SUM-IR 77/277/US 224 Various
SUM County · est $56M
Bid dateThursday, May 13—
SUM County · est $56M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 510 more items below.
| Item | Quantity | R1Kenmore Construction CO INC | R2Karvo Companies INC | R3Shelly & Sands INC | R4Shelly Company | R5Great Lakes Construction CO | R6Kokosing Construction Company INC | R7Beaver Excavating Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 317,540 SF | $24.00 | $23.00 | $26.50 | $23.60 | $23.50 | $27.20 | $26.00 | 23% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 63,962 CY | $97.00 | $101 | $97.00 | $83.50 | $90.00 | $115 | $90.00 | 19% |
| 304E20000 |
| Item | Quantity | R1Kenmore Construction CO INC | R2Karvo Companies INC | R3Shelly & Sands INC | R4Shelly Company | R5Great Lakes Construction CO | R6Kokosing Construction Company INC | R7Beaver Excavating Company |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $200,000 | $155,000 | $170,000 | $200,000 | $655,000 | $335,000 | $650,000 |
| 202E20010 HEADWALL REMOVED | 29 EACH | $300 | $675 | $216 | $2,100 | $200 | $400 | $500 |
| 202E30700 CONCRETE BARRIER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 50,747 CY |
| $40.00 |
| $52.00 |
| $46.00 |
| $34.00 |
| $55.60 |
| $64.00 |
| $64.00 |
| 6% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,662 CY | $170 | $170 | $195 | $165 | $170 | $220 | $170 | 6% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 13,777 CY | $140 | $130 | $125 | $120 | $130 | $160 | $130 | 6% |
| 202E23000 PAVEMENT REMOVED | 233,574 SY | $7.00 | $6.70 | $6.00 | $5.14 | $11.25 | $8.45 | $8.50 | 5% |
| 513E10301 STRUCTURAL STEEL MEMBERS, LEVEL 5, AS PER PLAN | 658,400 LB | $2.20 | $2.21 | $2.10 | $2.31 | $2.16 | $2.00 | $2.86 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $1,200,000 | $1,975,000 | $1,200,000 | $1,200,000 | $1,200,000 | $1,200,000 | $1,600,000 | 4% |
| 832E30000 EROSION CONTROL | 1,150,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 203E10000 EXCAVATION | 171,865 CY | $6.50 | $7.25 | $10.00 | $18.50 | $12.50 | $7.00 | $18.00 | 3% |
| 206E10500 CEMENT | 7,629 TON | $142 | $135 | $135 | $135 | $152 | $135 | $135 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 124,795 FT | $7.50 | $8.75 | $7.00 | $8.50 | $8.00 | $5.00 | $11.50 | 3% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 65,167 FT | $9.50 | $8.75 | $9.00 | $8.40 | $8.00 | $8.00 | $10.00 | 2% |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 5,708 FT | $108 | $150 | $135 | $125 | $130 | $110 | $148 | 2% |
| 203E20000 EMBANKMENT | 101,350 CY | $6.00 | $2.75 | $6.00 | $20.15 | $7.50 | $2.00 | $8.00 | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 70,071 FT | $8.50 | $6.45 | $9.00 | $6.05 | $6.00 | $6.50 | $8.00 | 2% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 847 CY | $700 | $700 | $750 | $600 | $810 | $850 | $935 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 32,678 FT | $18.00 | $21.20 | $20.00 | $20.40 | $20.40 | $20.40 | $20.40 | 2% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 294,563 SY | $1.72 | $2.35 | $2.00 | $2.20 | $2.30 | $2.75 | $1.69 | 2% |
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 194,393 LB | $2.55 | $2.90 | $2.40 | $2.85 | $2.60 | $2.90 | $2.65 | 2% |
| 3,750 FT |
| $7.00 |
| $10.00 |
| $16.00 |
| $13.15 |
| $20.00 |
| $11.00 |
| $40.00 |
| 202E32000 CURB REMOVED | 169 FT | $3.00 | $1.55 | $2.10 | $6.00 | $2.00 | $1.00 | $10.00 |
| 202E32700 GUTTER REMOVED | 86 SY | $3.00 | $12.00 | $11.00 | $14.25 | $26.00 | $9.00 | $10.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 4,542 FT | $12.00 | $3.25 | $17.00 | $8.25 | $11.00 | $21.50 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 168 FT | $20.00 | $25.00 | $48.00 | $32.00 | $40.00 | $48.00 | $40.00 |
| 202E38000 GUARDRAIL REMOVED | 34,740 FT | $1.80 | $2.00 | $2.00 | $1.80 | $1.80 | $1.80 | $1.80 |
| 202E48000 CABLE BARRIER REMOVED | 2,027 FT | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.50 | $1.00 |
| 202E58100 CATCH BASIN REMOVED | 36 EACH | $200 | $100 | $240 | $580 | $410 | $550 | $310 |
| 202E58200 INLET REMOVED | 3 EACH | $200 | $425 | $250 | $1,100 | $535 | $225 | $490 |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $200 | $685 | $700 | $1,000 | $1,000 | $675 | $260 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 586 FT | $8.00 | $6.75 | $35.00 | $15.00 | $25.00 | $14.00 | $30.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 18" | 360 FT | $10.00 | $11.75 | $35.00 | $20.00 | $25.00 | $16.00 | $50.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 24" | 308 FT | $18.00 | $20.75 | $43.00 | $58.00 | $27.00 | $20.00 | $40.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 30" | 214 FT | $30.00 | $42.00 | $46.00 | $85.00 | $30.00 | $28.00 | $50.00 |
| 202E75000 FENCE REMOVED | 10,998 FT | $2.25 | $2.50 | $3.00 | $2.50 | $2.50 | $3.00 | $2.50 |
| 204E10000 SUBGRADE COMPACTION | 2,071 SY | $3.00 | $1.25 | $3.00 | $1.00 | $2.60 | $2.00 | $3.75 |
| 204E13000 EXCAVATION OF SUBGRADE | 935 CY | $15.00 | $13.00 | $16.00 | $10.00 | $23.00 | $10.00 | $18.00 |
| 204E20000 EMBANKMENT | 935 CY | $15.00 | $6.50 | $16.00 | $10.00 | $8.50 | $5.00 | $8.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 100 CY | $70.00 | $65.00 | $62.00 | $160 | $72.00 | $55.00 | $60.00 |
| 204E45000 PROOF ROLLING | 156 HOUR | $130 | $160 | $330 | $100 | $345 | $190 | $180 |
| 206E11000 CURING COAT | 294,563 SY | $0.74 | $0.65 | $1.00 | $0.72 | $0.85 | $0.72 | $0.70 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $44,000 | $40,000 | $43,000 | $40,000 | $50,000 | $40,000 | $40,000 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 375 STA | $100 | $40.00 | $56.00 | $45.00 | $235 | $140 | $280 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,770 FT | $20.00 | $23.00 | $22.00 | $21.60 | $21.60 | $21.60 | $21.60 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 250 FT | $25.00 | $28.40 | $30.00 | $27.20 | $27.20 | $27.20 | $27.20 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 50 FT | $34.00 | $37.00 | $40.00 | $37.40 | $37.40 | $37.40 | $37.40 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 25 FT | $34.00 | $35.00 | $40.00 | $36.40 | $36.40 | $36.40 | $36.40 |
| 606E20050 ROUNDED END SECTION | 1 EACH | $62.00 | $60.00 | $70.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 22 EACH | $2,200 | $2,640 | $2,700 | $2,545 | $2,545 | $2,545 | $2,545 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 22 EACH | $900 | $1,050 | $1,000 | $1,020 | $1,020 | $1,020 | $1,020 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 24 EACH | $2,000 | $2,375 | $2,400 | $2,270 | $2,270 | $2,270 | $2,270 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 17 EACH | $560 | $550 | $630 | $595 | $595 | $595 | $595 |
| 606E60002 IMPACT ATTENUATOR, TYPE 1 (UNIDIRECTIONAL) | 1 EACH | $5,100 | $5,675 | $5,800 | $5,450 | $5,450 | $5,450 | $5,450 |
| 606E60040 IMPACT ATTENUATOR, TYPE 3 UNIDIRECTIONAL (60 MPH, | 1 EACH | $36,000 | $42,425 | $44,000 | $41,225 | $41,225 | $41,225 | $41,225 |
| 606E60040 IMPACT ATTENUATOR, TYPE 3 UNIDIRECTIONAL (65 MPH, | 1 EACH | $36,000 | $41,300 | $43,000 | $40,200 | $40,200 | $40,200 | $40,200 |
| 606E60040 IMPACT ATTENUATOR, TYPE 3 UNIDIRECTIONAL (70 MPH, | 1 EACH | $35,400 | $38,325 | $39,000 | $36,450 | $36,450 | $36,450 | $36,450 |
| 607E23000 FENCE, TYPE CLT | 1,518 FT | $28.00 | $31.50 | $31.00 | $29.50 | $29.50 | $29.50 | $29.50 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 1,518 FT | $1.50 | $1.50 | $2.00 | $1.50 | $1.00 | $0.53 | $1.50 |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 2,100 FT | $107 | $128 | $114 | $82.00 | $90.00 | $85.00 | $120 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,983 FT | $95.00 | $75.00 | $102 | $70.00 | $74.00 | $90.00 | $105 |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 71 FT | $125 | $170 | $148 | $140 | $144 | $165 | $170 |
