ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Tucson INC | R3Bog Construction INC | R4Alan Stone CO INC | R5Eclipse CO LLC | R6R C Construction Company And Son INC | R7Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E96301 14' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES | 76 FT | $1,100 | $1,400 | $1,400 | $1,300 | $1,291 | $1,525 | $2,850 | 22% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 266 CY | $237 | $214 | $125 | $316 | $219 | $185 | $261 | 16% |
| 203E20000 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Tucson INC | R3Bog Construction INC | R4Alan Stone CO INC | R5Eclipse CO LLC | R6R C Construction Company And Son INC | R7Craig Edward Susany INC |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 151 SY | $26.53 | $11.00 | $30.00 | $10.00 | $20.00 | $20.00 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 356 FT | $4.36 | $5.50 | $2.00 | $3.00 | $5.50 | $3.00 | $2.00 |
| 202E53100 MAILBOX REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,453 CY |
| $26.71 |
| $18.25 |
| $15.00 |
| $28.00 |
| $18.00 |
| $40.00 |
| $60.00 |
| 10% |
| 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN , 18" CONDUI | 75 FT | $416 | $506 | $1,070 | $420 | $1,303 | $777 | $800 | 8% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 164 CY | $164 | $154 | $155 | $171 | $171 | $150 | $138 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $19,853 | $14,000 | $20,000 | $38,500 | $25,000 | $16,500 | $20,000 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 31 CY | $619 | $1,000 | $475 | $626 | $655 | $675 | $1,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,468 | $14,500 | $3,500 | $7,200 | $11,581 | $65,000 | $10,000 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,267 | $9,720 | $8,500 | $9,900 | $8,684 | $12,500 | $10,000 | 3% |
| 203E10000 EXCAVATION | 409 CY | $22.61 | $12.00 | $20.00 | $18.00 | $19.50 | $25.00 | $30.00 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $2,282 | $575 | $500 | $2,200 | $700 | $100 | $2,000 | 2% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 8 CY | $1,121 | $1,000 | $900 | $1,600 | $3,780 | $675 | $1,600 | 2% |
| 304E20000 AGGREGATE BASE | 82 CY | $99.31 | $82.00 | $90.00 | $94.50 | $79.50 | $85.00 | $120 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,248 LB | $2.39 | $1.70 | $3.50 | $3.25 | $2.50 | $4.00 | $3.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,495 | $2,200 | $3,000 | $3,300 | $5,000 | $5,500 | $3,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 26 CY | $253 | $499 | $504 | $633 | $511 | $395 | $500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,539 | $7,300 | $10,000 | $4,100 | $10,500 | $35,000 | $20,000 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $6,528 | $6,900 | $25,000 | $12,000 | $5,101 | $12,500 | $15,000 | 2% |
| 611E07200 18" CONDUIT, TYPE A, 706.02, 707.33 or 21" CONDUIT | 31 FT | $207 | $64.00 | $100 | $275 | $93.50 | $210 | $150 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,973 SY | $3.14 | $3.50 | $4.00 | $3.50 | $3.00 | $5.00 | $6.00 | 2% |
| 1 EACH |
| $64.73 |
| $100 |
| $200 |
| $581 |
| $38.50 |
| $75.00 |
| $100 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12") | 83 FT | $21.44 | $47.00 | $38.00 | $50.00 | $33.00 | $125 | $100 |
| 202E75000 FENCE REMOVED | 293 FT | $2.39 | $5.00 | $5.00 | $2.50 | $5.50 | $10.00 | $5.00 |
| 202E98000 REMOVAL MISC.: PIPE PILING | 1 LS | $1,519 | $1,525 | $1,000 | $1,900 | $2,343 | $6,500 | $1,000 |
| 204E10000 SUBGRADE COMPACTION | 172 SY | $0.66 | $1.50 | $5.00 | $2.50 | $4.00 | $2.00 | $3.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $187 | $250 | $600 | $456 | $692 | $175 | $100 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 58 CY | $92.10 | $110 | $80.00 | $101 | $97.50 | $110 | $120 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $379 | $234 | $100 | $226 | $512 | $110 | $200 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $114 | $65.00 | $50.00 | $253 | $27.50 | $50.00 | $25.00 |
