HAM-IR 275-28.29 (PART 1 AND PART 2)
HAM County · est $7.1M
Bid dateThursday, May 27—
HAM County · est $7.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 425 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Barrett Paving Materials INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 452E17010 14" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 4,767 SY | $98.00 | $98.00 | $156 | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,340 CY | $182 | $180 | $212 | 10% |
| 611E07400 18" CONDUIT, TYPE B | 2,550 FT | $110 | $105 | $130 | 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1177 CY | $230 | $185 | $245 | 7% |
| 638E11608 SPECIAL - 12" WATER MAIN DIP AND FITTINGS, CINCINN | 522 FT | $500 |
| Item | Quantity | R1Complete General Construction Company | R2Barrett Paving Materials INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $8,000 | $5,599 |
| 202E32000 CURB REMOVED | 286 FT | $12.00 | $12.00 | $12.61 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 177 FT | $33.00 | $30.00 | $25.51 |
| 202E38000 GUARDRAIL REMOVED | 2,476 FT | $2.00 | $5.00 | $5.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $320 | $175 | $175 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $480 |
| $420 |
| 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (937 CY | $230 | $210 | $264 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | $200,000 | 5% |
| 304E20000 AGGREGATE BASE | 2,716 CY | $68.00 | $78.00 | $50.00 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,032 CY | $178 | $185 | $207 | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 7,887 FT | $22.00 | $23.00 | $21.00 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 803 CY | $210 | $215 | $239 | 4% |
| 638E11610 SPECIAL - 16" WATER MAIN DIP AND FITTINGS, CINCINN | 140 FT | $1,200 | $422 | $540 | 4% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 4,187 CY | $40.00 | $48.00 | $55.00 | 4% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 545 CY | $300 | $525 | $320 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 729 CY | $210 | $210 | $234 | 4% |
| 203E10000 EXCAVATION | 7,505 CY | $19.00 | $22.00 | $30.09 | 3% |
| 203E10000 EXCAVATION | 4,091 CY | $32.00 | $20.00 | $18.00 | 3% |
| 304E20000 AGGREGATE BASE | 1,842 CY | $69.00 | $65.00 | $92.85 | 3% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 1,544 SY | $72.00 | $73.00 | $72.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 6,161 SY | $18.00 | $32.00 | $23.15 | 3% |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 8 EACH | $155 | $175 | $175 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $380 | $900 | $2,497 |
| 203E20000 EMBANKMENT | 2,433 CY | $5.00 | $22.00 | $15.23 |
| 606E15050 GUARDRAIL, TYPE MGS | 3,012.5 FT | $20.40 | $18.50 | $18.50 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 662.5 FT | $23.20 | $21.25 | $21.25 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,520 | $2,500 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 10 EACH | $985 | $1,100 | $1,100 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $2,240 | $2,100 | $2,100 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $625 | $400 | $400 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $20,000 | $32,000 | $29,250 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $24,000 | $12,000 | $18,750 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 18 SY | $125 | $120 | $127 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT O | 6 SY | $100 | $85.00 | $540 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 1 CY | $585 | $315 | $1,286 |
| 659E00300 TOPSOIL | 56 CY | $60.00 | $75.00 | $113 |
| 659E10000 SEEDING AND MULCHING | 8,491 SY | $0.98 | $0.98 | $0.98 |
| 659E14000 REPAIR SEEDING AND MULCHING | 425 SY | $0.98 | $0.98 | $0.98 |
| 659E15000 INTER-SEEDING | 425 SY | $0.50 | $0.50 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.18 TON | $800 | $800 | $800 |
| 659E31000 LIME | 1.75 ACRE | $70.00 | $70.00 | $70.00 |
| 659E35000 WATER | 47 MGAL | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 19 MSF | $15.00 | $15.00 | $15.00 |
| 670E00700 DITCH EROSION PROTECTION | 190 SY | $3.25 | $3.25 | $3.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,250 | $1,250 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $4,550 | $8,175 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,500 | $5,500 | $6,490 |
| 832E30000 EROSION CONTROL | 58,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $2,700 | $2,700 | $5,255 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 2,493 FT | $16.00 | $14.00 | $30.37 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 1,292 FT | $17.00 | $14.00 | $37.29 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 6,876 FT | $12.00 | $14.00 | $22.87 |
