MOE-Monroe Lake ODNR Slip Repair
MOE County · est $0.1M
Bid dateThursday, July 15—
MOE County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 16items by winning bid’s extended amount.
| Item | Quantity | R1Buds INC | R2Parker Corporation | R3Shecklers Excavating INC | R4R C Construction Company And Son INC | R5Mason Dixon Energy Services LLC | R6Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 272 CY | $94.00 | $125 | $129 | $100 | $80.00 | $173 | 52% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $5,000 | $2,323 | $2,500 | $3,964 | $3,000 | 6% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 21 CY | $128 | $125 | $76.89 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $125 |
| $80.00 |
| $190 |
| 5% |
| 203E10000 EXCAVATION | 65 CY | $40.00 | $20.00 | $37.56 | $20.00 | $185 | $55.00 | 5% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 18 CY | $125 | $10.00 | $129 | $110 | $85.00 | $230 | 5% |
| 611E05700 15" CONDUIT, TYPE A | 21 FT | $100 | $75.00 | $74.16 | $185 | $150 | $185 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $5,000 | $7,367 | $10,000 | $15,000 | $2,000 | 4% |
| 209E10000 DITCH CLEANOUT | 30 FT | $50.00 | $50.00 | $14.62 | $50.00 | $90.00 | $12.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $3,000 | $4,140 | $5,500 | $4,000 | $2,400 | 3% |
| 304E20000 AGGREGATE BASE | 9 CY | $125 | $125 | $134 | $125 | $80.00 | $200 | 2% |
| 602E20000 CONCRETE MASONRY | 0.27 CY | $4,000 | $3,000 | $3,111 | $2,500 | $450 | $4,500 | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,000 | $1,000 | $720 | $3,500 | $1,800 | $2,400 | 2% |
| 659E10000 SEEDING AND MULCHING | 73 SY | $11.00 | $7.00 | $4.85 | $50.00 | $30.00 | $25.00 | 2% |
| 202E20010 HEADWALL REMOVED | 1 EACH | $500 | $300 | $318 | $1,000 | $1,500 | $500 | 1% |
| 204E10000 SUBGRADE COMPACTION | 17 SY | $10.00 | $0.50 | $12.28 | $2.00 | $80.00 | $9.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 272 CY | $94 | $26k | 52% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $3k | 6% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 21 CY | $128 | $3k | 5% |
| 203E10000 EXCAVATION | 65 CY | $40 | $3k | 5% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 18 CY | $125 | $2k | 5% |
| 611E05700 15" CONDUIT, TYPE A | 21 FT | $100 | $2k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $2k | 4% |
| 209E10000 DITCH CLEANOUT | 30 FT | $50 | $2k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $2k | 3% |
| 304E20000 AGGREGATE BASE | 9 CY | $125 | $1k | 2% |