| 622E10200 BARRIER TRANSITION | 3 EACH | $4,200 | $9,500 | $5,860 | $5,000 | $5,200 | $4,750 | $7,800 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 23 EACH | $3,200 | $3,575 | $6,200 | $3,300 | $3,400 | $2,700 | $3,600 |
| 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN | 3 EACH | $3,400 | $4,200 | $6,000 | $3,800 | $3,900 | $3,400 | $3,850 |
| 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 14 EACH | $3,800 | $4,350 | $3,250 | $3,000 | $3,000 | $2,600 | $3,650 |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 56 EACH | $4,000 | $4,000 | $5,100 | $3,500 | $3,600 | $3,100 | $4,000 |
| 622E25015 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 4 EACH | $4,300 | $4,000 | $5,870 | $3,300 | $3,300 | $5,000 | $4,100 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 9 EACH | $3,250 | $3,850 | $4,690 | $3,000 | $3,050 | $2,750 | $3,300 |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $3,700 | $4,000 | $5,010 | $5,300 | $5,550 | $3,750 | $3,900 |
| 623E38500 MONUMENT ASSEMBLY | 12 EACH | $800 | $950 | $1,400 | $950 | $740 | $650 | $1,200 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 2 EACH | $700 | $550 | $500 | $425 | $480 | $275 | $500 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 6 EACH | $500 | $640 | $190 | $870 | $930 | $200 | $350 |
| 607E98000 FENCE, MISC.:, TEMPORARY FENCE | 9,982 FT | $6.00 | $6.50 | $6.00 | $6.15 | $5.00 | $2.50 | $5.50 |
| 601E11000 RIPRAP, TYPE D | 8 SY | $200 | $200 | $455 | $71.50 | $178 | $172 | $240 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 520 SY | $40.00 | $22.00 | $41.00 | $23.00 | $32.50 | $34.00 | $35.00 |
| 601E21000 CONCRETE SLOPE PROTECTION | 272 SY | $65.00 | $125 | $94.00 | $120 | $128 | $72.00 | $65.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 136 SY | $20.00 | $90.00 | $120 | $250 | $129 | $95.00 | $90.00 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 94 SY | $65.00 | $50.00 | $65.00 | $275 | $93.00 | $70.00 | $75.00 |
| 601E28101 DUMPED ROCK FILL, AS PER PLAN | 21 CY | $90.00 | $80.00 | $145 | $100 | $98.00 | $130 | $230 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 26 CY | $80.00 | $165 | $112 | $90.00 | $135 | $160 | $145 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 61 CY | $75.00 | $80.00 | $120 | $80.00 | $143 | $150 | $155 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 12 CY | $100 | $140 | $130 | $140 | $200 | $165 | $150 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 7 CY | $100 | $160 | $180 | $195 | $260 | $200 | $225 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 637 CY | $85.00 | $80.00 | $114 | $125 | $88.00 | $130 | $145 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 70 CY | $100 | $190 | $175 | $230 | $190 | $200 | $125 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 20 CY | $110 | $300 | $200 | $200 | $170 | $270 | $140 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 78 FT | $75.00 | $45.00 | $118 | $82.00 | $88.00 | $80.00 | $75.00 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 507 FT | $80.00 | $100 | $160 | $67.00 | $70.00 | $93.00 | $65.00 |
| 659E00100 SOIL ANALYSIS TEST | 3 EACH | $25.00 | $200 | $200 | $200 | $25.00 | $190 | $25.00 |
| 659E00300 TOPSOIL | 25,156 CY | $5.00 | $10.00 | $15.50 | $18.50 | $11.60 | $5.75 | $7.00 |
| 659E10000 SEEDING AND MULCHING | 226,634 SY | $0.54 | $0.60 | $0.50 | $0.63 | $0.56 | $0.40 | $0.56 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11,332 SY | $0.56 | $1.00 | $0.50 | $1.00 | $0.56 | $0.38 | $0.56 |
| 659E15000 INTER-SEEDING | 11,332 SY | $0.15 | $0.02 | $0.50 | $0.01 | $0.15 | $0.38 | $0.15 |
| 659E20000 COMMERCIAL FERTILIZER | 31.62 TON | $250 | $1,000 | $625 | $1,000 | $250 | $569 | $250 |
| 659E31000 LIME | 46.83 ACRE | $25.00 | $0.08 | $100 | $0.50 | $25.00 | $91.95 | $25.00 |
| 659E35000 WATER | 1,255 MGAL | $0.01 | $0.02 | $2.00 | $0.01 | $0.01 | $1.42 | $0.01 |
| 670E00500 SLOPE EROSION PROTECTION | 7,312 SY | $1.05 | $1.80 | $2.00 | $1.80 | $1.05 | $2.00 | $1.05 |
| 670E00700 DITCH EROSION PROTECTION | 20,260 SY | $1.10 | $1.70 | $2.00 | $1.70 | $1.10 | $1.75 | $1.10 |
| 671E15060 EROSION CONTROL MAT, TYPE G | 242 SY | $2.00 | $3.00 | $4.00 | $3.00 | $2.00 | $3.50 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,500 | $5,000 | $3,900 | $3,695 | $5,000 | $3,695 | $15,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $30,000 | $43,000 | $32,000 | $20,440 | $28,000 | $29,202 | $35,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $20,000 | $30,000 | $25,000 | $25,000 | $25,000 | $29,000 | $35,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 5,435 SY | $3.80 | $5.50 | $2.00 | $5.50 | $3.80 | $2.00 | $3.80 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 299 SY | $4.25 | $6.50 | $4.00 | $6.50 | $4.25 | $3.50 | $4.25 |
| 601E32311 ROCK CHANNEL PROTECTION, TYPE D WITH AGGREGATE FIL | 249 CY | $85.00 | $145 | $250 | $86.00 | $150 | $195 | $145 |
| 601E32211 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 177 CY | $85.00 | $135 | $90.00 | $112 | $120 | $167 | $115 |
| 602E20000 CONCRETE MASONRY | 23.9 CY | $1,300 | $1,300 | $1,100 | $2,615 | $2,100 | $2,400 | $1,500 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 1,993 FT | $10.00 | $9.55 | $10.00 | $9.00 | $15.00 | $14.00 | $12.50 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 1,464 FT | $12.00 | $20.00 | $24.00 | $31.00 | $17.00 | $22.00 | $15.00 |
| 611E00900 6" CONDUIT, TYPE B | 3,148 FT | $14.00 | $13.00 | $23.00 | $9.00 | $17.00 | $24.50 | $20.00 |
| 611E01100 6" CONDUIT, TYPE C | 200 FT | $5.00 | $8.00 | $17.00 | $15.00 | $30.00 | $23.50 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E | 200 FT | $4.00 | $8.00 | $17.00 | $15.00 | $15.00 | $21.50 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 240 FT | $5.00 | $12.50 | $17.00 | $12.80 | $15.00 | $22.00 | $20.00 |
| 611E05900 15" CONDUIT, TYPE B | 4,428 FT | $76.00 | $65.00 | $68.00 | $40.80 | $74.00 | $82.00 | $85.00 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 9 FT | $200 | $115 | $138 | $153 | $198 | $185 | $240 |
| 611E06100 15" CONDUIT, TYPE C | 327 FT | $60.00 | $60.00 | $62.00 | $37.21 | $74.00 | $65.00 | $140 |
| 611E06700 15" CONDUIT, TYPE F | 665 FT | $80.00 | $108 | $85.00 | $45.75 | $87.00 | $85.00 | $135 |
| 611E07200 18" CONDUIT, TYPE A, 706.02 | 7 FT | $400 | $115 | $152 | $210 | $310 | $400 | $160 |
| 611E07400 18" CONDUIT, TYPE B | 1,054 FT | $83.00 | $65.00 | $72.00 | $45.30 | $66.00 | $90.00 | $80.00 |
| 611E07600 18" CONDUIT, TYPE C | 121 FT | $68.00 | $70.00 | $90.00 | $56.00 | $108 | $105 | $90.00 |
| 611E08200 18" CONDUIT, TYPE F | 40 FT | $100 | $128 | $1,200 | $60.00 | $100 | $110 | $145 |
| 611E08900 21" CONDUIT, TYPE B | 554 FT | $97.00 | $75.00 | $100 | $64.50 | $92.00 | $130 | $110 |
| 611E09100 21" CONDUIT, TYPE C | 297 FT | $72.00 | $65.00 | $88.00 | $42.00 | $75.00 | $85.00 | $95.00 |
| 611E10200 24" CONDUIT, TYPE A | 103 FT | $76.00 | $75.00 | $93.00 | $95.00 | $105 | $105 | $115 |
| 611E10200 24" CONDUIT, TYPE A, 706.02 | 10 FT | $350 | $145 | $136 | $178 | $300 | $400 | $285 |
| 611E10400 24" CONDUIT, TYPE B | 101 FT | $105 | $125 | $136 | $70.00 | $135 | $170 | $260 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 8 FT | $300 | $155 | $173 | $289 | $305 | $225 | $310 |
| 611E13400 30" CONDUIT, TYPE B | 183 FT | $134 | $115 | $120 | $88.00 | $135 | $140 | $210 |
| 611E13600 30" CONDUIT, TYPE C | 90 FT | $100 | $100 | $120 | $65.00 | $130 | $150 | $170 |
| 611E16400 36" CONDUIT, TYPE B | 44 FT | $135 | $158 | $142 | $151 | $185 | $235 | $225 |
