ASD-US 250-11.61
ASD County · est $1.0M
Bid dateThursday, May 27—
ASD County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 79 more items below.
| Item | Quantity | R1V O Menuez & Son INC | R2Black Horse Bridge Construction INC | R3Rietschlin Construction INC | R4Stanley Miller Construction Company | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,540 FT | $76.60 | $68.00 | $82.00 | $71.60 | $55.00 | 16% |
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $11,090 | $13,200 | $10,900 | $13,995 | $15,000 | 15% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN (INCLUDE REMO | 1 LS | $110,600 | $23,500 | $40,000 | $13,867 | $70,000 |
| Item | Quantity | R1V O Menuez & Son INC | R2Black Horse Bridge Construction INC | R3Rietschlin Construction INC | R4Stanley Miller Construction Company | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,900 | $4,000 | $7,800 | $2,167 | $15,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $21.00 | $250 | $500 | $250 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 808 SY | $5.50 | $22.00 | $10.25 | $27.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 15% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 180 SY | $267 | $270 | $216 | $215 | $275 | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 49 CY | $770 | $1,375 | $1,273 | $891 | $1,100 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 140 CY | $255 | $205 | $226 | $228 | $250 | 5% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 51 CY | $640 | $550 | $359 | $450 | $1,200 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $29,855 | $20,000 | $45,000 | $39,756 | $40,000 | 4% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 134 SY | $199 | $150 | $182 | $193 | $270 | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 236 CY | $93.67 | $70.00 | $75.50 | $97.70 | $80.00 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 15,569 LB | $1.40 | $1.70 | $1.75 | $1.72 | $1.75 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 108.5 FT | $194 | $170 | $176 | $165 | $165 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 46 CY | $400 | $440 | $354 | $394 | $700 | 3% |
| 304E20000 AGGREGATE BASE | 282 CY | $56.00 | $68.00 | $58.00 | $67.00 | $85.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $13,675 | $44,575 | $51,934 | $44,416 | $40,000 | 2% |
| 526E90010 TYPE A INSTALLATION | 81 FT | $166 | $150 | $176 | $94.00 | $225 | 2% |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,430 FT | $9.40 | $3.00 | $21.00 | $8.55 | $35.00 | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (44 CY | $305 | $268 | $295 | $268 | $300 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 30 CF | $400 | $600 | $554 | $482 | $500 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" THICKNESS) | 431 SY | $26.00 | $12.00 | $14.00 | $13.34 | $25.00 | 2% |
| 160 FT |
| $2.00 |
| $8.00 |
| $43.00 |
| $10.00 |
| $25.00 |
| 202E38000 GUARDRAIL REMOVED | 418.25 FT | $2.00 | $2.00 | $10.00 | $2.50 | $1.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $250 | $200 | $273 | $150 | $135 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $400 | $210 | $397 | $150 | $80.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $20.00 | $30.00 | $217 | $25.00 | $11.00 |
| 203E10000 EXCAVATION | 650 CY | $16.50 | $26.00 | $7.50 | $27.20 | $20.00 |
| 203E20000 EMBANKMENT | 355 CY | $16.50 | $21.00 | $9.00 | $23.50 | $22.00 |
| 204E10000 SUBGRADE COMPACTION | 755 SY | $1.25 | $4.00 | $5.00 | $1.00 | $7.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $18.50 | $22.40 | $25.25 | $24.90 | $22.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH2016) | 1 EACH | $2,700 | $2,550 | $2,865 | $2,834 | $2,550 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T (MASH2016) | 2 EACH | $1,000 | $985 | $1,265 | $1,094 | $985 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,400 | $2,240 | $2,365 | $2,489 | $2,240 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $20.00 | $12.00 | $18.00 | $10.00 | $30.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,570 | $1,250 | $915 | $967 | $2,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 3 EACH | $300 | $900 | $303 | $100 | $1,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $203 | $165 | $229 | $184 | $165 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 | $159 | $100 | $100 |
| 659E00300 TOPSOIL (4" THICKNESS) | 111 CY | $21.45 | $50.00 | $23.00 | $48.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 1,333 SY | $2.25 | $1.00 | $1.75 | $2.50 | $2.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 67 SY | $2.00 | $5.00 | $13.00 | $1.00 | $0.50 |
| 659E15000 INTER-SEEDING | 67 SY | $2.00 | $1.00 | $13.00 | $1.00 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $700 | $1,000 | $4,037 | $1,000 | $600 |
| 659E31000 LIME | 0.28 ACRE | $100 | $200 | $1,935 | $400 | $25.00 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 609 SY | $2.15 | $2.50 | $2.50 | $300 | $2.55 |
| 832E30000 EROSION CONTROL | 10,020 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.35 CY | $1,898 | $1,500 | $2,308 | $2,222 | $3,000 |
| 605E12211 6" DEEP PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, A | 100 FT | $14.81 | $29.00 | $23.00 | $25.30 | $17.00 |
| 605E31100 AGGREGATE DRAINS | 53 FT | $8.47 | $16.00 | $18.25 | $17.50 | $13.00 |