| 611E04400 12" CONDUIT, TYPE B | 732 FT | $115 | $100 | $111 |
| 611E98180 CATCH BASIN, NO. 3A | 9 EACH | $3,700 | $3,700 | $2,512 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $1,000 | $700 | $1,867 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,300 | $3,800 | $4,224 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $1,000 | $825 | $649 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 9 EACH | $280 | $275 | $681 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 1,129 CY | $50.00 | $50.00 | $63.47 |
| 204E10000 SUBGRADE COMPACTION | 9,281 SY | $3.00 | $1.00 | $4.18 |
| 204E13000 EXCAVATION OF SUBGRADE, 12" DEEP | 1,129 CY | $19.00 | $20.00 | $40.11 |
| 204E45000 PROOF ROLLING | 4 HOUR | $300 | $200 | $218 |
| 204E50000 GEOTEXTILE FABRIC | 3,387 SY | $1.60 | $2.25 | $4.33 |
| 253E02000 PAVEMENT REPAIR | 40 CY | $650 | $680 | $659 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 15,690 SY | $3.35 | $4.50 | $3.94 |
| 407E20000 NON-TRACKING TACK COAT | 2,857 GAL | $5.00 | $3.25 | $4.50 |
| 608E10000 4" CONCRETE WALK | 3,975 SF | $5.60 | $5.50 | $6.41 |
| 608E52000 CURB RAMP | 768 SF | $11.00 | $9.00 | $12.91 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 1,185 FT | $41.00 | $38.00 | $34.83 |
| 609E26000 CURB, TYPE 6 | 25 FT | $47.00 | $30.00 | $26.84 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 30 EACH | $285 | $525 | $730 |
| 638E11602 SPECIAL - 6" WATER MAIN DIP AND FITTINGS, CINCINNA | 40 FT | $310 | $137 | $353 |
| 638E11604 SPECIAL - 8" WATER MAIN DIP AND FITTINGS, CINCINNA | 40 FT | $600 | $261 | $369 |
| 638E20458 SPECIAL - 18" STEEL PIPE ENCASEMENT, OPEN CUT, CIN | 10 FT | $195 | $361 | $301 |
| 638E20470 SPECIAL - 30" STEEL PIPE ENCASEMENT, OPEN CUT, CIN | 84 FT | $285 | $333 | $233 |
| 638E20498 SPECIAL - VALVE BOX, CINCINNATI SPEC 1116 | 3 EACH | $3,500 | $455 | $1,036 |
| 638E20746 SPECIAL - 2" AIR RELEASE VALVE WITH VALVE BOX, COM | 3 EACH | $655 | $3,718 | $2,365 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT, CINCINNATI SPEC 1112 | 1 EACH | $4,100 | $3,547 | $5,566 |
| 638E20760 SPECIAL - FIRE HYDRANT REMOVED AND DISPOSED OF, CI | 1 EACH | $1,250 | $50.00 | $1,016 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 2 EACH | $3,125 | $2,185 | $1,094 |
| 638E20778 SPECIAL - 2" COPPER WATER SERVICE LINE, CINCINNATI | 15 FT | $265 | $358 | $354 |
| 638E20778 SPECIAL - 2" COPPER WATER SERVICE LINE, WITH AQUAS | 38 FT | $225 | $358 | $194 |
| 638E98000 WATER WORK, MISC.: MANHOLE CURB AND COVER ADJUSTED | 1 EACH | $1,940 | $350 | $1,120 |
| 638E98000 WATER WORK, MISC.: VALVE BOX REMOVED, CINCINNATI S | 5 EACH | $560 | $10.00 | $762 |
| 638E98000 WATER WORK, MISC.: RELOCATING EXISTING 2" FROST PR | 1 EACH | $765 | $250 | $2,588 |
| 621E00100 RPM | 290 EACH | $27.15 | $27.15 | $27.15 |
| 625E32000 GROUND ROD | 1 EACH | $250 | $236 | $236 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 54 EACH | $7.50 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 391.3 FT | $13.00 | $11.00 | $11.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 26 FT | $14.00 | $12.50 | $12.50 |
| 630E08600 SIGN POST REFLECTOR | 16 EACH | $45.00 | $40.00 | $40.00 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 4 EACH | $675 | $850 | $850 |
| 630E76530 SPAN WIRE SIGN SUPPORT, TYPE TC-17.11, DESIGN 10 | 1 EACH | $21,750 | $16,200 | $16,200 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 4 EACH | $335 | $275 | $275 |
| 630E80100 SIGN, FLAT SHEET | 218.7 SF | $16.00 | $17.00 | $17.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 264 SF | $16.00 | $34.00 | $34.00 |
| 630E81200 SIGN ERECTED, EXTRUSHEET | 264 SF | $7.00 | $1.00 | $1.00 |
| 630E84520 SPAN WIRE SIGN SUPPORT FOUNDATION | 1 EACH | $5,950 | $7,800 | $7,800 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 32 EACH | $15.00 | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $65.00 | $65.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 22 EACH | $15.00 | $30.00 | $30.00 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 4 EACH | $335 | $1,750 | $1,750 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 7 EACH | $165 | $400 | $400 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 1 EACH | $1,450 | $500 | $500 |
| 644E00104 EDGE LINE, 6" | 0.53 MILE | $5,930 | $5,930 | $5,930 |
| 644E00204 LANE LINE, 6" | 0.46 MILE | $4,015 | $4,015 | $4,015 |
| 644E00300 CENTER LINE | 0.34 MILE | $6,640 | $6,640 | $6,640 |