| 611E16600 36" CONDUIT, TYPE C | 130 FT | $104 | $118 | $190 | $77.49 | $170 | $175 | $410 |
| 611E23600 60" CONDUIT, TYPE A, 706.02 | 16 FT | $570 | $500 | $414 | $663 | $590 | $710 | $805 |
| 611E25000 66" CONDUIT, TYPE A, 706.02 | 12 FT | $775 | $625 | $515 | $930 | $850 | $985 | $960 |
| 611E30000 96" CONDUIT, TYPE A, 707.02, 707.03 OR 707.04 | 20 FT | $790 | $475 | $452 | $853 | $610 | $950 | $1,500 |
| 611E95001 10' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 16 FT | $1,400 | $1,325 | $2,600 | $1,500 | $2,500 | $2,900 | $2,500 |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 96" 707.02, 707.03 | 317 FT | $97.00 | $170 | $500 | $185 | $185 | $150 | $225 |
| 611E96560 CONDUIT, FIELD PAVING OF PIPE, 96" 707.02, 707.03 | 20 FT | $900 | $170 | $845 | $539 | $160 | $100 | $300 |
| 611E96600 CONDUIT, BORED OR JACKED 15", TYPE B, 748.06 | 460 FT | $340 | $275 | $241 | $444 | $295 | $325 | $260 |
| 611E96600 CONDUIT, BORED OR JACKED 18", TYPE B, 748.06 | 155 FT | $360 | $280 | $369 | $416 | $260 | $280 | $380 |
| 611E96600 CONDUIT, BORED OR JACKED 30", TYPE A, 748.06 | 294 FT | $425 | $425 | $510 | $572 | $365 | $415 | $420 |
| 611E96600 CONDUIT, BORED OR JACKED 42", TYPE B, 748.06 | 199 FT | $570 | $540 | $800 | $965 | $940 | $525 | $550 |
| 611E97400 CONDUIT, MISC.: 18", TYPE B, 748.06, OPEN CUT | 22 FT | $220 | $180 | $325 | $377 | $195 | $210 | $270 |
| 611E97400 CONDUIT, MISC.: 30", TYPE A, 748.06, OPEN CUT | 46 FT | $300 | $225 | $455 | $356 | $300 | $350 | $390 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 1 EACH | $4,200 | $4,000 | $5,230 | $3,615 | $5,900 | $6,600 | $4,400 |
| 611E98180 CATCH BASIN, NO. 3A | 6 EACH | $2,600 | $2,500 | $2,900 | $2,507 | $2,550 | $3,800 | $2,700 |
| 611E98370 CATCH BASIN, NO. 6 | 2 EACH | $2,200 | $2,000 | $2,900 | $2,365 | $2,400 | $3,500 | $1,800 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 1 EACH | $2,100 | $3,000 | $5,000 | $2,790 | $5,400 | $4,500 | $2,300 |
| 611E98410 CATCH BASIN, NO. 8 | 13 EACH | $2,700 | $3,800 | $4,200 | $3,078 | $4,100 | $5,000 | $3,300 |
| 611E99100 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1 | 7 EACH | $5,300 | $5,500 | $8,840 | $10,195 | $14,000 | $9,800 | $7,500 |
| 611E99110 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1 | 21 EACH | $5,900 | $5,925 | $9,500 | $11,614 | $14,000 | $10,500 | $8,500 |
| 611E99111 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1, AS | 1 EACH | $5,800 | $6,050 | $9,600 | $10,500 | $14,000 | $9,850 | $8,500 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 3 EACH | $4,900 | $5,750 | $9,900 | $8,080 | $10,000 | $9,500 | $8,000 |
| 611E99574 MANHOLE, NO. 3 | 6 EACH | $3,200 | $4,500 | $5,700 | $4,350 | $5,100 | $4,000 | $3,000 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $2,800 | $875 | $2,450 | $1,700 | $3,200 | $1,900 | $1,700 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 68 EACH | $140 | $225 | $300 | $250 | $360 | $400 | $350 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 10,000 LB | $2.00 | $1.50 | $2.00 | $1.24 | $1.35 | $2.00 | $1.50 |
| 611E96600 CONDUIT, BORED OR JACKED 24", TYPE B, 748.06 | 102 FT | $525 | $315 | $460 | $507 | $315 | $460 | $280 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1 1/4" | 567 SY | $5.00 | $8.00 | $13.00 | $18.00 | $7.00 | $17.00 | $7.00 |
| 407E20000 NON-TRACKING TACK COAT | 47,340 GAL | $3.00 | $2.00 | $3.00 | $2.50 | $2.85 | $2.40 | $2.85 |
| 408E10001 PRIME COAT, AS PER PLAN | 1,792 GAL | $3.00 | $5.00 | $3.00 | $3.50 | $3.00 | $3.25 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 61 CY | $185 | $225 | $230 | $330 | $200 | $325 | $200 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (61 CY | $180 | $185 | $144 | $155 | $140 | $205 | $140 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1153 CY | $200 | $210 | $270 | $190 | $180 | $310 | $180 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 17,440 CY | $1.00 | $5.50 | $0.55 | $16.50 | $10.00 | $0.50 | $10.00 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 749 FT | $15.00 | $30.00 | $36.00 | $55.00 | $60.00 | $45.00 | $40.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 250 CY | $40.00 | $90.00 | $243 | $55.00 | $50.00 | $253 | $50.00 |
| 617E20000 SHOULDER PREPARATION | 4,479 SY | $2.00 | $0.55 | $2.00 | $0.50 | $0.50 | $0.20 | $0.50 |
| 617E25000 WATER | 13 MGAL | $1.00 | $10.00 | $147 | $4.98 | $70.00 | $5.00 | $5.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 13 MILE | $975 | $975 | $1,841 | $1,600 | $975 | $995 | $850 |
| 611E12100 27" CONDUIT, TYPE C, 707.48 (SANITARY) | 126 FT | $215 | $225 | $223 | $155 | $250 | $200 | $450 |
| 611E99574 MANHOLE, NO. 3 (SANITARY) | 1 EACH | $10,000 | $8,500 | $50,500 | $5,020 | $18,000 | $11,000 | $45,000 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN (SANITARY) | 2 EACH | $4,400 | $8,200 | $6,000 | $6,040 | $10,300 | $6,000 | $10,000 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN (SANITARY) | 2 EACH | $500 | $1,075 | $580 | $1,500 | $770 | $650 | $700 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 84 EACH | $90.00 | $125 | $132 | $125 | $125 | $95.00 | $95.00 |
| 625E13200 LIGHT TOWER, BBBB100 | 5 EACH | $15,000 | $19,750 | $20,600 | $19,750 | $19,750 | $19,500 | $19,500 |
| 625E13400 LIGHT TOWER, BBBBBB100 | 7 EACH | $15,000 | $19,750 | $20,600 | $19,750 | $19,750 | $19,550 | $19,550 |
| 625E13404 LIGHT TOWER, BBBBBB110 | 7 EACH | $15,000 | $24,750 | $25,500 | $24,750 | $24,750 | $22,000 | $22,000 |
| 625E15000 LIGHT TOWER FOUNDATION, 36" X 15' DEEP | 2 EACH | $6,000 | $7,600 | $7,900 | $7,600 | $7,600 | $8,700 | $8,700 |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 3 EACH | $8,250 | $8,100 | $8,400 | $8,100 | $8,100 | $9,450 | $9,450 |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 14 EACH | $9,000 | $8,700 | $8,900 | $8,700 | $8,700 | $10,500 | $10,500 |
| 625E20000 PORTABLE WINCH DRIVE POWER UNIT | 1 EACH | $3,000 | $3,400 | $3,500 | $3,400 | $3,400 | $2,250 | $2,250 |
| 625E21400 LIGHT TOWER MAINTENANCE PLATFORM, MISC. PLATFORM R | 4 EACH | $500 | $750 | $790 | $750 | $750 | $1,400 | $1,400 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 3,849 FT | $2.70 | $3.00 | $3.00 | $3.00 | $3.00 | $3.35 | $3.35 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 540 FT | $3.50 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 7,366 FT | $5.00 | $6.70 | $7.00 | $6.70 | $6.70 | $9.25 | $9.25 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 3,116 FT | $8.00 | $8.70 | $9.00 | $8.70 | $8.70 | $11.00 | $11.00 |
| 625E25500 CONDUIT, 3", 725.04 | 819 FT | $2.00 | $40.00 | $42.00 | $40.00 | $40.00 | $31.50 | $31.50 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 129 FT | $45.00 | $65.00 | $68.00 | $65.00 | $65.00 | $48.00 | $48.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 123 FT | $3.00 | $2.00 | $2.00 | $2.00 | $2.00 | $1.00 | $1.00 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 30 EACH | $750 | $1,000 | $1,000 | $1,000 | $1,000 | $1,275 | $1,275 |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL | 11 EACH | $950 | $700 | $740 | $700 | $700 | $635 | $635 |
| 625E27561 LUMINAIRE, INSTALLATION ONLY, AS PER PLAN | 74 EACH | $150 | $200 | $211 | $200 | $200 | $95.00 | $95.00 |
| 625E29002 TRENCH, 24" DEEP | 11,063 FT | $12.00 | $6.00 | $6.00 | $6.00 | $6.00 | $8.75 | $8.75 |
| 625E30700 PULL BOX, 725.08, 18" | 32 EACH | $800 | $1,000 | $1,000 | $1,000 | $1,000 | $850 | $850 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,100 | $1,200 | $1,250 | $1,200 | $1,200 | $1,035 | $1,035 |
| 625E31510 PULL BOX REMOVED | 19 EACH | $250 | $100 | $105 | $100 | $100 | $200 | $200 |
