D12-PPM FY2021
D12 County · est $1.4M
Bid dateThursday, April 15—
D12 County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 57 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | % of bid |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $159,983 | $225,000 | 14% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 806 CY | $198 | $350 | 14% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 602 CY | $217 | $225 | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 40,730 SY | $2.46 | $2.40 | 9% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $406 | $425 | 7% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "A" | 80 CY | $786 | $2,000 | 5% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, | 965 SY | $64.15 | $75.00 | 5% |
| 442E20001 |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC |
|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 243 SY | $29.59 | $25.00 |
| 203E10000 EXCAVATION | 20 CY | $50.00 | $25.00 |
| 204E10001 SUBGRADE COMPACTION, AS PER PLAN | 243 SY | $1.00 | $1.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 130 FT | $10.00 | $3.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $600 | $700 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 290 CY |
| $212 |
| $250 |
| 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $291 | $300 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $57,500 | $120,000 | 5% |
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | — | $182 | $275 | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 460 HOUR | $100 | $75.00 | 4% |
| 452E15030 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 243 SY | $91.50 | $125 | 2% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 1,400 SF | $15.00 | $15.00 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 75 SY | $276 | $425 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 4,433 GAL | $3.50 | $2.25 | 1% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $1.28 | $1.75 | 1% |
| 621E00100 RPM | 215 EACH | $56.99 | $56.99 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 9 EACH | $1,250 | $1,300 | 1% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 36.4 STA | $306 | $100 | 1% |
| 1 EACH |
| $2,000 |
| $1,500 |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $950 | $1,400 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $750 | $800 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $1,250 | $1,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,000 LB | $1.50 | $1.75 |
| 304E20000 AGGREGATE BASE | 20 CY | $75.00 | $65.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 45.14 CY | $214 | $185 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 0.87 MILE | $10,885 | $5,000 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 1.03 MILE | $9,971 | $5,000 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,367 LB | $4.45 | $0.65 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $600 | $700 |
| 621E00301 RPM REFLECTOR, AS PER PLAN | 4 EACH | $11.82 | $12.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 212 EACH | $1.00 | $2.00 |
| 646E10010 EDGE LINE, 6" | 2.77 MILE | $2,618 | $2,618 |
| 646E10100 LANE LINE, 4" | 0.43 MILE | $1,330 | $1,330 |
| 646E10110 LANE LINE, 6" | 2.74 MILE | $1,459 | $1,459 |
| 646E10200 CENTER LINE | 0.38 MILE | $3,132 | $3,132 |
| 646E10300 CHANNELIZING LINE, 8" | 669 FT | $1.73 | $1.73 |
| 646E10310 CHANNELIZING LINE, 12" | 2,541 FT | $1.93 | $1.93 |
| 646E10400 STOP LINE | 113 FT | $11.90 | $11.90 |
| 646E10500 CROSSWALK LINE | 307 FT | $5.95 | $5.95 |
| 646E10620 CHEVRON MARKING | 298 FT | $6.54 | $6.54 |
| 646E20300 LANE ARROW | 6 EACH | $225 | $225 |
| 646E20400 WORD ON PAVEMENT, 72" | 1 EACH | $189 | $189 |
| 646E20510 DOTTED LINE, 12" | 828 FT | $1.22 | $1.22 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.08 MILE | $20,812 | $20,812 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $2,654 | $2,654 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,500 | $1,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $250 | $200 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 14 SNMT | $700 | $1,050 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.43 MILE | $368 | $369 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 2.74 MILE | $379 | $379 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.43 MILE | $330 | $331 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.42 MILE | $362 | $362 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.38 MILE | $1,081 | $1,081 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.38 MILE | $604 | $604 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 2.77 MILE | $833 | $833 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.94 MILE | $471 | $472 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 145 FT | $0.63 | $0.63 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 2,307 FT | $0.74 | $0.74 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 145 FT | $0.71 | $0.71 |
| 614E24208 WORK ZONE DOTTED LINE, CLASS I, 12", 642 PAINT | 638 FT | $0.46 | $0.46 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 48 FT | $2.89 | $2.89 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 113 FT | $2.41 | $2.41 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 83 FT | $3.21 | $3.21 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 307 FT | $2.56 | $2.56 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 307 FT | $3.01 | $3.01 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 6 EACH | $56.64 | $56.64 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $56.44 | $56.44 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,300 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $50.00 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $159,983 | $160k | 12% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 806 CY | $197.71 | $159k | 12% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 602 CY | $216.65 | $130k | 10% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 40,730 SY | $2.46 | $100k | 8% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $405.82 | $81k | 6% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "A" | 80 CY | $785.78 | $63k | 5% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, | 965 SY | $64.15 | $62k | 5% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 290 CY | $212.19 | $62k | 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $290.66 | $58k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $57,500 | $58k | 4% |