| 659E00300 TOPSOIL | 219 CY | $12.28 | $46.00 | $30.00 | $38.00 | $49.50 | $40.00 | $60.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 99 SY | $6.84 | $1.00 | $1.00 | $1.50 | $3.00 | $0.20 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $696 | $1,660 | $1,000 | $633 | $277 | $1,200 | $1,000 |
| 659E31000 LIME | 0.41 ACRE | $91.27 | $408 | $100 | $253 | $27.51 | $800 | $1,000 |
| 659E35000 WATER | 11 MGAL | $1.14 | $1.15 | $1.00 | $1.50 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,700 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.66 CY | $1,656 | $1,820 | $3,000 | $1,900 | $3,282 | $2,500 | $3,000 |
| 605E31100 AGGREGATE DRAINS | 55 FT | $31.81 | $25.00 | $15.00 | $10.50 | $12.00 | $10.00 | $10.00 |
| 407E10000 TACK COAT | 17 GAL | $3.42 | $2.20 | $5.00 | $3.00 | $2.00 | $10.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 72 GAL | $3.42 | $14.00 | $39.00 | $19.00 | $14.50 | $20.00 | $20.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 5 CY | $445 | $856 | $954 | $823 | $877 | $950 | $1,700 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (7 CY | $400 | $629 | $728 | $696 | $644 | $950 | $1,000 |
| 621E00100 RPM | 2 EACH | $1,711 | $1,010 | $1,000 | $1,200 | $1,036 | $1,500 | $1,300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $30.43 | $19.00 | $100 | $52.00 | $18.00 | $50.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $41.98 | $22.00 | $25.00 | $26.00 | $22.50 | $45.00 | $40.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 25.2 FT | $45.63 | $37.00 | $40.00 | $43.50 | $38.00 | $55.00 | $45.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $57.04 | $70.00 | $70.00 | $82.50 | $72.00 | $175 | $70.00 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $68.45 | $29.00 | $30.00 | $33.50 | $29.50 | $150 | $50.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $11.41 | $26.00 | $150 | $30.00 | $26.00 | $50.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $137 | $87.00 | $110 | $102 | $89.00 | $195 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $68.92 | $23.00 | $100 | $27.00 | $23.50 | $50.00 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.09 MILE | $22,245 | $30,705 | $30,000 | $36,000 | $31,459 | $25,000 | $35,000 |
| 646E10200 CENTER LINE | 0.01 MILE | $22,244 | $62,050 | $60,000 | $73,000 | $63,575 | $25,000 | $70,000 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 2 SNMT | $1,825 | $1,728 | $1,100 | $1,300 | $1,180 | $1,950 | $1,600 |
| 616E10000 WATER | 10 MGAL | $1.14 | $1.15 | $1.00 | $0.10 | $18.50 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,779 | $4,370 | $5,000 | $16,000 | $9,124 | $12,500 | $2,000 |
| 503E21104 UNCLASSIFIED EXCAVATION, INCLUDING ROCK (WINGWALL | 132 CY | $46.02 | $52.00 | $32.00 | $56.50 | $83.50 | $100 | $30.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,051 | $1,000 | $1,000 | $2,300 | $1,194 | $675 | $2,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 49 SY | $62.16 | $44.00 | $29.00 | $42.50 | $16.00 | $50.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 249 SY | $13.57 | $38.00 | $25.00 | $13.50 | $19.50 | $35.00 | $28.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 30 SF | $6.30 | $5.50 | $10.00 | $2.00 | $7.00 | $30.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $190 | $260 | $150 | $301 | $105 | $100 | $220 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,422 | $9,500 | $3,500 | $7,500 | $14,500 | $16,500 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96301 14' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES | 76 FT | $1,100 | $84k | 18% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 266 CY | $237.12 | $63k | 14% |
| 203E20000 EMBANKMENT | 1,453 CY | $26.71 | $39k | 9% |
| 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN , 18" CONDUI | 75 FT | $415.55 | $31k | 7% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 164 CY | $164.3 | $27k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $19,853 | $20k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 31 CY | $618.89 | $19k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,468 | $11k | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,267 | $10k | 2% |
| 203E10000 EXCAVATION | 409 CY | $22.61 | $9k | 2% |