SCI-SR 139-11.38
SCI County · est $2.0M
Bid dateThursday, April 29—
SCI County · est $2.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 100 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2D G M INC | R3Complete General Construction Company | R4Allard Excavation LLC | R5Armstrong Steel Erectors INC | R6Double Z Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E32212 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 250 CY | $970 | $955 | $850 | $773 | $1,099 | $1,100 | 16% |
| 515E15000 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $18,300 | $21,000 | $17,200 | $20,260 | $16,055 | $16,400 | 10% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 91,780 LB | $1.30 | $1.17 |
| Item | Quantity | R1George J Igel & CO INC | R2D G M INC | R3Complete General Construction Company | R4Allard Excavation LLC | R5Armstrong Steel Erectors INC | R6Double Z Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $30,000 | $30,000 | $7,700 | $22,950 | $30,000 |
| 202E38000 GUARDRAIL REMOVED | 701 FT | $3.00 | $1.00 | $2.00 | $3.60 | $2.80 | $2.80 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 6 EACH | $300 | $300 | $285 | $46.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.20 |
| $1.75 |
| $1.38 |
| $1.40 |
| 8% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $250,000 | $100,000 | $100,000 | 7% |
| 511E43212 CLASS QC1 CONCRETE WITH QC/QA, PIER | 70 CY | $1,150 | $605 | $850 | $1,528 | $461 | $1,200 | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $80,000 | $105,000 | $155,000 | $32,600 | $148,730 | $94,000 | 5% |
| 515E15000 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 4 EACH | $18,400 | $21,000 | $18,300 | $20,260 | $16,055 | $16,400 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 410 CY | $165 | $170 | $165 | $165 | $165 | $165 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $67,000 | $80,000 | $50,000 | $54,200 | $95,000 | $80,000 | 5% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 206 SY | $300 | $245 | $300 | $320 | $325 | $300 | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 785 SY | $75.00 | $70.00 | $80.00 | $62.15 | $59.01 | $85.00 | 4% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 71 CY | $800 | $495 | $700 | $1,061 | $747 | $725 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 326 FT | $174 | $170 | $175 | $181 | $189 | $195 | 4% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 995 CY | $53.00 | $45.00 | $60.00 | $44.75 | $58.44 | $46.00 | 4% |
| 524E94803 DRILLED SHAFTS, 42" DIAMETER, ABOVE BEDROCK, AS PE | 111 FT | $460 | $360 | $550 | $448 | $211 | $640 | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $43,000 | $102,000 | $50,000 | $131,000 | $157,458 | $166,000 | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 639 CY | $52.00 | $20.00 | $30.00 | $8.40 | $45.61 | $40.00 | 2% |
| 304E20000 AGGREGATE BASE | 514 CY | $60.00 | $65.00 | $80.00 | $54.15 | $74.95 | $80.00 | 2% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 53 CY | $570 | $455 | $550 | $718 | $471 | $465 | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (141 CY | $180 | $187 | $180 | $180 | $180 | $180 | 2% |
| $300 |
| $300 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $100 | $110 | $89.50 | $115 | $115 |
| 202E75000 FENCE REMOVED | 161 FT | $5.00 | $5.00 | $4.50 | $0.80 | $3.50 | $3.50 |
| 202E75250 GATE REMOVED | 1 EACH | $300 | $200 | $275 | $89.50 | $250 | $100 |
| 203E10000 EXCAVATION | 1,233 CY | $20.00 | $20.00 | $18.00 | $10.60 | $11.15 | $20.00 |
| 203E20000 EMBANKMENT | 831 CY | $15.00 | $20.00 | $20.00 | $8.75 | $16.35 | $12.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 21 CY | $26.00 | $30.00 | $60.00 | $20.00 | $28.29 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 3,076 SY | $5.00 | $2.50 | $3.00 | $2.25 | $11.66 | $2.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 962 CY | $14.00 | $15.00 | $30.00 | $13.00 | $11.43 | $18.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $80.00 | $70.00 | $110 | $105 | $1,375 | $200 |
| 204E51000 GEOGRID | 3,016 SY | $2.00 | $1.50 | $3.50 | $2.70 | $5.49 | $1.50 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 600 FT | $18.70 | $19.00 | $25.60 | $25.98 | $21.00 | $21.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 2 EACH | $1,085 | $1,100 | $1,000 | $1,340 | $1,340 | $1,500 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 4 EACH | $2,600 | $2,700 | $2,320 | $2,200 | $2,200 | $2,350 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $915 | $1,000 | $600 | $925 | $925 | $1,050 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,275 | $2,300 | $1,025 | $1,820 | $1,820 | $2,100 |