| 644E00404 CHANNELIZING LINE, 12" | 1,769 FT | $1.50 | $1.50 | $1.50 |
| 644E00500 STOP LINE | 306 FT | $9.88 | $9.88 | $9.88 |
| 644E00600 CROSSWALK LINE | 448 FT | $4.94 | $4.94 | $4.94 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 325 FT | $6.73 | $6.73 | $6.73 |
| 644E00720 CHEVRON MARKING | 88 FT | $6.73 | $6.73 | $6.73 |
| 644E01300 LANE ARROW | 34 EACH | $93.41 | $93.41 | $93.41 |
| 644E01400 WORD ON PAVEMENT, 72" | 2 EACH | $189 | $189 | $189 |
| 644E01510 DOTTED LINE, 6" | 607 FT | $1.40 | $1.40 | $1.40 |
| 646E10010 EDGE LINE, 6" | 1.01 MILE | $2,641 | $2,641 | $2,641 |
| 646E10110 LANE LINE, 6" | 0.12 MILE | $912 | $912 | $912 |
| 646E10200 CENTER LINE | 0.09 MILE | $3,241 | $3,241 | $3,241 |
| 646E10310 CHANNELIZING LINE, 12" | 2,224 FT | $2.21 | $2.21 | $2.21 |
| 646E10400 STOP LINE | 179 FT | $15.15 | $15.15 | $15.15 |
| 646E10620 CHEVRON MARKING | 129 FT | $5.10 | $5.10 | $5.10 |
| 646E20300 LANE ARROW | 48 EACH | $283 | $283 | $283 |
| 646E20320 WRONG WAY ARROW | 8 EACH | $88.30 | $88.30 | $88.30 |
| 646E20350 LANE REDUCTION ARROW | 2 EACH | $308 | $308 | $308 |
| 646E20400 WORD ON PAVEMENT, 72" | 2 EACH | $238 | $238 | $238 |
| 646E20504 DOTTED LINE, 6" | 782 FT | $0.79 | $0.79 | $0.79 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 4 EACH | $102 | $102 | $102 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 1,977 FT | $0.49 | $0.49 | $0.49 |
| 611E00400 4" CONDUIT, TYPE E - UNDERDRAIN FOR PULL BOXES | 30 FT | $11.00 | $13.10 | $13.10 |
| 625E25410 CONDUIT, 2", 725.052 | 83 FT | $16.00 | $8.97 | $8.97 |
| 625E25606 CONDUIT, 4", 725.052 | 36 FT | $25.00 | $19.48 | $19.48 |
| 625E29002 TRENCH, 24" DEEP | 119 FT | $7.00 | $12.28 | $12.28 |
| 625E31510 PULL BOX REMOVED | 11 EACH | $150 | $207 | $207 |
| 625E32000 GROUND ROD | 12 EACH | $250 | $236 | $236 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 7 EACH | $465 | $205 | $205 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 16 EACH | $155 | $153 | $153 |
| 630E80100 SIGN, FLAT SHEET | 97 SF | $16.00 | $23.70 | $23.70 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 17 EACH | $750 | $838 | $838 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,150 | $1,305 | $1,305 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,200 | $1,294 | $1,294 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 6 EACH | $595 | $580 | $580 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 22 EACH | $35.00 | $35.50 | $35.50 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $30.00 | $18.84 | $18.84 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 4 EACH | $330 | $258 | $258 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $2,350 | $1,338 | $1,338 |
| 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES | 677 FT | $18.00 | $17.90 | $17.90 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 677 FT | $20.00 | $24.10 | $24.10 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 650 FT | $2.00 | $1.97 | $1.97 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 930 FT | $2.50 | $2.55 | $2.55 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,156 FT | $3.00 | $3.00 | $3.00 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 8 EACH | $5,600 | $5,446 | $5,446 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $1,600 | $1,004 | $1,004 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 150 FT | $5.00 | $4.41 | $4.41 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 155 FT | $5.90 | $5.81 | $5.81 |
| 632E70000 POWER SERVICE | 2 EACH | $2,500 | $2,771 | $2,771 |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 3 EACH | $8,600 | $8,778 | $8,778 |
| 632E86131 STRAIN POLE, TYPE TC-81.11, DESIGN 10, AS PER PLAN | 1 EACH | $8,900 | $9,825 | $9,825 |
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 2 EACH | $10,500 | $10,844 | $10,844 |
| 632E86141 STRAIN POLE, TYPE TC-81.11, DESIGN 12, AS PER PLAN | 1 EACH | $11,000 | $11,040 | $11,040 |
| 632E86150 STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 1 EACH | $11,850 | $11,876 | $11,876 |
| 632E89600 PEDESTAL, 8' | 1 EACH | $850 | $719 | $719 |
| 632E89800 PEDESTAL, 3', TRANSFORMER BASE | 1 EACH | $700 | $631 | $631 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM - PED | 3 EACH | $185 | $196 | $196 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM - SIG | 1 EACH | $325 | $196 | $196 |
| 632E90030 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM - 5C | 100 FT | $2.00 | $7.84 | $7.84 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $3,500 | $4,726 | $4,726 |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 162 FT | $9.00 | $5.92 | $5.92 |
