FAY-SR 41-00.47/02.32
FAY County · est $0.6M
Bid dateThursday, May 27—
FAY County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 68 more items below.
| Item | Quantity | R1Heavy Highway Construction Company | R2LLC Axis Civil Construction LLC | R3D G M INC | R4Alan Stone CO INC | R5Sunesis Construction CO | R6Eclipse CO LLC | R7Complete General Construction Company | R8Wai Construction Group | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 159 FT | $500 | $850 | $925 | $774 | $579 | $1,200 | $1,050 | $1,144 | 17% |
| 202E11005 STRUCTURE REMOVED, AS PER PLAN | 2 EACH | $25,000 | $9,000 | $10,000 | $9,000 | $8,621 |
| Item | Quantity | R1Heavy Highway Construction Company | R2LLC Axis Civil Construction LLC | R3D G M INC | R4Alan Stone CO INC | R5Sunesis Construction CO | R6Eclipse CO LLC | R7Complete General Construction Company | R8Wai Construction Group |
|---|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 184 FT | $12.00 | $20.00 | $20.00 | $30.00 | $13.18 | $17.00 | $18.00 | $16.29 |
| 202E35200 PIPE REMOVED, OVER 24" | 57 FT | $22.00 | $40.00 | $75.00 | $26.00 | $50.63 | $21.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $14,500 |
| $15,000 |
| $22,368 |
| 11% |
| 203E10000 EXCAVATION | 2,100 CY | $17.00 | $16.00 | $17.00 | $14.50 | $21.58 | $15.50 | $18.00 | $20.05 | 8% |
| 203E20000 EMBANKMENT | 1,677 CY | $20.00 | $16.00 | $17.00 | $9.00 | $12.56 | $11.00 | $19.00 | $18.64 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $30,001 | $40,000 | $20,000 | $64,500 | $49,772 | $30,000 | $20,000 | $8,111 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $5,000 | $12,500 | $3,400 | $4,558 | $8,500 | $15,000 | $2,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 134 CY | $180 | $260 | $290 | $345 | $295 | $270 | $270 | $270 | 5% |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 74 FT | $300 | $500 | $500 | $447 | $407 | $334 | $450 | $749 | 5% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 363 SY | $50.00 | $45.00 | $45.00 | $48.50 | $77.08 | $67.00 | $55.00 | $125 | 4% |
| 659E00300 TOPSOIL | 632 CY | $28.00 | $18.00 | $20.00 | $33.50 | $25.23 | $38.00 | $30.00 | $31.75 | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 32 CY | $500 | $350 | $650 | $764 | $340 | $808 | $450 | $450 | 3% |
| 690E98400 SPECIAL - COMPACTION TESTING | 1 LS | $15,000 | $6,400 | $7,500 | $1,900 | $6,758 | $7,803 | $8,500 | $5,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,000 | $13,245 | $14,000 | $17,000 | $14,182 | $22,000 | $15,000 | $11,441 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 63 CY | $220 | $425 | $500 | $617 | $361 | $490 | $482 | $482 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,000 | $4,300 | $17,500 | $5,500 | $5,075 | $13,670 | $7,000 | $17,000 | 3% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 96 CY | $125 | $85.00 | $85.00 | $66.50 | $122 | $80.00 | $78.00 | $109 | 3% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,100 LB | $2.25 | $1.90 | $2.00 | $3.00 | $2.16 | $4.00 | $3.65 | $1.25 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $220 | $160 | $330 | $457 | $383 | $398 | $357 | $357 | 2% |
| 503E31100 ROCK EXCAVATION | 71 CY | $150 | $55.00 | $50.00 | $42.50 | $73.91 | $51.50 | $58.00 | $170 | 2% |
| $30.00 |
| $38.65 |
| 202E38000 GUARDRAIL REMOVED | 727 FT | $2.00 | $4.00 | $1.00 | $3.00 | $6.00 | $6.50 | $6.00 | $2.08 |
| 202E75000 FENCE REMOVED | 1,402 FT | $1.00 | $1.50 | $2.50 | $2.50 | $5.00 | $3.50 | $5.00 | $3.31 |
| 202E98000 REMOVAL MISC.:PILE OF FENCE POSTS AND WIRE | 1 LS | $1,000 | $1,800 | $100 | $377 | $500 | $1,066 | $500 | $5,500 |
| 202E98100 REMOVAL MISC.:FOUNDATION | 1 EACH | $2,500 | $350 | $500 | $377 | $241 | $985 | $2,500 | $5,000 |
| 202E98100 REMOVAL MISC.:GABION WALL | 1 EACH | $2,000 | $1,200 | $500 | $1,900 | $754 | $2,000 | $1,600 | $5,000 |