| 625E32000 GROUND ROD | 39 EACH | $350 | $225 | $235 | $225 | $225 | $110 | $110 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $3,500 | $6,000 | $6,300 | $6,000 | $6,000 | $2,475 | $2,475 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $5,250 | $8,000 | $8,400 | $8,000 | $8,000 | $10,700 | $7,700 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 11,063 FT | $0.25 | $2.00 | $2.00 | $2.00 | $2.00 | $0.60 | $0.60 |
| 625E37100 SERVICE TO UNDERPASS LIGHTING | 4 EACH | $3,500 | $6,500 | $6,800 | $6,500 | $6,500 | $7,000 | $7,000 |
| 625E39520 PULL BOX CLEANED | 1 EACH | $250 | $150 | $158 | $150 | $150 | $50.00 | $50.00 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $30,000 | $15,000 | $10,000 | $15,000 | $15,000 | $48,750 | $45,000 |
| 625E75350 LIGHT TOWER REMOVED | 16 EACH | $1,500 | $1,000 | $1,000 | $1,000 | $1,000 | $1,700 | $1,700 |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 2 EACH | $300 | $500 | $520 | $500 | $500 | $575 | $575 |
| 625E75504 LUMINAIRE REMOVED FOR STORAGE | 8 EACH | $45.00 | $100 | $105 | $100 | $100 | $70.00 | $70.00 |
| 625E75506 LUMINAIRE REMOVED | 4 EACH | $70.00 | $25.00 | $26.00 | $25.00 | $25.00 | $50.00 | $50.00 |
| 625E75508 LUMINAIRE REMOVED FOR REUSE | 74 EACH | $50.00 | $200 | $210 | $200 | $200 | $60.00 | $60.00 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $700 | $500 | $528 | $500 | $500 | $800 | $800 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 9 EACH | $750 | $500 | $528 | $500 | $500 | $360 | $360 |
| 625E75550 DISTRIBUTION CABLE REMOVED | 595 FT | $0.25 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'CH') | 1 EACH | $1,500 | $700 | $740 | $700 | $700 | $3,500 | $1,600 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'WO') | 1 EACH | $1,500 | $700 | $740 | $700 | $700 | $3,500 | $1,600 |
| 625E12010 LIGHT TOWER, BBB90 | 1 EACH | $10,000 | $19,500 | $20,000 | $19,500 | $19,500 | $18,000 | $18,000 |
| 625E13101 LIGHT TOWER, BBBB90, AS PER PLAN | 1 EACH | $15,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,750 | $20,750 |
| 625E34001 POWER SERVICE, AS PER PLAN (120V) | 1 EACH | $8,000 | $4,000 | $4,200 | $4,000 | $4,000 | $3,800 | $3,800 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-'FAA') | 1 EACH | $5,000 | $750 | $790 | $750 | $750 | $1,600 | $1,600 |
| 625E98000 LIGHTING, MISC.: FAA TYPE L-810 OBSTRUCTION LIGHTI | 1 EACH | $7,500 | $1,750 | $1,580 | $1,750 | $1,750 | $1,550 | $1,550 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $2,500 | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 |
| 632E89500 PEDESTAL, 3' | 1 EACH | $1,500 | $750 | $790 | $750 | $750 | $650 | $650 |
| 201E99000 SPECIAL - CLEARING AND GRUBBING | 1 LS | $5,000 | $12,500 | $16,000 | $15,300 | $15,000 | $13,279 | $20,000 |
| 621E00100 RPM | 1,286 EACH | $25.00 | $29.45 | $31.00 | $29.45 | $29.50 | $29.45 | $29.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,286 EACH | $3.00 | $1.00 | $7.00 | $5.00 | $11.00 | $4.00 | $12.00 |
| 625E32000 GROUND ROD | 19 EACH | $280 | $295 | $330 | $315 | $315 | $315 | $110 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 4 EACH | $6.00 | $8.60 | $8.00 | $7.50 | $7.50 | $7.50 | $7.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 266 EACH | $6.00 | $8.00 | $8.00 | $7.50 | $7.50 | $7.50 | $7.50 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 6 EACH | $7.00 | $9.50 | $10.00 | $8.90 | $8.90 | $8.90 | $8.90 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, ONE-WAY | 450 EACH | $7.00 | $8.50 | $9.00 | $8.50 | $8.50 | $8.50 | $8.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 266.3 FT | $8.00 | $10.00 | $10.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,923.1 FT | $9.00 | $12.00 | $12.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 219 FT | $11.00 | $13.00 | $14.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 144.6 FT | $24.00 | $27.00 | $30.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 364.9 FT | $24.00 | $30.00 | $30.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 96.2 FT | $46.00 | $48.00 | $53.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 126.7 FT | $30.00 | $35.00 | $37.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 630E08600 SIGN POST REFLECTOR | 54 EACH | $45.00 | $50.00 | $47.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 38 EACH | $320 | $385 | $365 | $345 | $345 | $345 | $345 |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $14,000 | $20,700 | $21,000 | $19,850 | $19,850 | $19,850 | $19,850 |
| 630E72330 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10 | 1 EACH | $22,000 | $29,600 | $30,000 | $28,475 | $28,475 | $28,475 | $28,475 |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 2 EACH | $22,000 | $34,550 | $35,000 | $33,150 | $33,150 | $33,150 | $33,150 |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 1 EACH | $36,000 | $57,250 | $59,000 | $55,600 | $55,600 | $55,600 | $55,600 |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 3 EACH | $56,000 | $84,500 | $86,000 | $81,550 | $81,550 | $81,550 | $81,550 |
| 630E72430 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 3 | 3 EACH | $75,000 | $114,250 | $119,000 | $112,400 | $112,400 | $112,400 | $112,400 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 62 EACH | $402 | $550 | $523 | $495 | $495 | $495 | $495 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 11 EACH | $150 | $150 | $175 | $165 | $165 | $165 | $165 |
| 630E79611 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, AS PER PLA | 12 EACH | $510 | $720 | $600 | $565 | $565 | $565 | $565 |
| 630E80100 SIGN, FLAT SHEET | 1,313.8 SF | $10.00 | $15.00 | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 48 SF | $12.00 | $18.00 | $20.00 | $18.50 | $18.50 | $18.50 | $18.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 924.5 SF | $14.00 | $20.00 | $21.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 8,681 SF | $15.00 | $22.50 | $22.00 | $20.70 | $20.70 | $20.70 | $20.70 |
| 630E80401 SIGN, PERMANENT OVERLAY, AS PER PLAN | 222 SF | $15.00 | $23.00 | $18.00 | $17.50 | $17.50 | $17.50 | $17.50 |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 5 EACH | $6,800 | $8,875 | $12,000 | $12,050 | $12,310 | $11,500 | $12,050 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 38 EACH | $700 | $845 | $760 | $720 | $720 | $720 | $720 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 14 EACH | $4,600 | $5,975 | $6,200 | $5,850 | $5,850 | $5,850 | $5,850 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 139 EACH | $13.00 | $15.00 | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $62.00 | $75.00 | $70.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 19 EACH | $212 | $345 | $233 | $220 | $220 | $220 | $220 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 2 EACH | $462 | $645 | $512 | $485 | $485 | $485 | $485 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 166 EACH | $14.00 | $20.00 | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 30 EACH | $210 | $285 | $254 | $240 | $240 | $240 | $240 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 8 EACH | $162 | $220 | $195 | $185 | $185 | $185 | $185 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 3 EACH | $312 | $440 | $343 | $325 | $325 | $325 | $325 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 58 EACH | $168 | $320 | $185 | $175 | $175 | $175 | $175 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 6 EACH | $32.00 | $30.00 | $37.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 6 EACH | $1,200 | $1,550 | $1,600 | $1,575 | $1,575 | $1,575 | $1,575 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 5 EACH | $2,600 | $3,875 | $4,000 | $3,750 | $3,750 | $3,750 | $3,750 |
| 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM, BAR | 5 EACH | $60.00 | $75.00 | $70.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM, BEA | 16 EACH | $230 | $270 | $260 | $245 | $245 | $245 | $245 |