| 633E65520 CABINET, TYPE 332 | 2 EACH | $12,000 | $11,798 | $11,798 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $2,975 | $1,616 | $1,616 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $1,650 | $502 | $502 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $7,000 | $7,384 | $7,384 |
| 809E69110 STOP LINE AND ADVANCE RADAR DETECTION | 8 EACH | $6,900 | $7,054 | $7,054 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 2 EACH | $4,550 | $4,854 | $4,854 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM - PREEMPTION | 6 EACH | $1,950 | $612 | $612 |
| 202E98200 REMOVAL MISC.: FIBER OPTIC INTERCONNECT CABLE | 2,755 FT | $2.00 | $0.78 | $0.78 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 200 FT | $3.00 | $4.00 | $4.00 |
| 625E25408 CONDUIT, 2", 725.051 | 332 FT | $15.00 | $7.55 | $7.55 |
| 625E25740 CONDUIT, MULTICELL, JACKED OR DRILLED 4" | 100 FT | $76.00 | $25.51 | $25.51 |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40 4" | 630 FT | $35.00 | $18.43 | $18.43 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 - 2" CONDUIT | 118 FT | $41.00 | $54.25 | $54.25 |
| 625E29010 TRENCH, 30" DEEP | 912 FT | $12.00 | $13.41 | $13.41 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,000 | $722 | $722 |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 5 EACH | $3,200 | $1,860 | $1,860 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $150 | $196 | $196 |
| 625E32001 GROUND ROD, AS PER PLAN | 7 EACH | $250 | $236 | $236 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 912 FT | $2.00 | $1.30 | $1.30 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 600 FT | $2.00 | $18.50 | $18.50 |
| 632E62830 INTERCONNECT, MISC.: SYSTEM INTEGRATION | 1 LS | $3,700 | $3,825 | $3,825 |
| 632E70000 POWER SERVICE | 1 EACH | $2,500 | $1,788 | $1,788 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM, ETHERNET SWITCH | 2 EACH | $250 | $251 | $251 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,975 | $1,420 | $1,420 |
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 1,010 FT | $5.35 | $2.71 | $2.71 |
| 804E30001 FAN-OUT KIT, 6 FIBER, AS PER PLAN | 7 EACH | $275 | $502 | $502 |
| 804E32021 DROP CABLE, 6 FIBER, AS PER PLAN | 2,550 FT | $4.50 | $2.81 | $2.81 |
| 804E32990 FIBER OPTIC PATCH CORD, 2 FIBER | 4 EACH | $25.00 | $57.50 | $57.50 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 1 EACH | $1,730 | $2,008 | $2,008 |
| 804E37701 FIBER OPTIC CABLE TESTING, AS PER PLAN | 1 LS | $9,750 | $1,623 | $1,623 |
| 809E60030 CCTV IP-CAMERA SYSTEM, ENHANCED | 1 EACH | $10,000 | $9,818 | $9,818 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 100 FT | $5.00 | $2.84 | $2.84 |
| 809E65001 ITS CABINET - GROUND MOUNTED, AS PER PLAN | 1 EACH | $11,000 | $9,568 | $9,568 |
| 809E65990 ITS DEVICE, MISC.: REMOVAL OF CCTV CAMERA | 1 EACH | $500 | $392 | $392 |
| 809E65990 ITS DEVICE, MISC.: REMOVAL OF ITS CABINET | 1 EACH | $650 | $784 | $784 |
| 809E65990 ITS DEVICE, MISC.: REMOVAL OF STRAIN POLE | 1 EACH | $2,165 | $806 | $806 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $20,000 | $11,772 | $11,772 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 15 EACH | $105 | $118 | $118 |
| 625E15201 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, AS PER PLA | 1 EACH | $15,250 | $9,920 | $9,920 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 2,250 FT | $3.00 | $5.11 | $5.11 |
| 625E25500 CONDUIT, 3", 725.04 | 650 FT | $42.00 | $36.05 | $36.05 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 100 FT | $60.00 | $82.04 | $82.04 |
| 625E29002 TRENCH, 24" DEEP | 650 FT | $8.00 | $12.30 | $12.30 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,000 | $722 | $722 |
| 625E32000 GROUND ROD | 2 EACH | $250 | $236 | $236 |
| 625E35020 RE-ERECT EXISTING LIGHT TOWER | 1 EACH | $2,600 | $2,352 | $2,352 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $15,000 | $2,668 | $1,071 |
| 625E75351 LIGHT TOWER REMOVED, AS PER PLAN | 1 EACH | $3,000 | $1,176 | $1,176 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 1 EACH | $1,200 | $795 | $795 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $90.00 | $80.00 | $106 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,120 | $2,050 | $2,451 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,120 | $2,100 | $2,309 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 668 EACH | $8.00 | $6.00 | $6.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 BIDIRECTIONAL | 94 EACH | $13.00 | $15.00 | $28.77 |