| 611E01100 6" CONDUIT, TYPE C | 100 FT | $5.30 | $23.00 | $20.75 | $6.00 | $6.00 |
| 611E01800 8" CONDUIT, TYPE B | 100 FT | $7.10 | $32.00 | $40.75 | $9.00 | $8.00 |
| 611E06100 15" CONDUIT, TYPE C | 32 FT | $48.90 | $60.00 | $74.50 | $55.00 | $150 |
| 611E07600 18" CONDUIT, TYPE C | 117 FT | $44.40 | $60.00 | $65.50 | $63.00 | $105 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 1 EACH | $1,770 | $2,800 | $3,400 | $2,334 | $1,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $290 | $325 | $448 | $150 | $275 |
| 407E20000 NON-TRACKING TACK COAT | 120 GAL | $4.20 | $2.80 | $3.50 | $3.12 | $4.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $355 | $416 | $458 | $463 | $350 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 9 LB | $52.00 | $88.00 | $97.00 | $98.00 | $50.00 |
| 621E00100 RPM | 6 EACH | $368 | $395 | $269 | $504 | $244 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 12.5 FT | $15.00 | $20.00 | $22.00 | $22.25 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $150 | $75.00 | $71.50 | $84.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $15.00 | $22.00 | $16.75 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.2 MILE | $13,000 | $12,750 | $4,722 | $4,770 | $4,293 |
| 646E10200 CENTER LINE | 0.56 MILE | $13,000 | $12,750 | $5,770 | $5,828 | $5,245 |
| 646E10400 STOP LINE | 10 FT | $25.00 | $20.00 | $29.00 | $28.55 | $25.69 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.76 MILE | $5,500 | $10,665 | $5,192 | $5,244 | $4,720 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $60.50 | $70.00 | $71.50 | $85.00 | $80.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $900 | $1,795 | $2,255 | $2,328 | $2,050 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,874 | $3,600 | $4,489 | $6,433 | $9,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 18 EACH | $16.50 | $7.00 | $11.00 | $16.67 | $10.00 |
| 614E13318 BARRIER REFLECTOR, TYPE 5 (BI-DIRECTIONAL) | 21 EACH | $27.50 | $7.00 | $13.20 | $27.80 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 34 EACH | $22.00 | $13.00 | $16.50 | $22.23 | $15.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 5 SNMT | $998 | $725 | $1,368 | $1,056 | $1,244 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I (DO | 0.38 MILE | $13,148 | $13,000 | $12,039 | $13,445 | $10,945 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I ( | 0.59 MILE | $6,485 | $6,900 | $7,568 | $6,711 | $6,880 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 66 FT | $9.00 | $5.00 | $4.50 | $7.80 | $3.73 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 480 FT | $9.00 | $22.00 | $16.50 | $24.00 | $35.50 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 108 FT | $25.65 | $28.00 | $32.50 | $34.00 | $40.50 |
| 202E98100 REMOVAL MISC.: (EX. TIMBER PILES) | 1 EACH | $100 | $1,000 | $2,260 | $3,445 | $350 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $4,000 | $13,600 | $37,000 | $13,167 | $60,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 167 CY | $30.00 | $100 | $90.00 | $63.00 | $190 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $2,000 | $38,710 | $9,479 | $56,056 | $20,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 89 SY | $22.36 | $22.00 | $27.50 | $31.72 | $25.00 |
| 512E33000 TYPE 2 WATERPROOFING | 6 SY | $120 | $120 | $124 | $28.00 | $150 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $15.00 | $10.00 | $18.50 | $2.25 | $25.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 132 FT | $30.60 | $26.00 | $26.00 | $23.00 | $45.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 20 EACH | $15.00 | $40.00 | $71.25 | $13.34 | $47.00 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 40 EACH | $154 | $110 | $147 | $114 | $175 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 41 CY | $100 | $100 | $132 | $79.50 | $200 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 103 FT | $15.00 | $18.00 | $13.00 | $13.50 | $13.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 126 FT | $15.00 | $10.00 | $12.50 | $6.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 28 FT | $15.00 | $14.00 | $27.50 | $6.00 | $10.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $3,863 | $5,000 | $3,509 | $3,544 | $6,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,132 | $10,300 | $10,000 | $12,790 | $13,000 |
| 619E16000 FIELD OFFICE, TYPE A | 5 MNTH | $930 | $500 | $500 | $800 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,489 | $5,000 | $3,355 | $29,494 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,540 FT | $76.6 | $118k | 13% |
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $11,090 | $111k | 12% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN (INCLUDE REMO | 1 LS | $110,600 | $111k | 12% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 180 SY | $267.4 | $48k | 5% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 49 CY | $770 | $38k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 140 CY | $255 | $36k | 4% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 51 CY | $640 | $33k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $29,855 | $30k | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 134 SY | $199 | $27k | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 236 CY | $93.67 | $22k | 2% |