| 863E00100 GEOGRID, TYPE P1 | 2,337 SY | $3.00 | $2.50 | $4.00 | $2.75 | $5.99 | $1.75 |
| 601E10000 RIPRAP | 4 SY | $26.00 | $250 | $700 | $169 | $153 | $150 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 4 CY | $120 | $150 | $95.00 | $84.00 | $312 | $150 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 341 CY | $55.00 | $65.00 | $63.00 | $70.00 | $86.85 | $70.00 |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 30 CY | $70.00 | $70.00 | $72.00 | $70.00 | $107 | $100 |
| 659E00300 TOPSOIL | 107 CY | $12.00 | $12.00 | $35.00 | $20.00 | $62.67 | $55.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,739 SY | $3.00 | $2.50 | $0.94 | $5.50 | $1.40 | $6.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 137 SY | $1.40 | $0.05 | $0.84 | $5.50 | $1.40 | $1.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.37 TON | $610 | $650 | $668 | $500 | $610 | $610 |
| 659E31000 LIME | 0.57 ACRE | $80.00 | $80.00 | $153 | $100 | $80.00 | $80.00 |
| 659E35000 WATER | 15 MGAL | $1.00 | $1.00 | $1.00 | $9.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 965 SY | $2.00 | $2.50 | $1.33 | $3.00 | $2.00 | $2.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 274 SY | $2.00 | $2.50 | $1.68 | $2.00 | $2.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $2,000 | $1,600 | $1,595 | $1,250 | $1,595 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,800 | $6,000 | $4,200 | $7,000 | $11,100 | $6,516 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,500 | $13,500 | $13,400 | $13,400 | $13,397 | $14,000 |
| 832E30000 EROSION CONTROL | 17,012 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.27 CY | $7,300 | $1,500 | $6,000 | $8,750 | $6,076 | $8,000 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,531 FT | $7.00 | $10.00 | $15.00 | $10.27 | $12.00 | $9.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 40 FT | $25.00 | $20.00 | $38.00 | $15.00 | $30.00 | $18.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $14.50 | $8.00 | $18.00 | $16.00 | $25.00 | $11.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $7.00 | $7.00 | $17.00 | $16.00 | $20.00 | $8.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $7.00 | $6.00 | $20.00 | $16.00 | $20.00 | $8.00 |
| 611E06400 15" CONDUIT, TYPE D | 33 FT | $60.00 | $75.00 | $85.00 | $70.00 | $65.00 | $60.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $250 | $200 | $240 | $350 | $200 | $350 |
| 407E10000 TACK COAT | 347 GAL | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 41 CY | $85.00 | $100 | $120 | $62.00 | $117 | $115 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 101 CY | $215 | $225 | $215 | $215 | $215 | $215 |
| 621E00100 RPM | 42 EACH | $85.00 | $87.50 | $87.50 | $87.50 | $84.58 | $87.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 41 EACH | $12.00 | $1.00 | $10.00 | $7.00 | $30.00 | $11.01 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 21 EACH | $8.00 | $8.00 | $8.00 | $8.00 | $12.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 135.5 FT | $12.00 | $17.00 | $16.00 | $9.00 | $12.00 | $15.00 |
| 630E02101 GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN | 17 FT | $15.00 | $22.00 | $22.00 | $13.00 | $15.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 29 FT | $13.00 | $19.00 | $19.00 | $10.00 | $13.00 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $50.00 | $45.00 | $45.00 | $25.00 | $50.00 | $48.00 |
| 630E80100 SIGN, FLAT SHEET | 42 SF | $28.00 | $24.00 | $23.50 | $25.00 | $28.00 | $22.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 1 EACH | $105 | $225 | $185 | $250 | $105 | $225 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 13 EACH | $20.00 | $15.00 | $10.00 | $15.00 | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $65.00 | $65.00 | $65.00 | $50.00 | $65.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 13 EACH | $30.00 | $15.00 | $15.00 | $15.00 | $30.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.42 MILE | $2,458 | $3,000 | $2,695 | $2,695 | $2,458 | $2,695 |
| 642E00300 CENTER LINE, TYPE 1 | 0.24 MILE | $5,836 | $4,700 | $4,450 | $4,450 | $5,836 | $4,450 |
| 642E00500 STOP LINE, TYPE 1, 24" | 20 FT | $5.68 | $13.00 | $12.50 | $12.50 | $5.68 | $12.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $73.50 | $50.00 | $85.00 | $85.00 | $90.00 | $60.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,880 FT | $1.00 | $1.00 | $0.90 | $0.90 | $0.90 | $1.05 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,240 | $1,900 | $2,240 | $1,900 | $1,950 | $2,250 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,500 | $4,750 | $4,500 | $4,500 | $4,500 | $4,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 37 EACH | $12.00 | $22.00 | $22.00 | $22.00 | $22.00 | $9.95 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, (BIDIRECTIONAL) | 19 EACH | $10.00 | $28.00 | $28.00 | $28.00 | $28.00 | $7.20 |