| 614E13360 OBJECT MARKER, TWO WAY | 94 EACH | $14.50 | $15.00 | $28.77 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 2.14 MILE | $1,925 | $1,925 | $1,925 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.02 MILE | $855 | $855 | $855 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.18 MILE | $2,485 | $2,485 | $2,485 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.75 MILE | $1,150 | $1,150 | $1,150 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 4.6 MILE | $2,150 | $2,150 | $2,150 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 2.07 MILE | $975 | $975 | $975 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 8,282 FT | $0.55 | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 5,662 FT | $0.50 | $0.50 | $0.50 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 4,192 FT | $0.45 | $0.45 | $0.45 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 1,301 FT | $0.40 | $0.40 | $0.40 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,092 FT | $2.50 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 745 FT | $2.40 | $2.40 | $2.40 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 896 FT | $2.00 | $2.00 | $2.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $10,000 | $14,000 | $8,033 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 151 SY | $140 | $195 | $160 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 4,416 FT | $16.00 | $12.00 | $17.10 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $20,000 | $43,000 |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $41,500 | $25,000 | $5,000 |
| 202E11305 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 SY | $330 | $1,500 | $1,000 |
| 202E20010 HEADWALL REMOVED | 5 EACH | $300 | $150 | $50.00 |
| 202E23000 PAVEMENT REMOVED | 9,861 SY | $11.00 | $10.00 | $4.00 |
| 202E30000 WALK REMOVED | 108 SF | $4.50 | $2.50 | $1.00 |
| 202E32000 CURB REMOVED | 261 FT | $7.50 | $7.00 | $2.00 |
| 202E32500 CURB AND GUTTER REMOVED | 814 FT | $7.50 | $7.00 | $2.00 |
| 202E32600 GUTTER REMOVED | 41 FT | $13.00 | $7.00 | $3.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2,563 FT | $22.00 | $18.00 | $2.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 236 FT | $45.00 | $25.00 | $4.00 |
| 202E38000 GUARDRAIL REMOVED | 271 FT | $2.00 | $5.00 | $5.00 |
| 202E58000 MANHOLE REMOVED | 2 EACH | $770 | $600 | $120 |
| 202E58100 CATCH BASIN REMOVED | 18 EACH | $370 | $600 | $80.00 |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $460 | $600 | $70.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 454 FT | $22.00 | $40.00 | $10.00 |
| 202E75000 FENCE REMOVED | 25 FT | $6.00 | $15.00 | $15.00 |
| 202E98100 REMOVAL MISC.: REMOVE PRIVATE SIGN FOR SALVAGE | 12 EACH | $385 | $475 | $100 |
| 203E10001 EXCAVATION, AS PER PLAN | 110 CY | $65.00 | $38.00 | $18.00 |
| 203E20000 EMBANKMENT | 2,886 CY | $6.00 | $13.00 | $15.00 |
| 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN | 110 CY | $54.00 | $75.00 | $75.00 |
| 204E10000 SUBGRADE COMPACTION | 16,660 SY | $2.50 | $1.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 4,187 CY | $19.00 | $35.00 | $18.00 |
| 204E45000 PROOF ROLLING | 9 HOUR | $300 | $200 | $50.00 |
| 204E50000 GEOTEXTILE FABRIC , TYPE D | 165 SY | $3.00 | $7.00 | $2.00 |
| 204E51000 GEOGRID | 12,564 SY | $3.00 | $2.50 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 362.5 FT | $20.40 | $18.50 | $18.50 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 100 FT | $31.60 | $26.50 | $26.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,520 | $2,500 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 8 EACH | $985 | $1,100 | $1,100 |
| 608E12000 5" CONCRETE WALK | 15,287 SF | $6.00 | $6.00 | $6.41 |
| 608E52000 CURB RAMP | 1,076 SF | $12.00 | $9.50 | $12.91 |
| 608E53020 DETECTABLE WARNING | 20 SF | $40.00 | $19.50 | $30.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $900 | $850 | $500 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 4 EACH | $195 | $400 | $100 |
| 690E65010 SPECIAL - WORK INVOLVING SOLID WASTE | 370 TON | $80.00 | $100 | $33.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $60,000 | $62,000 | $54,000 |
| 601E11000 RIPRAP, TYPE D | 24 SY | $290 | $260 | $80.00 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 40 CY | $105 | $130 | $120 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 3 CY | $236 | $275 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2.2 CY | $300 | $350 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $130 | $130 | $130 |
| 659E00300 TOPSOIL | 988 CY | $25.00 | $59.00 | $30.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 8,895 SY | $1.14 | $1.14 | $1.14 |