| 644E00100 EDGE LINE, 4" | 0.13 MILE | $14,000 | $16,220 | $17,000 | $16,220 | $16,220 | $16,220 | $16,220 |
| 644E00300 CENTER LINE | 0.07 MILE | $16,000 | $17,780 | $19,000 | $17,780 | $17,780 | $17,780 | $17,780 |
| 646E10620 CHEVRON MARKING | 765 FT | $6.50 | $8.50 | $9.00 | $8.50 | $8.50 | $8.50 | $8.50 |
| 646E20350 LANE REDUCTION ARROW | 4 EACH | $360 | $400 | $423 | $400 | $400 | $400 | $400 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 24.28 MILE | $2,900 | $3,915 | $4,100 | $3,915 | $3,915 | $3,915 | $3,915 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 24.7 MILE | $2,100 | $2,965 | $3,100 | $2,965 | $2,965 | $2,965 | $2,965 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 22,788 FT | $2.30 | $2.75 | $3.00 | $2.75 | $2.75 | $2.75 | $2.75 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 11,942 FT | $2.00 | $2.50 | $3.00 | $2.50 | $2.50 | $2.50 | $2.50 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,000 | $2,620 | $2,800 | $2,620 | $2,620 | $2,620 | $2,620 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.30 | $1.50 | $2.00 | $1.50 | $1.50 | $1.50 | $1.50 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.30 | $1.75 | $2.00 | $1.75 | $1.75 | $1.75 | $1.75 |
| 625E25600 CONDUIT, 4", 725.04 | 260 FT | $35.00 | $50.00 | $50.00 | $50.00 | $50.00 | $40.00 | $40.00 |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, HDPE | 14,339 FT | $6.45 | $7.50 | $7.00 | $7.50 | $7.50 | $15.00 | $26.00 |
| 625E25901 CONDUIT, JACKED OR DRILLED, AS PER PLAN, 4" | 886 FT | $25.00 | $40.00 | $42.00 | $40.00 | $40.00 | $59.00 | $59.00 |
| 625E29000 TRENCH | 3,128 FT | $12.00 | $8.50 | $8.00 | $8.50 | $8.50 | $8.75 | $8.75 |
| 625E29931 MEDIAN JUNCTION BOX, AS PER PLAN | 16 EACH | $1,400 | $1,500 | $3,500 | $5,500 | $1,500 | $2,900 | $4,200 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $550 | $1,000 | $1,000 | $1,000 | $1,000 | $850 | $850 |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 18 EACH | $1,100 | $2,800 | $2,800 | $2,800 | $2,800 | $2,500 | $2,500 |
| 625E32000 GROUND ROD | 8 EACH | $150 | $250 | $260 | $250 | $250 | $110 | $110 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $8,500 | $6,000 | $6,300 | $6,000 | $6,000 | $1,000 | $1,000 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 3,128 FT | $0.50 | $2.00 | $2.00 | $2.00 | $2.00 | $0.60 | $0.60 |
| 630E70001 OVERHEAD SIGN SUPPORT, DMS TRUSS, 80', AS PER PLAN | 1 EACH | $21,000 | $23,250 | $22,000 | $21,350 | $21,350 | $21,350 | $21,350 |
| 630E70070 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $9,000 | $9,450 | $13,000 | $12,350 | $12,600 | $23,500 | $12,350 |
| 630E70080 OVERHEAD SIGN SUPPORT FOUNDATION, DMS TRUSS | 1 EACH | $7,500 | $7,800 | $8,300 | $11,850 | $7,850 | $7,850 | $7,850 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 4 EACH | $600 | $650 | $660 | $625 | $625 | $625 | $625 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 1 EACH | $2,500 | $2,850 | $2,900 | $2,720 | $2,720 | $2,720 | $2,720 |
| 632E67400 POWER CABLE, 4 CONDUCTOR, NO. 8 AWG | 696 FT | $8.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $3,300 | $3,500 | $3,600 | $3,500 | $3,500 | $2,650 | $2,650 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $800 | $1,000 | $1,100 | $1,000 | $1,000 | $1,400 | $1,400 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $850 | $1,500 | $1,600 | $1,500 | $1,500 | $1,800 | $1,800 |
| 809E61002 CCTV CONCRETE POLE, 70 FEET | 1 EACH | $30,000 | $35,000 | $32,000 | $35,000 | $35,000 | $34,839 | $28,589 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 438 FT | $3.00 | $4.00 | $3.00 | $4.00 | $4.00 | $3.50 | $3.50 |
| 809E65040 ITS CABINET - DMS | 1 EACH | $9,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 809E65990 ITS DEVICE, MISC.: REMOVAL OF EXISTING ITS INSTALL | 1 EACH | $4,000 | $6,500 | $5,000 | $6,500 | $6,500 | $8,500 | $8,500 |
| 809E65990 ITS DEVICE, MISC.: REUSE OF EXISTING ITS EQUIPMENT | 1 EACH | $4,000 | $10,000 | $10,000 | $10,000 | $10,000 | $15,500 | $15,500 |
| 606E10920 SPECIAL - NOISE BARRIER (REFLECTIVE), INFINITY WAL | 5,376 SF | $17.00 | $23.00 | $26.50 | $23.60 | $23.50 | $30.00 | $20.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 450 FT | $10.00 | $12.00 | $20.00 | $40.00 | $24.00 | $17.00 | $25.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,674 FT | $5.00 | $8.00 | $16.00 | $6.00 | $10.00 | $14.00 | $16.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $500 | $600 | $640 | $700 | $600 | $500 | $800 |
| 202E58100 CATCH BASIN REMOVED | 13 EACH | $100 | $150 | $400 | $550 | $550 | $525 | $365 |
| 202E58400 INLET ABANDONED | 1 EACH | $100 | $375 | $1,500 | $1,000 | $1,000 | $700 | $600 |
| 202E58500 CATCH BASIN ABANDONED | 3 EACH | $100 | $400 | $960 | $1,000 | $800 | $650 | $300 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 8 FT | $20.00 | $15.00 | $132 | $75.00 | $50.00 | $60.00 | $130 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 18" | 135 FT | $15.00 | $12.00 | $26.00 | $38.63 | $18.00 | $18.00 | $45.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 505 SY | $5.00 | $8.00 | $9.00 | $21.80 | $7.00 | $15.00 | $7.00 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 110 CY | $110 | $195 | $291 | $110 | $205 | $270 | $250 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 650 CY | $50.00 | $85.00 | $84.00 | $25.00 | $90.50 | $100 | $30.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 21 CY | $210 | $300 | $235 | $550 | $200 | $375 | $200 |
| 611E04400 12" CONDUIT, TYPE B | 584 FT | $70.00 | $50.00 | $47.00 | $45.00 | $55.00 | $60.00 | $50.00 |
| 611E04600 12" CONDUIT, TYPE C | 741 FT | $54.00 | $40.00 | $47.00 | $29.32 | $55.00 | $50.00 | $52.00 |
| 611E05900 15" CONDUIT, TYPE B | 28 FT | $75.00 | $72.00 | $72.00 | $65.00 | $70.00 | $90.00 | $50.00 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN, 706.02 | 10 FT | $200 | $155 | $180 | $190 | $210 | $220 | $165 |
| 611E06100 15" CONDUIT, TYPE C | 74 FT | $58.00 | $58.00 | $55.00 | $46.00 | $78.00 | $80.00 | $66.00 |
| 611E06100 15" CONDUIT, TYPE C, 706.02 | 10 FT | $200 | $148 | $190 | $190 | $200 | $230 | $100 |
| 611E07400 18" CONDUIT, TYPE B | 162 FT | $72.00 | $62.00 | $64.00 | $62.00 | $70.00 | $85.00 | $67.00 |
| 611E07600 18" CONDUIT, TYPE C | 218 FT | $58.00 | $50.00 | $61.00 | $35.00 | $78.00 | $60.00 | $65.00 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,200 | $2,000 | $2,600 | $2,325 | $2,500 | $3,100 | $2,180 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $2,600 | $3,800 | $3,300 | $3,050 | $3,600 | $3,700 | $2,700 |
| 611E98470 CATCH BASIN, NO. 2-2B | 14 EACH | $1,500 | $1,575 | $2,200 | $2,000 | $1,400 | $1,700 | $1,700 |
| 611E99101 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, AS | 1 EACH | $6,200 | $5,650 | $11,000 | $11,155 | $12,000 | $10,500 | $7,200 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,000 | $3,800 | $3,600 | $3,000 | $3,000 | $3,500 | $2,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 850 HOUR | $65.00 | $75.00 | $70.00 | $65.00 | $74.00 | $75.00 | $70.00 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $40,000 | $40,000 | $42,000 | $40,000 | $40,000 | $26,900 | $21,700 |
| 614E11630 INCREASED BARRIER DELINEATION | 178,215 FT | $0.15 | $1.50 | $0.25 | $1.00 | $1.00 | $0.30 | $1.10 |
| 614E12381 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $1,885 | $2,000 | $1,815 | $1,815 | $3,800 | $1,850 |
| 614E12420 DETOUR SIGNING | 1 LS | $70,000 | $70,000 | $72,000 | $67,407 | $67,407 | $155,000 | $67,407 |