| 614E13360 OBJECT MARKER, TWO WAY | 56 EACH | $23.00 | $22.00 | $24.00 | $24.00 | $24.00 | $20.16 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.73 MILE | $2,850 | $3,000 | $2,850 | $2,850 | $2,850 | $2,850 |
| 614E22300 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE II | 0.08 MILE | $10,560 | $11,000 | $10,560 | $10,560 | $6,700 | $10,560 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 48 FT | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 616E10000 WATER | 4.5 MGAL | $44.00 | $1.00 | $65.00 | $1.00 | $100 | $75.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 910 FT | $19.00 | $13.00 | $15.00 | $11.80 | $20.00 | $16.00 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 970 FT | $20.00 | $18.00 | $16.00 | $11.00 | $22.00 | $20.00 |
| 202E22900 APPROACH SLAB REMOVED | 129 SY | $30.00 | $50.00 | $50.00 | $17.70 | $44.21 | $40.00 |
| 202E23500 WEARING COURSE REMOVED | 582 SY | $7.00 | $6.00 | $11.00 | $2.00 | $14.06 | $7.00 |
| 503E31100 ROCK EXCAVATION | 128 CY | $90.00 | $25.00 | $60.00 | $21.00 | $114 | $100 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 12 EACH | $80.00 | $75.00 | $35.00 | $44.75 | $22.50 | $100 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $3,100 | $2,300 | $2,600 | $3,460 | $936 | $3,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 389 SY | $26.00 | $30.00 | $20.50 | $20.50 | $20.50 | $20.50 |
| 512E33000 TYPE 2 WATERPROOFING | 108 SY | $22.00 | $20.00 | $23.50 | $23.50 | $23.50 | $25.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 9 EACH | $2,100 | $1,750 | $2,400 | $3,750 | $1,556 | $1,200 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 49 SF | $9.00 | $25.00 | $12.00 | $5.17 | $12.00 | $15.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 98 FT | $26.00 | $40.00 | $45.00 | $45.00 | $36.80 | $28.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $900 | $800 | $950 | $925 | $628 | $900 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,300 | $1,300 | $1,475 | $1,344 | $1,071 | $1,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 49 CY | $100 | $90.00 | $95.00 | $57.00 | $140 | $125 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 401 FT | $11.00 | $13.50 | $13.50 | $16.00 | $10.50 | $15.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 109 FT | $8.00 | $20.00 | $8.00 | $7.50 | $8.50 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 91 FT | $13.00 | $20.00 | $12.00 | $8.50 | $12.50 | $16.00 |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 48 FT | $460 | $600 | $250 | $460 | $409 | $510 |
| 524E94805 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, AS PER | 48 FT | $480 | $600 | $265 | $478 | $409 | $660 |
| 526E90010 TYPE A INSTALLATION | 77 FT | $180 | $175 | $170 | $140 | $295 | $144 |
| 840E23000 SELECT GRANULAR BACKFILL | 456 CY | $50.00 | $50.00 | $75.00 | $38.75 | $62.00 | $50.00 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 4 EACH | $4,600 | $3,000 | $3,430 | $4,500 | $4,400 | $4,400 |
| 894E10100 CONCRETE CORE SAMPLING AND GROUTING | 11 FT | $690 | $100 | $115 | $205 | $500 | $20.00 |
| 894E10200 CONCRETE CORE STRENGTH TEST | 4 EACH | $90.00 | $100 | $450 | $72.00 | $40.00 | $200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $40,000 | $17,000 | $19,600 | $20,000 | $14,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,250 | $1,250 | $3,000 | $1,200 | $1,700 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,500 | $12,000 | $4,000 | $31,500 | $6,500 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E32212 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 250 CY | $970 | $243k | 12% |
| 515E15000 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $18,300 | $146k | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 91,780 LB | $1.3 | $119k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 511E43212 CLASS QC1 CONCRETE WITH QC/QA, PIER | 70 CY | $1,150 | $81k | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $80,000 | $80k | 4% |
| 515E15000 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 4 EACH | $18,400 | $74k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 410 CY | $164.75 | $68k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $67,000 | $67k | 3% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 206 SY | $300 | $62k | 3% |