| 659E14000 REPAIR SEEDING AND MULCHING | 445 SY | $1.14 | $1.14 | $1.14 |
| 659E15000 INTER-SEEDING | 445 SY | $0.50 | $0.50 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 2 TON | $800 | $800 | $800 |
| 659E31000 LIME | 1.24 ACRE | $75.00 | $75.00 | $75.00 |
| 659E35000 WATER | 50 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 155 SY | $3.25 | $3.25 | $3.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,250 | $1,250 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $4,550 | $8,175 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,500 | $8,000 | $6,940 |
| 832E30000 EROSION CONTROL | 97,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 55 CY | $1,400 | $1,350 | $1,200 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $26.00 | $14.00 | $10.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 8,206 FT | $13.00 | $14.00 | $10.00 |
| 611E00400 4" CONDUIT, TYPE E, 707.45 | 40 FT | $36.00 | $12.00 | $8.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 310 FT | $27.00 | $15.00 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F, 707.45 | 50 FT | $13.00 | $30.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 539 FT | $130 | $125 | $90.00 |
| 611E04600 12" CONDUIT, TYPE C | 271 FT | $94.00 | $100 | $80.00 |
| 611E07600 18" CONDUIT, TYPE C | 561 FT | $87.00 | $105 | $100 |
| 611E10400 24" CONDUIT, TYPE B | 40 FT | $201 | $130 | $200 |
| 611E13400 30" CONDUIT, TYPE B | 449 FT | $195 | $140 | $250 |
| 611E13600 30" CONDUIT, TYPE C | 19 FT | $169 | $140 | $170 |
| 611E20700 48" CONDUIT, TYPE A, 706.02 | 30 FT | $454 | $475 | $2,200 |
| 611E25000 66" CONDUIT, TYPE A, 706.02 OR 72" 707.02 (0.249), | 108 FT | $675 | $550 | $1,600 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $4,450 | $4,275 | $3,800 |
| 611E98180 CATCH BASIN, NO. 3A | 24 EACH | $3,980 | $3,600 | $2,600 |
| 611E98260 CATCH BASIN, NO. 4 WITHOUT APRON | 1 EACH | $5,370 | $5,000 | $4,000 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,500 | $3,500 | $3,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,770 | $2,500 | $1,900 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $4,200 | $3,500 | $2,300 |
| 611E98700 INLET, SIDE DITCH | 5 EACH | $2,360 | $2,500 | $2,000 |
| 611E99574 MANHOLE, NO. 3 | 23 EACH | $4,175 | $4,300 | $5,000 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 2 EACH | $5,780 | $5,300 | $6,000 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $31,500 | $15,000 | $25,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 14 EACH | $1,000 | $750 | $500 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 13 EACH | $200 | $500 | $50.00 |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $58,000 | $42,000 | $30,000 |
| 611E04400 12" CONDUIT, TYPE B, 748.01 OR 748.02 | 234 FT | $250 | $278 | $310 |
| 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN (12" TYPE B) | 115 FT | $81.00 | $280 | $100 |
| 611E99550 MANHOLE, NO. 1 | 2 EACH | $7,150 | $4,592 | $9,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 9,631 SY | $4.25 | $3.75 | $5.14 |
| 407E20000 NON-TRACKING TACK COAT | 1,967 GAL | $5.00 | $3.25 | $4.50 |
| 452E11050 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 62 SY | $71.00 | $85.00 | $67.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 77 FT | $57.00 | $44.00 | $21.00 |
| 609E26000 CURB, TYPE 6 | 575 FT | $35.00 | $29.00 | $24.00 |
| 690E98400 SPECIAL - MISC.: CONSULTANT FOR CONCRETE QUALITY | 1 LS | $16,000 | $17,000 | $26,250 |
| 203E98000 ROADWAY, MISC.: ADDITIONAL EXCAVATION, CINCINNATI | 5 CY | $63.00 | $10.00 | $15.00 |
| 203E98000 ROADWAY, MISC.: EXPLORATORY EXCAVATION, CINCINNAT | 5 CY | $63.00 | $10.00 | $15.00 |
| 509E40000 REINFORCING STEEL, MISC.: REINFORCING STEEL, CINC | 5,963 LB | $1.75 | $0.50 | $0.01 |
| 511E71100 CONCRETE, MISC.: CONCRETE, CLASS "C", CINCINNATI | 47 CY | $300 | $50.00 | $10.00 |
| 602E10000 BRICK MASONRY, CINCINNATI SPEC 602 | 1 CY | $500 | $1.00 | $20.00 |
| 638E11602 SPECIAL - 6" WATER MAIN DIP AND FITTINGS, CINCINNA | 222 FT | $330 | $115 | $340 |
| 638E11604 SPECIAL - 8" WATER MAIN DIP AND FITTINGS, CINCINNA | 118 FT | $450 | $349 | $360 |
| 638E11606 SPECIAL - 10" WATER MAIN DIP AND FITTINGS, CINCINN | 14 FT | $865 | $640 | $380 |
| 638E20454 SPECIAL - 16" STEEL PIPE ENCASEMENT, OPEN CUT, CIN | 11 FT | $100 | $404 | $100 |
| 638E20466 SPECIAL - 24" STEEL PIPE ENCASEMENT, OPEN CUT, CIN | 45 FT | $140 | $410 | $130 |
| 638E20498 SPECIAL - VALVE BOX,COMPLETE, CINCINNATI SPEC 1116 | 14 EACH | $3,500 | $182 | $300 |
| 638E20500 SPECIAL - VALVE BOX ADJUSTED TO GRADE, CINCINNATI | 4 EACH | $255 | $25.00 | $50.00 |