| 614E12470 WORK ZONE SPEED LIMIT SIGN | 18 EACH | $120 | $118 | $125 | $120 | $117 | $370 | $117 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 13 EACH | $120 | $118 | $124 | $120 | $117 | $350 | $117 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $35,000 | $27,500 | $30,000 | $27,500 | $27,500 | $36,000 | $36,000 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 6,416 EACH | $24.00 | $24.10 | $25.00 | $24.10 | $24.75 | $35.00 | $27.00 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 100 CY | $165 | $200 | $325 | $150 | $300 | $400 | $400 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY | 3,133 EACH | $3.00 | $6.25 | $7.00 | $10.00 | $10.00 | $5.50 | $10.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 233 EACH | $5.50 | $7.50 | $9.00 | $10.00 | $10.00 | $6.50 | $10.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, 1 WAY | 240 EACH | $5.50 | $11.50 | $12.00 | $10.00 | $11.00 | $12.00 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 3,606 EACH | $7.00 | $15.00 | $14.00 | $10.00 | $14.00 | $15.00 | $12.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: BRIDGE DECK AND PAVEME | 100,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: WORK ZONE RAISED PAVEM | 150 EACH | $11.00 | $12.00 | $12.00 | $12.00 | $11.13 | $5.00 | $11.00 |
| 614E18030 MAINTAINING TRAFFIC, MISC.: "SNAP" MILL AND FILL | 20,000 FT | $4.00 | $3.50 | $3.00 | $4.00 | $3.15 | $6.00 | $3.15 |
| 614E18030 MAINTAINING TRAFFIC, MISC.: RUMBLE STRIPS | 2,880 FT | $0.35 | $12.75 | $11.00 | $12.50 | $3.50 | $12.51 | $5.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 144 SNMT | $460 | $500 | $800 | $400 | $579 | $550 | $1,200 |
| 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN | 28.4 MILE | $560 | $1,750 | $1,900 | $1,750 | $1,750 | $1,750 | $1,750 |
| 614E20410 WORK ZONE LANE LINE, CLASS II, 6" | 24 MILE | $370 | $635 | $671 | $635 | $635 | $635 | $635 |
| 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN | 80.4 MILE | $640 | $2,650 | $2,800 | $2,650 | $2,650 | $2,650 | $2,650 |
| 614E23011 WORK ZONE CHANNELIZING LINE, CLASS I, 12", AS PER | 112,684 FT | $0.52 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN | 43,361 FT | $0.52 | $1.75 | $2.00 | $1.75 | $1.75 | $1.75 | $1.75 |
| 614E28000 WORK ZONE GORE MARKING, CLASS II | 25,500 FT | $2.80 | $0.75 | $1.00 | $0.75 | $0.75 | $0.75 | $0.75 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $150,000 | $200,000 | $170,000 | $255,000 | $245,000 | $140,000 | $650,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 12,728 SY | $38.00 | $40.00 | $45.00 | $50.00 | $58.44 | $60.00 | $60.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,000 SY | $18.00 | $38.00 | $35.00 | $60.85 | $63.00 | $60.00 | $60.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,000 SY | $18.00 | $38.00 | $35.00 | $32.95 | $57.00 | $45.00 | $30.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,000 SY | $26.00 | $50.00 | $40.00 | $65.25 | $88.00 | $95.00 | $65.00 |
| 616E10000 WATER | 1,400 MGAL | $1.00 | $5.00 | $40.00 | $5.00 | $64.00 | $75.00 | $45.00 |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 450 FT | $100 | $140 | $92.00 | $100 | $100 | $115 | $130 |
| 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $4,000 | $4,500 | $3,452 | $5,500 | $5,800 | $3,200 | $3,350 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 11,670 FT | $10.00 | $11.25 | $10.00 | $22.20 | $11.80 | $7.00 | $15.00 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 6 EACH | $500 | $2,000 | $1,300 | $395 | $650 | $1,400 | $600 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 600 FT | $20.00 | $14.00 | $21.00 | $48.50 | $13.50 | $26.00 | $20.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,443 SF | $28.00 | $43.50 | $45.00 | $41.60 | $41.60 | $41.60 | $42.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 2,344 SF | $32.00 | $44.00 | $45.00 | $42.30 | $42.30 | $42.30 | $43.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 288 SNMT | $250 | $650 | $230 | $650 | $288 | $400 | $650 |
| 503E21100 UNCLASSIFIED EXCAVATION | 651 CY | $35.00 | $130 | $55.00 | $95.00 | $60.00 | $29.00 | $63.00 |
| 503E31100 ROCK EXCAVATION | 13 CY | $45.00 | $170 | $112 | $175 | $92.00 | $138 | $308 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 43,590 LB | $1.30 | $1.50 | $1.46 | $1.50 | $1.29 | $1.20 | $1.48 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 8,703 FT | $1.32 | $2.00 | $1.48 | $1.70 | $1.52 | $0.90 | $1.75 |
| 511E45600 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE | 62 CY | $670 | $600 | $630 | $800 | $875 | $785 | $900 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 205 CY | $400 | $685 | $770 | $775 | $850 | $805 | $960 |
| 511E46513 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, AS PER PLA | 155 CY | $405 | $390 | $419 | $600 | $550 | $400 | $380 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 410 SY | $18.50 | $23.00 | $10.00 | $25.00 | $22.00 | $24.00 | $23.00 |
| 512E33000 TYPE 2 WATERPROOFING | 40 SY | $30.00 | $74.00 | $45.00 | $25.00 | $46.00 | $48.00 | $32.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 78 SF | $10.00 | $10.00 | $1.00 | $6.50 | $12.00 | $10.00 | $7.00 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 167 CY | $60.00 | $72.00 | $65.00 | $70.00 | $58.00 | $78.00 | $43.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 13,478 LB | $1.30 | $1.50 | $1.45 | $1.50 | $1.35 | $1.40 | $1.49 |
| 509E30030 NO. 5 GFRP DEFORMED BARS | 669 FT | $1.57 | $2.50 | $2.00 | $1.80 | $1.60 | $1.40 | $4.00 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 1,925 FT | $1.86 | $2.50 | $2.00 | $2.15 | $1.90 | $1.70 | $4.50 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: PARAPET INCLUDING MOMEN | 90 CY | $540 | $430 | $530 | $600 | $550 | $475 | $510 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 412 SY | $18.50 | $23.00 | $36.00 | $25.00 | $22.00 | $25.00 | $23.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 322 SF | $12.00 | $5.00 | $5.00 | $9.00 | $16.00 | $10.00 | $8.00 |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 3,640 SF | $30.00 | $33.00 | $22.00 | $50.00 | $30.00 | $27.00 | $38.83 |
| 840E21000 WALL EXCAVATION | 2,321 CY | $25.00 | $28.50 | $20.00 | $25.00 | $13.00 | $22.00 | $40.00 |
| 840E22000 FOUNDATION PREPARATION | 442 SY | $22.00 | $25.00 | $23.00 | $10.00 | $40.00 | $36.00 | $28.00 |
| 840E23000 SELECT GRANULAR BACKFILL | 1,896 CY | $52.00 | $62.00 | $73.00 | $60.00 | $48.00 | $48.00 | $52.00 |
| 840E23050 NATURAL SOIL | 37 CY | $20.00 | $80.00 | $33.00 | $32.00 | $30.00 | $14.00 | $35.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 500 FT | $10.00 | $8.00 | $2.00 | $15.00 | $12.00 | $11.00 | $9.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 20 FT | $70.00 | $20.00 | $20.00 | $10.00 | $26.00 | $15.00 | $10.00 |
| 840E26000 CONCRETE COPING | 263 FT | $100 | $104 | $125 | $135 | $120 | $165 | $90.00 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $450 | $500 | $200 | $500 | $680 | $295 | $400 |
| 840E28000 SGB INSPECTION AND COMPACTION TESTING | 1 LS | $12,000 | $12,000 | $5,000 | $30,000 | $5,000 | $4,500 | $5,000 |
| 601E21000 CONCRETE SLOPE PROTECTION | 14 SY | $120 | $130 | $230 | $200 | $100 | $185 | $190 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $161,000 | $100,000 | $125,000 | $250,000 | $130,000 | $200,000 |
| 202E22900 APPROACH SLAB REMOVED | 400 SY | $25.00 | $46.00 | $40.00 | $25.00 | $43.00 | $28.00 | $35.00 |
