,395 | $2,395 | $2,395 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,120 | $2,120 | $2,120 |
| 659E00300 TOPSOIL | 356 CY | $10.00 | $25.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 3,206 SY | $0.78 | $0.78 | $0.78 |
| 659E14000 REPAIR SEEDING AND MULCHING | 160 SY | $0.40 | $0.40 | $0.40 |
| 659E15000 INTER-SEEDING | 160 SY | $0.30 | $0.30 | $0.30 |
| 659E20000 COMMERCIAL FERTILIZER | 0.45 TON | $350 | $350 | $350 |
| 659E31000 LIME | 0.66 ACRE | $10.00 | $10.00 | $10.00 |
| 659E35000 WATER | 18 MGAL | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 9,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 178 FT | $5.00 | $12.00 | $12.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $9.50 | $8.00 | $8.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $9.50 | $8.00 | $8.00 |
| 611E02600 8" CONDUIT, TYPE F | 50 FT | $14.00 | $10.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $55.00 | $60.00 | $60.00 |
| 407E20000 NON-TRACKING TACK COAT | 200 GAL | $1.95 | $1.95 | $1.95 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 77 CY | $164 | $164 | $164 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (88 CY | $190 | $190 | $190 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $12.50 | $5.00 | $5.45 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 1 EACH | $8.00 | $8.00 | $8.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 14 EACH | $8.00 | $8.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 8 FT | $55.00 | $10.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $60.00 | $25.00 | $60.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $25.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $15.00 | $15.00 |
| 616E10000 WATER | 9 MGAL | $55.00 | $1.00 | $16.52 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $30.00 | $35.00 | $35.00 |
| 202E23500 WEARING COURSE REMOVED | 350 SY | $6.00 | $12.00 | $12.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $4,100 | $4,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,000 | $16,000 | $16,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $25,000 | $25,000 | $25,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 880 FT | $10.00 | $5.00 | $5.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 17,896 LB | $1.35 | $1.25 | $1.25 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 114 SY | $11.00 | $10.00 | $10.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 45 SF | $6.50 | $12.00 | $12.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 14 FT | $33.00 | $40.00 | $40.00 |
| 516E20010 1" ELASTOMERIC ERECTION STRIP | 67 SF | $80.00 | $125 | $125 |
| 516E41100 1/8" PREFORMED BEARING PAD | 16 EACH | $6.50 | $15.00 | $15.00 |
| 517E70000 RAILING (TWIN STEEL TUBE) | 172 FT | $152 | $152 | $152 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $7,000 | $6,500 | $6,500 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 195 FT | $13.00 | $12.00 | $12.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 103 FT | $9.00 | $8.00 | $8.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $18.00 | $8.00 | $8.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,000 | $3,200 | $3,200 |
| 526E90021 TYPE B INSTALLATION, AS PER PLAN | 37 SY | $85.00 | $55.00 | $55.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $25,000 | $30,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,600 | $12,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2736 CY | $154 | $421k | 16% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2,345 CY | $165 | $387k | 15% |
| 515E12091 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $24,000 | $192k | 7% |
| 253E02000 PAVEMENT REPAIR | 853 CY | $190 | $162k | 6% |
| 203E20000 EMBANKMENT | 5,696 CY | $18.5 | $105k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" THICKNE | 56,472 SY | $1.8 | $102k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 960 FT | $90 | $86k | 3% |
| 617E10100 COMPACTED AGGREGATE | 827 CY | $80 | $66k | 3% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 72 CY | $800 | $58k | 2% |