| 638E20742 SPECIAL - 1" AIR RELEASE VALVE WITH VALVE BOX, COM | 5 EACH | $655 | $655 | $600 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT, CINCINNATI SPEC 1112 | 8 EACH | $4,100 | $3,579 | $5,000 |
| 638E20760 SPECIAL - FIRE HYDRANT REMOVED AND DISPOSED OF, CI | 8 EACH | $450 | $50.00 | $100 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 3 EACH | $460 | $515 | $500 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 3 EACH | $575 | $567 | $600 |
| 638E20762 SPECIAL - FIRE HYDRANT SERVICE LINE EXTENDED AND A | 2 EACH | $600 | $470 | $400 |
| 638E20766 SPECIAL - 3/4" COPPER WATER SERVICE LINE, WITH AQU | 181 FT | $115 | $256 | $50.00 |
| 638E20770 SPECIAL - 1" COPPER WATER SERVICE LINE, WITH AQUA | 131 FT | $100 | $263 | $60.00 |
| 638E20778 SPECIAL - 2" COPPER WATER SERVICE LINE, WITH AQUA | 73 FT | $160 | $386 | $100 |
| 638E20786 SPECIAL - RETAP AND RECONNECT WATER SERVICE CONNEC | 1 FT | $500 | $840 | $1,000 |
| 638E30002 SPECIAL - SHEETING AND BRACING ORDERED LEFT IN PLA | 1 MBF | $3,200 | $1.00 | $10.00 |
| 638E98000 WATER WORK, MISC.:FURNISHING & INSTALLING 8" METER | 1 EACH | $90,000 | $39,540 | $40,000 |
| 638E98000 WATER WORK, MISC.:FURNISHING AND INSTALLING CURB A | 4 EACH | $100 | $157 | $100 |
| 638E98000 WATER WORK, MISC.:FURNISHING AND INSTALLING CURB A | 12 EACH | $100 | $82.00 | $100 |
| 638E98000 WATER WORK, MISC.:RELOCATING EXISTING 1" FROST-PRO | 2 EACH | $1,020 | $389 | $2,000 |
| 638E98000 WATER WORK, MISC.:RELOCATING EXISTING 2" FROST-PRO | 2 EACH | $1,020 | $1,557 | $3,200 |
| 638E98000 WATER WORK, MISC.:RELOCATING EXISTING 3/4" FROST-P | 1 EACH | $1,020 | $389 | $1,500 |
| 638E98000 WATER WORK, MISC.:RELOCATING EXISTING 5/8" FROST-P | 5 EACH | $1,020 | $389 | $1,500 |
| 638E98000 WATER WORK, MISC.:REMOVING EXISTING MANHOLE CURB A | 2 EACH | $1,300 | $150 | $100 |
| 638E98000 WATER WORK, MISC.:REMOVING EXISTING VALVE BOX, CIN | 10 EACH | $560 | $5.00 | $10.00 |
| 638E98000 WATER WORK, MISC.:REMOVING EXISTING VALVE BOXES CO | 3 EACH | $765 | $5.00 | $10.00 |
| 638E07310 24" STEEL PIPE ENCASEMENT, BORED OR JACKED | 115 FT | $700 | $918 | $550 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 7 EACH | $8.00 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 307 FT | $12.50 | $11.00 | $11.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 26 FT | $14.00 | $12.50 | $12.50 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 1 EACH | $525 | $350 | $350 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $165 | $115 | $115 |
| 630E80100 SIGN, FLAT SHEET | 153.3 SF | $18.00 | $17.00 | $17.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 12 EACH | $10.00 | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 8 EACH | $65.00 | $65.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $15.00 | $30.00 | $30.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $20.00 | $20.00 |
| 644E00100 EDGE LINE, 4" | 0.07 MILE | $4,261 | $4,261 | $4,261 |
| 644E00200 LANE LINE, 4" | 0.03 MILE | $900 | $900 | $900 |
| 644E00300 CENTER LINE | 1.44 MILE | $6,872 | $6,872 | $6,872 |
| 644E00400 CHANNELIZING LINE, 8" | 739 FT | $1.64 | $1.64 | $1.64 |
| 644E00500 STOP LINE | 148 FT | $9.88 | $9.88 | $9.88 |
| 644E00600 CROSSWALK LINE | 682 FT | $4.94 | $4.94 | $4.94 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 86 FT | $6.73 | $6.73 | $6.73 |
| 644E01000 RAILROAD SYMBOL MARKING | 3 EACH | $448 | $448 | $448 |
| 644E01300 LANE ARROW | 32 EACH | $93.41 | $93.41 | $93.41 |
| 644E01400 WORD ON PAVEMENT, 72" | 3 EACH | $189 | $189 | $189 |
| 644E01500 DOTTED LINE, 4" | 274 FT | $1.28 | $1.28 | $1.28 |
| 625E25408 CONDUIT, 2", 725.051 | 21 FT | $15.00 | $10.87 | $10.87 |
| 625E25604 CONDUIT, 4", 725.051 | 12 FT | $26.00 | $26.94 | $26.94 |
| 625E25606 CONDUIT, 4", 725.052 | 80 FT | $25.00 | $13.57 | $13.57 |
| 625E29002 TRENCH, 24" DEEP | 33 FT | $8.00 | $12.25 | $12.25 |
| 625E29400 TRENCH IN PAVED AREA | 80 FT | $46.00 | $100 | $100 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,000 | $722 | $722 |
| 625E32000 GROUND ROD | 1 EACH | $250 | $236 | $236 |
| 631E97700 SIGN LIGHTING MISC.: REMOVAL AND REPLACEMENT OF L | 2 EACH | $6,400 | $6,336 | $6,336 |
| 632E20721 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, AS PER PLAN | 4 EACH | $595 | $580 | $580 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $325 | $258 | $258 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 400 FT | $3.00 | $3.02 | $3.02 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,600 | $1,004 | $1,004 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 1 EACH | $850 | $719 | $719 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE | 2 EACH | $250 | $207 | $207 |