| 202E23500 WEARING COURSE REMOVED | 400 SY | $5.00 | $8.00 | $11.00 | $11.00 | $6.00 | $1.50 | $7.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $55,000 | $76,500 | $50,000 | $115,000 | $50,000 | $40,000 | $180,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 278 CY | $50.00 | $172 | $305 | $100 | $245 | $80.00 | $300 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $7,500 | $18,000 | $45,000 | $15,000 | $27,000 | $8,000 | $30,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 2,770 FT | $20.00 | $24.00 | $14.00 | $37.00 | $20.00 | $18.00 | $21.50 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 2,990 FT | $44.00 | $46.00 | $75.00 | $40.00 | $55.00 | $55.00 | $50.18 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 130,236 LB | $1.15 | $1.50 | $1.51 | $1.30 | $1.34 | $1.20 | $1.30 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.30 | $4.50 | $3.00 | $5.00 | $5.20 | $3.00 | $2.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 4,171 FT | $1.57 | $2.00 | $1.57 | $1.70 | $1.53 | $0.90 | $4.00 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 3,310 FT | $1.86 | $2.50 | $2.32 | $2.15 | $2.06 | $1.50 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 282 EACH | $25.00 | $25.00 | $22.00 | $22.00 | $29.00 | $17.50 | $28.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 368 CY | $690 | $705 | $615 | $650 | $875 | $875 | $1,000 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 115 CY | $645 | $800 | $650 | $650 | $740 | $575 | $960 |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 70 CY | $700 | $760 | $900 | $1,100 | $1,565 | $1,400 | $1,520 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 32 CY | $550 | $545 | $875 | $700 | $1,050 | $1,100 | $890 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 81 CY | $500 | $400 | $500 | $500 | $505 | $625 | $645 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,217 SY | $18.50 | $28.00 | $22.00 | $23.00 | $21.00 | $18.00 | $23.00 |
| 512E33000 TYPE 2 WATERPROOFING | 10 SY | $30.00 | $40.00 | $45.00 | $20.00 | $28.00 | $55.00 | $32.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 50 SF | $12.00 | $5.00 | $9.00 | $6.50 | $15.00 | $10.00 | $10.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 37 SF | $12.00 | $7.00 | $13.00 | $8.00 | $17.00 | $12.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 125 CY | $65.00 | $120 | $95.00 | $90.00 | $100 | $100 | $72.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 360 FT | $12.00 | $6.00 | $11.00 | $15.00 | $12.00 | $9.00 | $14.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $35.00 | $20.00 | $25.00 | $15.00 | $29.00 | $17.00 | $14.00 |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 2,199 SF | $25.00 | $32.00 | $25.00 | $30.00 | $25.00 | $27.00 | $27.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 90 SF | $95.00 | $140 | $245 | $100 | $95.00 | $115 | $95.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $3,000 | $6,500 | $6,000 | $4,200 | $2,800 | $3,500 | $4,500 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 879 SY | $300 | $280 | $200 | $280 | $300 | $270 | $200 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 325 FT | $130 | $128 | $150 | $95.00 | $200 | $190 | $150 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 136 CF | $360 | $355 | $370 | $405 | $360 | $425 | $360 |
| 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 1,220 SY | $114 | $46.00 | $50.00 | $90.00 | $78.00 | $85.00 | $189 |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 1,197 SY | $95.00 | $74.00 | $90.00 | $85.00 | $83.00 | $62.00 | $163 |
| 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 60 CY | $300 | $220 | $150 | $400 | $195 | $185 | $516 |
| 848E50000 HAND CHIPPING | 12 SY | $125 | $840 | $60.00 | $260 | $320 | $400 | $215 |
| 848E50100 TEST SLAB | 1 LS | $850 | $1,000 | $2,500 | $2,000 | $1,800 | $4,100 | $1,462 |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $300 | $1,800 | $500 | $4,000 | $195 | $2,500 | $516 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 1,220 SY | $10.00 | $21.00 | $9.00 | $10.00 | $7.50 | $1.50 | $17.19 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 473 SY | $35.00 | $20.00 | $25.00 | $30.00 | $23.00 | $12.00 | $10.00 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $120,000 | $320,000 | $200,000 | $225,000 | $400,000 | $160,000 | $200,000 |
| 202E22900 APPROACH SLAB REMOVED | 400 SY | $25.00 | $63.00 | $45.00 | $25.00 | $43.00 | $32.00 | $40.00 |
| 202E23500 WEARING COURSE REMOVED | 2,450 SY | $5.00 | $3.40 | $9.00 | $9.00 | $6.00 | $1.50 | $7.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $110,000 | $181,500 | $175,000 | $245,000 | $185,000 | $180,000 | $275,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 421 CY | $65.00 | $160 | $165 | $120 | $210 | $100 | $135 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $7,500 | $54,000 | $30,000 | $15,000 | $27,000 | $8,000 | $25,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 2,740 FT | $20.00 | $24.00 | $15.00 | $32.00 | $20.00 | $18.00 | $19.92 |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 3,000 FT | $44.00 | $57.00 | $80.00 | $45.00 | $55.00 | $55.00 | $46.23 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 293,392 LB | $1.22 | $1.50 | $1.81 | $1.35 | $1.47 | $1.35 | $1.37 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 6,400 FT | $1.32 | $2.00 | $1.57 | $1.70 | $1.52 | $1.00 | $4.00 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 5,020 FT | $1.86 | $2.40 | $2.32 | $2.15 | $2.06 | $1.50 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 170 EACH | $25.00 | $17.00 | $30.00 | $20.00 | $29.00 | $20.00 | $26.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 4 EACH | $4,000 | $3,800 | $3,400 | $1,700 | $4,500 | $2,750 | $2,100 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 151 CY | $560 | $770 | $600 | $700 | $620 | $525 | $635 |
| 511E40512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 141 CY | $770 | $500 | $590 | $725 | $650 | $825 | $835 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 67 CY | $700 | $510 | $630 | $550 | $750 | $650 | $710 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 135 CY | $500 | $440 | $400 | $400 | $370 | $440 | $395 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,998 SY | $18.50 | $18.00 | $22.00 | $23.00 | $21.00 | $18.00 | $23.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 10 FT | $100 | $100 | $100 | $120 | $100 | $100 | $100 |
| 512E33000 TYPE 2 WATERPROOFING | 19 SY | $40.00 | $20.00 | $50.00 | $20.00 | $30.00 | $50.00 | $32.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 13,050 EACH | $4.70 | $5.00 | $4.60 | $3.50 | $4.75 | $5.00 | $4.70 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 753 SF | $60.00 | $72.00 | $30.00 | $155 | $60.00 | $60.00 | $150 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 753 SF | $10.00 | $25.00 | $6.00 | $75.00 | $10.00 | $10.00 | $75.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 13,757 SF | $4.60 | $7.00 | $2.00 | $9.40 | $5.00 | $5.00 | $9.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 13,757 SF | $4.60 | $4.00 | $2.00 | $4.95 | $5.00 | $5.00 | $4.75 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 3 MNHR | $100 | $40.00 | $1.00 | $260 | $100 | $100 | $250 |
