SCI-US 23-03.71
SCI County · est $0.2M
Bid dateThursday, May 13—
SCI County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Distel Construction INC | R2Axis Civil Construction LLC | R3Wolf Creek Contracting Company LLC | R4Geiger Brothers INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 303 FT | $69.75 | $42.00 | $66.72 | $68.28 | $50.00 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,460 | $20,000 | $9,430 | $23,786 | $48,000 | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 23 CY | $690 | $380 | $749 | $630 | $600 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $15,500 | $20,000 | $23,204 | $17,179 | $28,899 | 9% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 218 FT | $69.75 | $42.00 | $65.97 | $66.84 | $51.50 | 9% |
| 611E04400 12" CONDUIT, TYPE B |
| Item | Quantity | R1Distel Construction INC | R2Axis Civil Construction LLC | R3Wolf Creek Contracting Company LLC | R4Geiger Brothers INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $2,500 | $1,289 | $4,695 | $3,092 |
| 202E23000 PAVEMENT REMOVED | 135 SY | $10.00 | $20.00 | $17.30 | $32.59 | $17.50 |
| 202E32500 CURB AND GUTTER REMOVED | 218 FT | $10.00 | $10.00 | $6.29 | $21.06 | $3.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 10 FT | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 213 FT |
| $54.95 |
| $65.00 |
| $26.17 |
| $65.59 |
| $78.00 |
| 7% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 303 FT | $34.00 | $28.34 | $35.85 | $26.25 | $28.00 | 6% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $2,000 | $3,600 | $1,372 | $2,693 | $2,421 | 5% |
| 621E00100 RPM | 48 EACH | $125 | $90.00 | $112 | $24.07 | $53.50 | 4% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 290 FT | $20.00 | $16.00 | $18.25 | $26.84 | $10.00 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7 CY | $800 | $400 | $868 | $730 | $695 | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 7 CY | $785 | $400 | $849 | $714 | $680 | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,420 | $2,200 | $2,560 | $2,310 | $2,446 | 3% |
| 644E00204 LANE LINE, 6" | 0.5 MILE | $8,260 | $3,348 | $8,743 | $2,016 | $7,781 | 2% |
| 611E04600 12" CONDUIT, TYPE C | 17 FT | $237 | $65.00 | $36.70 | $58.79 | $67.50 | 2% |
| 644E00104 EDGE LINE, 6" | 0.5 MILE | $7,080 | $9,122 | $7,494 | $4,431 | $6,669 | 2% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.7 MILE | $4,956 | $2,000 | $2,498 | $2,100 | $4,668 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,356 | $1,800 | $2,026 | $2,152 | $5,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,100 | $5,000 | $3,185 | $4,958 | $14,500 | 2% |
| 304E20000 AGGREGATE BASE | 54 CY | $55.00 | $110 | $99.31 | $70.00 | $75.00 | 2% |
| $35.00 |
| $44.72 |
| $99.16 |
| $38.00 |
| 202E38000 GUARDRAIL REMOVED | 303 FT | $5.00 | $6.00 | $4.30 | $4.20 | $4.50 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 151 FT | $15.00 | $32.00 | $7.37 | $9.43 | $17.50 |
| 203E10000 EXCAVATION | 110 CY | $20.00 | $25.00 | $32.26 | $41.97 | $38.50 |
| 203E20000 EMBANKMENT | 21 CY | $30.00 | $25.00 | $79.84 | $48.84 | $74.50 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1 CY | $500 | $150 | $479 | $362 | $268 |
| 659E00300 TOPSOIL | 41 CY | $20.00 | $40.00 | $47.73 | $148 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 363 SY | $5.00 | $3.00 | $5.62 | $8.09 | $8.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 18 SY | $20.00 | $2.00 | $3.75 | $8.09 | $8.50 |
| 659E15000 INTER-SEEDING | 18 SY | $20.00 | $2.00 | $6.24 | $8.09 | $8.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,000 | $500 | $625 | $641 | $678 |
| 659E31000 LIME | 0.1 ACRE | $720 | $400 | $250 | $84.00 | $89.00 |
| 659E35000 WATER | 2 MGAL | $30.00 | $1.00 | $1.25 | $1.05 | $1.00 |
| 832E30000 EROSION CONTROL | 1,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $6,017 | $2,500 | $4,839 | $4,341 | $2,588 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 5 FT | $100 | $45.00 | $20.02 | $138 | $40.00 |
| 611E06100 15" CONDUIT, TYPE C | 15 FT | $115 | $90.00 | $44.69 | $66.41 | $61.00 |
| 204E10000 SUBGRADE COMPACTION | 338 SY | $2.00 | $2.00 | $6.40 | $1.91 | $3.50 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $200 | $441 | $316 | $222 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 590 FT | $4.25 | $5.76 | $1.35 | $3.26 | $2.00 |
| 407E10000 TACK COAT | 16 GAL | $3.00 | $4.00 | $5.00 | $1.84 | $1.75 |
| 408E10000 PRIME COAT | 53 GAL | $4.60 | $10.00 | $5.00 | $4.20 | $4.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 48 EACH | $20.00 | $14.00 | $11.94 | $92.14 | $10.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 50 FT | $17.70 | $12.00 | $14.36 | $12.08 | $16.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $100 | $60.00 | $65.21 | $63.00 | $94.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $30.00 | $20.00 | $20.42 | $21.00 | $28.00 |
| 644E00500 STOP LINE | 12 FT | $10.65 | $25.00 | $11.24 | $15.75 | $10.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $100 | $75.00 | $59.51 | $68.25 | $65.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 12 EACH | $14.15 | $42.00 | $49.96 | $10.50 | $11.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 12 EACH | $17.70 | $20.00 | $47.46 | $18.38 | $19.50 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,000 FT | $0.60 | $1.00 | $1.25 | $1.05 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 20 FT | $4.75 | $14.00 | $17.49 | $14.70 | $4.50 |
| 616E10000 WATER | 1 MGAL | $35.00 | $1.00 | $6.24 | $99.75 | $36.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 530 FT | $0.36 | $35.00 | $38.09 | $26.25 | $30.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 609E23000 COMBINATION CURB AND GUTTER, TYPE 4 | 303 FT | $69.75 | $21k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,460 | $16k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 23 CY | $690 | $16k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $15,500 | $16k | 8% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 218 FT | $69.75 | $15k | 8% |
| 611E04400 12" CONDUIT, TYPE B | 213 FT | $54.95 | $12k | 6% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 303 FT | $34 | $10k | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 4 EACH | $2,000 | $8k | 4% |
| 621E00100 RPM | 48 EACH | $125.1 | $6k | 3% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 290 FT | $20 | $6k | 3% |