| 203E35000 GRANULAR EMBANKMENT, 703.16.B | 72 CY | $65.00 | $70.00 | $70.00 | $60.50 | $79.15 | $33.50 | $55.00 | $148 |
| 204E10000 SUBGRADE COMPACTION | 629 SY | $1.50 | $2.00 | $8.00 | $2.50 | $6.50 | $3.00 | $3.00 | $1.85 |
| 204E45000 PROOF ROLLING | 1 HOUR | $500 | $200 | $100 | $704 | $288 | $219 | $150 | $220 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 2 STA | $375 | $550 | $1,000 | $300 | $1,268 | $1,247 | $1,100 | $1,118 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 124 SY | $45.00 | $52.00 | $45.00 | $52.00 | $77.29 | $66.00 | $70.00 | $61.00 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 51 CY | $125 | $85.00 | $85.00 | $71.50 | $124 | $80.50 | $70.00 | $145 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 10 CY | $125 | $85.00 | $45.00 | $85.50 | $80.34 | $97.50 | $85.00 | $115 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 6 CY | $150 | $125 | $100 | $68.50 | $116 | $89.00 | $125 | $92.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $500 | $100 | $100 | $256 | $200 | $140 | $75.00 | $140 |
| 659E10000 SEEDING AND MULCHING | 5,695 SY | $1.25 | $1.25 | $2.00 | $1.50 | $2.35 | $1.50 | $1.30 | $1.26 |
| 659E14000 REPAIR SEEDING AND MULCHING | 285 SY | $1.25 | $1.25 | $0.05 | $1.50 | $1.00 | $1.00 | $3.00 | $1.02 |
| 659E20000 COMMERCIAL FERTILIZER | 0.77 TON | $610 | $610 | $650 | $640 | $500 | $558 | $600 | $620 |
| 659E31000 LIME | 1.18 ACRE | $80.00 | $80.00 | $100 | $256 | $200 | $223 | $10.00 | $132 |
| 659E35000 WATER | 31 MGAL | $1.00 | $1.00 | $1.00 | $1.50 | $1.00 | $1.00 | $1.00 | $6.85 |
| 660E25000 SODDING STAKED | 665 SY | $11.00 | $9.00 | $11.00 | $7.50 | $6.68 | $6.50 | $12.95 | $15.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,050 SY | $2.00 | $2.00 | $2.50 | $3.00 | $2.35 | $2.50 | $1.90 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,500 | $1,750 | $1,900 | $1,495 | $3,000 | $2,200 | $2,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $6,125 | $7,500 | $2,600 | $2,040 | $2,200 | $6,000 | $10,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $6,300 | $6,000 | $7,300 | $8,607 | $6,500 | $5,800 | $9,500 |
| 602E20000 CONCRETE MASONRY | 1.6 CY | $750 | $3,250 | $1,500 | $2,900 | $1,964 | $2,200 | $4,000 | $1,494 |
| 605E31100 AGGREGATE DRAINS | 160 FT | $12.00 | $15.00 | $20.00 | $6.00 | $5.72 | $12.00 | $16.00 | $12.50 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 15 FT | $25.00 | $12.00 | $30.00 | $16.00 | $20.98 | $14.50 | $22.00 | $18.60 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 15 FT | $25.00 | $12.00 | $30.00 | $17.50 | $39.23 | $15.50 | $30.00 | $105 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $6.00 | $8.00 | $10.00 | $19.50 | $13.83 | $11.50 | $24.00 | $8.25 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $6.00 | $8.00 | $8.00 | $19.50 | $13.83 | $11.50 | $25.00 | $16.20 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $9.00 | $9.00 | $12.00 | $19.50 | $19.12 | $29.00 | $25.00 | $53.34 |
| 611E04400 12" CONDUIT, TYPE B | 66 FT | $65.00 | $10.00 | $70.00 | $96.00 | $66.70 | $67.50 | $84.00 | $73.44 |
| 611E04600 12" CONDUIT, TYPE C, 706.02 | 16 FT | $85.00 | $80.00 | $100 | $158 | $154 | $77.00 | $94.00 | $67.63 |
| 611E04900 12" CONDUIT, TYPE D, 706.02 | 24 FT | $85.00 | $80.00 | $85.00 | $130 | $78.26 | $63.50 | $90.00 | $49.83 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,000 | $2,100 | $1,750 | $2,000 | $2,100 | $2,214 | $1,800 | $1,848 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $400 | $250 | $200 | $222 | $295 | $216 | $277 | $318 |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 11 SY | $500 | $250 | $325 | $389 | $218 | $339 | $304 | $304 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 397 FT | $3.00 | $2.20 | $5.00 | $3.00 | $1.76 | $4.00 | $2.00 | $2.46 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 213 SY | $20.00 | $20.00 | $17.50 | $20.00 | $13.00 | $17.50 | $15.61 | $15.61 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" | 61 SY | $30.00 | $25.00 | $50.00 | $58.00 | $19.15 | $46.00 | $45.41 | $45.41 |