| 514E10000 FINAL INSPECTION REPAIR | 13 EACH | $100 | $150 | $200 | $1.00 | $100 | $100 | $1.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 318 FT | $45.00 | $40.00 | $45.00 | $45.00 | $63.90 | $50.00 | $50.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 41 SF | $10.00 | $5.00 | $8.00 | $6.50 | $15.00 | $12.00 | $13.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 64 SF | $12.00 | $7.00 | $13.00 | $8.00 | $17.00 | $11.00 | $15.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 354 FT | $28.00 | $25.00 | $30.00 | $50.00 | $39.00 | $30.00 | $35.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $1,000 | $1,285 | $1,400 | $1,050 | $1,120 | $1,175 | $1,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $750 | $1,300 | $1,400 | $825 | $910 | $1,125 | $1,000 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $48,000 | $51,500 | $30,000 | $60,000 | $75,000 | $65,000 | $40,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 192 CY | $55.00 | $110 | $120 | $90.00 | $97.50 | $92.00 | $70.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 360 FT | $12.00 | $6.00 | $11.00 | $15.00 | $12.00 | $9.00 | $14.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 32 FT | $50.00 | $20.00 | $35.00 | $15.00 | $31.00 | $17.00 | $14.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 125 SF | $95.00 | $130 | $95.00 | $90.00 | $95.00 | $110 | $95.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $3,000 | $6,500 | $5,000 | $4,200 | $2,800 | $3,350 | $4,500 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 880 SY | $300 | $275 | $260 | $300 | $305 | $290 | $250 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 318 FT | $120 | $125 | $150 | $135 | $245 | $185 | $190 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 867 SY | $35.00 | $20.00 | $25.00 | $30.00 | $23.00 | $12.00 | $10.00 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $115,000 | $262,000 | $125,000 | $170,000 | $400,000 | $85,000 | $200,000 |
| 202E22900 APPROACH SLAB REMOVED | 156 SY | $25.00 | $65.00 | $45.00 | $28.00 | $42.00 | $25.00 | $40.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 502 CY | $55.00 | $170 | $150 | $45.00 | $130 | $90.00 | $95.00 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $7,500 | $18,000 | $30,000 | $15,000 | $10,000 | $5,000 | $20,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 400 FT | $34.00 | $26.00 | $75.00 | $25.00 | $45.00 | $40.00 | $39.11 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 350 FT | $21.00 | $24.00 | $14.00 | $30.00 | $20.00 | $18.00 | $24.77 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 223,559 LB | $1.20 | $1.55 | $1.65 | $1.41 | $1.40 | $1.05 | $1.30 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 12,353 FT | $1.32 | $2.00 | $1.57 | $1.70 | $1.52 | $0.70 | $4.00 |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 315 CY | $670 | $905 | $805 | $700 | $900 | $775 | $880 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 126 CY | $450 | $825 | $525 | $750 | $450 | $375 | $530 |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 94 CY | $625 | $525 | $675 | $650 | $950 | $825 | $760 |
| 511E45600 CLASS QC4 MASS CONCRETE, SUBSTRUCTURE (PIER COLUMN | 45 CY | $680 | $655 | $1,130 | $750 | $875 | $925 | $755 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 228 CY | $340 | $350 | $350 | $350 | $300 | $260 | $300 |
| 511E53016 CLASS QC4 CONCRETE, MISC.: INTEGRAL POST-TENSIONED | 79 CY | $1,200 | $1,100 | $1,200 | $650 | $950 | $750 | $1,300 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,213 SY | $18.50 | $30.00 | $22.00 | $23.00 | $21.00 | $20.00 | $23.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 5,001 EACH | $4.70 | $4.75 | $4.60 | $4.00 | $4.75 | $3.50 | $4.70 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 27,500 SF | $4.00 | $6.25 | $6.00 | $8.30 | $4.00 | $4.00 | $8.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 27,500 SF | $4.00 | $3.00 | $2.00 | $3.90 | $4.00 | $4.00 | $3.75 |
| 514E10000 FINAL INSPECTION REPAIR | 42 EACH | $100 | $150 | $200 | $1.00 | $100 | $100 | $1.00 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 29 FT | $45.00 | $43.00 | $45.00 | $52.00 | $60.00 | $60.00 | $50.00 |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 57 FT | $700 | $730 | $680 | $540 | $550 | $675 | $1,080 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 61 CY | $60.00 | $100 | $130 | $80.00 | $140 | $115 | $100 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 91 FT | $12.00 | $6.00 | $11.00 | $15.00 | $13.00 | $12.00 | $14.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 10 FT | $30.00 | $30.00 | $35.00 | $15.00 | $30.00 | $24.00 | $14.00 |
| 524E95445 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK WITH QC | 18 FT | $570 | $960 | $1,050 | $575 | $1,450 | $450 | $1,270 |
| 524E95453 DRILLED SHAFTS, 48" DIAMETER, ABOVE BEDROCK WITH Q | 34 FT | $375 | $1,040 | $525 | $690 | $410 | $450 | $450 |
| 524E95455 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK WITH QC | 56 FT | $560 | $640 | $725 | $690 | $2,000 | $375 | $1,600 |
| 524E95463 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK WITH Q | 218 FT | $520 | $615 | $525 | $740 | $250 | $375 | $470 |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 194 SY | $300 | $335 | $260 | $300 | $310 | $295 | $285 |
| 526E90010 TYPE A INSTALLATION | 26 FT | $130 | $136 | $210 | $230 | $340 | $210 | $350 |
| 526E90030 TYPE C INSTALLATION | 29 FT | $120 | $170 | $285 | $230 | $225 | $195 | $240 |
| 530E00200 SPECIAL - STRUCTURES: TEMPORARY SUPPORT OF STEEL G | 1 LS | $70,000 | $29,200 | $100,000 | $165,000 | $125,000 | $45,000 | $35,000 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 8 CF | $360 | $480 | $360 | $520 | $360 | $425 | $360 |
| 855E00010 POST-TENSIONING STRAND TENDON | 4,665 LB | $16.00 | $21.00 | $35.00 | $32.50 | $20.00 | $20.00 | $20.00 |
| 869E00101 HIGH LOAD MULTI-ROTATIONAL (HLMR) BEARINGS, AS PER | 8 EACH | $4,700 | $4,800 | $5,040 | $4,250 | $5,600 | $3,900 | $4,000 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $10,000 | $6,000 | $6,500 | $5,000 | $3,000 | $9,000 | $3,000 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $15,000 | $37,500 | $16,000 | $40,000 | $15,000 | $100 | $60,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 82 CY | $30.00 | $68.00 | $34.00 | $100 | $80.00 | $50.00 | $100 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,360 LB | $1.50 | $1.50 | $1.80 | $1.50 | $1.40 | $1.30 | $1.49 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 24 EACH | $25.00 | $15.00 | $21.00 | $30.00 | $40.00 | $33.00 | $28.00 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $900 | $1,100 | $2,400 | $1,400 | $2,000 | $2,100 | $1,175 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 18 CY | $800 | $425 | $750 | $500 | $910 | $650 | $375 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 23 SY | $50.00 | $124 | $11.00 | $23.00 | $25.00 | $26.00 | $75.00 |
| 512E33000 TYPE 2 WATERPROOFING | 48 SY | $25.00 | $30.00 | $42.00 | $20.00 | $40.00 | $48.00 | $34.95 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $12.00 | $4.00 | $3.00 | $6.50 | $15.00 | $11.00 | $7.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 8 CY | $100 | $120 | $310 | $200 | $215 | $150 | $98.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $325,000 | $400,000 | $320,000 | $300,000 | $505,000 | $218,000 | $250,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $15,000 | $20,000 | $8,000 | $50,000 | $5,000 | $5,000 | $35,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $1,450,000 | $1,500,000 | $1,450,000 | $780,000 | $1,460,000 | $1,185,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 36 MNTH | $2,200 | $4,000 | $1,000 | $4,500 | $3,700 | $5,900 | $3,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $140,000 | $475,000 | $755,000 | $600,000 | $200,000 | $400,000 | $250,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 317,540 SF | $24 | $7.62M | 15% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 63,962 CY | $97 | $6.20M | 12% |
| 304E20000 AGGREGATE BASE | 50,747 CY | $40 | $2.03M | 4% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,662 CY | $170 | $1.98M | 4% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 13,777 CY | $140 | $1.93M | 4% |
| 202E23000 PAVEMENT REMOVED | 233,574 SY | $7 | $1.64M | 3% |
| 513E10301 STRUCTURAL STEEL MEMBERS, LEVEL 5, AS PER PLAN | 658,400 LB | $2.2 | $1.45M | 3% |
| 624E10000 MOBILIZATION | 1 LS | $1,200,000 | $1.20M | 2% |
| 832E30000 EROSION CONTROL | 1,150,000 EACH | $1 | $1.15M | 2% |
| 203E10000 EXCAVATION | 171,865 CY | $6.5 | $1.12M | 2% |