| 633E99000 CONTROLLER ITEM, MISC.: MODIFY EXISTING CONTROLLE | 1 EACH | $2,500 | $1,692 | $1,692 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,000 | $18,000 | $10,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 102 SY | $25.00 | $23.00 | $23.00 |
| 517E76300 RAILING, MISC.: 1 1/2" NOMINAL DIAMETER PIPE RAIL | 77 FT | $94.00 | $545 | $560 |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 1,034 SF | $78.00 | $70.00 | $66.69 |
| 870E11000 WALL EXCAVATION | 90 CY | $100 | $65.00 | $83.65 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 233 FT | $10.00 | $50.00 | $10.84 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 95 FT | $14.00 | $30.00 | $17.51 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $650 | $800 | $1,000 |
| 870E15000 PMRW INSPECTION AND COMPACTION TESTING | 1 LS | $5,000 | $2,000 | $5,100 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $12,000 | $35,000 | $10,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $90.00 | $80.00 | $106 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,400 | $7,400 | $5,960 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,200 | $900 | $995 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.03 MILE | $2,870 | $2,870 | $2,870 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.27 MILE | $1,875 | $1,875 | $1,875 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.44 MILE | $3,145 | $3,145 | $3,145 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.03 MILE | $1,690 | $1,690 | $1,690 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.07 MILE | $3,045 | $3,045 | $3,045 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 150 FT | $0.55 | $0.55 | $0.55 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 730 FT | $0.50 | $0.50 | $0.50 |
| 614E24204 WORK ZONE DOTTED LINE, CLASS I, 8", 642 PAINT | 226 FT | $0.45 | $0.45 | $0.45 |
| 614E24614 WORK ZONE DOTTED LINE, CLASS III, 8", 642 PAINT | 274 FT | $0.40 | $0.40 | $0.40 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 114 FT | $2.30 | $2.30 | $2.30 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 81 FT | $2.50 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 148 FT | $2.40 | $2.40 | $2.40 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 682 FT | $2.10 | $2.10 | $2.10 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 14 EACH | $55.00 | $55.00 | $55.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 33 EACH | $50.00 | $50.00 | $50.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 4 EACH | $60.00 | $60.00 | $60.00 |
| 614E32200 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, 642 PA | 3 EACH | $350 | $350 | $350 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 3 EACH | $325 | $325 | $325 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 56 SF | $2.10 | $2.10 | $2.10 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT | 86 SF | $2.00 | $2.00 | $2.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $15,000 | $20,000 | $8,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 340 SY | $95.00 | $125 | $111 |
| 616E10000 WATER | 27 MGAL | $80.00 | $25.00 | $1.00 |
| 622E41101 PORTABLE BARRIER, UNANCHORED, AS PER PLAN | 80 FT | $32.00 | $12.00 | $20.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,000 | $7,450 | $2,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $51,000 | $28,000 | $78,029 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $300,000 | $431,594 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $90,000 | $94,000 | $4,831 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $70,000 | $56,000 | $61,256 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $12,000 | $18,000 | $6,952 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E17010 14" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 4,767 SY | $98 | $467k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,340 CY | $182 | $426k | 5% |
| 611E07400 18" CONDUIT, TYPE B | 2,550 FT | $110 | $281k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1177 CY | $230 | $271k | 3% |
| 638E11608 SPECIAL - 12" WATER MAIN DIP AND FITTINGS, CINCINN | 522 FT | $500 | $261k | 3% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (937 CY | $230 | $216k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 2% |
| 304E20000 AGGREGATE BASE | 2,716 CY | $68 | $185k | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,032 CY | $178 | $184k | 2% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 7,887 FT | $22 | $174k | 2% |