ATB-SR 11-00.00
ATB County · est $3.2M
Bid dateThursday, May 13—
ATB County · est $3.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Koski Construction CO | R3Shelly & Sands INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 10,488 CY | $165 | $163 | $171 | $172 | 63% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 377,532 SY | $0.50 | $0.77 | $0.65 | $0.56 | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 5,000 SY | $37.00 | $23.75 | $25.00 | $22.00 | 7% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,000 SY | $178 | $165 | $263 | $80.50 |
| Item | Quantity | R1Ronyak Paving INC | R2Koski Construction CO | R3Shelly & Sands INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 170 CY | $35.00 | $20.00 | $35.00 | $8.00 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 6 EACH | $650 | $675 | $300 | $640 |
| 659E10000 SEEDING AND MULCHING | 22,500 SY | $0.42 | $0.50 | $0.68 | $0.90 |
| 659E20000 COMMERCIAL FERTILIZER | 3.04 TON | $300 | $605 | $250 | $800 |
| 659E31000 LIME | 4.65 ACRE | $60.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 33,979 GAL | $2.00 | $2.30 | $3.00 | $2.10 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $85,000 | $38,466 | $170,000 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2") | 2,532 CY | $20.00 | $48.00 | $55.00 | $45.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $49,820 | $90,000 | $41,000 | $171,075 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 18,219 GAL | $2.00 | $3.65 | $3.00 | $3.50 | 1% |
| 621E00100 RPM | 1,070 EACH | $31.40 | $24.00 | $24.00 | $25.81 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 37.12 MILE | $840 | $650 | $605 | $635 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 6,000 FT | $3.75 | $3.50 | $2.85 | $2.25 | 1% |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 33 MILE | $600 | $850 | $650 | $600 | 1% |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 32.2 MILE | $600 | $600 | $350 | $600 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $18,500 | $25,000 | $5,000 | $15,000 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 24 SNMT | $675 | $700 | $360 | $675 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 15 SNMT | $850 | $850 | $900 | $850 | 0% |
| 209E60200 LINEAR GRADING | 405 STA | $25.00 | $10.00 | $35.00 | $30.00 | 0% |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 16.1 MILE | $625 | $625 | $350 | $625 | 0% |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $65.00 | $68.00 | $65.00 | $65.00 | 0% |
| $127 |
| $25.00 |
| $1.00 |
| 659E35000 WATER | 121.5 MGAL | $1.00 | $3.00 | $0.10 | $0.25 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 170 CY | $50.00 | $50.00 | $20.00 | $35.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,060 EACH | $2.00 | $4.50 | $5.00 | $2.00 |
| 642E00204 LANE LINE, 6", TYPE 1 | 16.1 MILE | $545 | $500 | $362 | $500 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 8,696 FT | $0.90 | $0.75 | $0.60 | $0.60 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 5,435 FT | $0.63 | $0.50 | $0.60 | $0.50 |
| 646E10400 STOP LINE | 258 FT | $12.00 | $14.00 | $10.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,205 FT | $7.00 | $8.50 | $5.00 | $7.00 |
| 646E10900 HANDICAP SYMBOL MARKING | 5 EACH | $166 | $165 | $150 | $166 |
| 646E20200 PARKING LOT STALL MARKING | 621 FT | $5.00 | $3.70 | $5.00 | $5.00 |
| 646E20300 LANE ARROW | 8 EACH | $170 | $250 | $215 | $170 |
| 646E20320 WRONG WAY ARROW | 4 EACH | $250 | $500 | $270 | $250 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $100 | $100 | $125 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $115 | $150 | $200 | $240 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 16.1 MILE | $575 | $575 | $350 | $575 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 8,030 FT | $0.40 | $0.50 | $0.50 | $0.40 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 8,030 FT | $0.55 | $0.60 | $0.50 | $0.55 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 258 FT | $3.50 | $3.50 | $3.00 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 258 FT | $3.40 | $3.50 | $3.00 | $3.50 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,000 | $1,500 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,584 | $3,750 | $2,500 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 10,488 CY | $165 | $1.73M | 61% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 377,532 SY | $0.5 | $189k | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 5,000 SY | $37 | $185k | 6% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,000 SY | $178 | $178k | 6% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 33,979 GAL | $2 | $68k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2") | 2,532 CY | $20 | $51k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $49,820 | $50k | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 18,219 GAL | $2 | $36k | 1% |
| 621E00100 RPM | 1,070 EACH | $31.4 | $34k | 1% |