| 304E20000 AGGREGATE BASE | 100 CY | $75.00 | $90.00 | $85.00 | $68.50 | $73.26 | $60.00 | $108 | $105 |
| 407E20000 NON-TRACKING TACK COAT | 125 GAL | $10.00 | $5.00 | $6.84 | $9.00 | $5.00 | $7.00 | $6.84 | $6.84 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 64 CY | $100 | $80.00 | $120 | $88.50 | $219 | $62.00 | $148 | $134 |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 82 SY | $65.00 | $40.00 | $60.00 | $69.00 | $15.00 | $54.00 | $54.00 | $9.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 34.6 FT | $10.00 | $14.50 | $15.00 | $18.50 | $15.00 | $16.50 | $27.50 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 18.3 SF | $15.00 | $15.00 | $15.00 | $19.00 | $25.00 | $31.00 | $34.00 | $137 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $25.00 | $35.00 | $15.00 | $13.00 | $50.00 | $83.50 | $25.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $5.00 | $35.00 | $15.00 | $19.00 | $50.00 | $33.50 | $35.00 | $30.00 |
| 644E00104 EDGE LINE, 6" | 0.04 MILE | $12,500 | $12,500 | $34,000 | $42,000 | $60,000 | $13,933 | $47,100 | $47,099 |
| 644E00300 CENTER LINE | 0.02 MILE | $12,500 | $12,500 | $67,000 | $84,000 | $120,000 | $13,933 | $52,850 | $52,848 |
| 644E00500 STOP LINE | 22 FT | $15.50 | $15.50 | $10.00 | $13.00 | $10.00 | $17.50 | $16.50 | $16.37 |
| 407E10000 TACK COAT | 128 GAL | $10.00 | $3.00 | $6.78 | $8.50 | $5.00 | $7.50 | $6.78 | $6.78 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $55.00 | $50.00 | $83.00 | $75.00 | $72.50 | $85.00 | $70.25 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $200 | $160 | $150 | $457 | $334 | $171 | $300 | $357 |
| 642E00300 CENTER LINE, TYPE 1 | 0.6 MILE | $830 | $830 | $3,000 | $5,500 | $3,200 | $1,672 | $4,000 | $4,240 |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $5,000 | $18,000 | $10,000 | $24,000 | $85,211 | $15,110 | $36,000 | $16,133 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 16 CY | $600 | $2,300 | $1,000 | $1,500 | $3,229 | $2,592 | $1,700 | $1,300 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $400 | $723 | $1,200 | $2,200 | $630 | $1,334 | $1,400 | $1,010 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 84 SY | $9.00 | $30.00 | $40.00 | $21.50 | $12.00 | $25.50 | $12.00 | $9.50 |
| 512E33000 TYPE 2 WATERPROOFING | 298 SY | $18.00 | $16.00 | $13.00 | $12.50 | $23.50 | $19.50 | $23.50 | $45.00 |
| 512E33010 TYPE 3 WATERPROOFING | 84 SY | $30.00 | $32.00 | $25.00 | $44.50 | $32.00 | $37.50 | $32.00 | $36.20 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 52 SF | $10.00 | $5.00 | $15.00 | $2.00 | $3.63 | $6.50 | $14.00 | $9.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 10 CY | $100 | $250 | $100 | $363 | $151 | $67.50 | $124 | $103 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10,000 | $25,000 | $7,500 | $6,732 | $12,500 | $15,000 | $24,763 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,200 | $1,600 | $1,250 | $2,100 | $1,552 | $700 | $3,000 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $9,000 | $8,500 | $15,000 | $7,450 | $20,015 | $9,000 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 159 FT | $500 | $80k | 12% |
| 202E11005 STRUCTURE REMOVED, AS PER PLAN | 2 EACH | $25,000 | $50k | 8% |
| 203E10000 EXCAVATION | 2,100 CY | $17 | $36k | 6% |
| 203E20000 EMBANKMENT | 1,677 CY | $20 | $34k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,001 | $30k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $25,000 | $25k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 134 CY | $180 | $24k | 4% |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 74 FT | $300 | $22k | 3% |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 363 SY | $50 | $18k | 3% |
| 659E00300 TOPSOIL | 632 CY | $28 | $18k | 3% |