WOO-ODNR-Fort Meigs Resurface
WOO County · est $0.1M
Bid dateThursday, September 16—
WOO County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 8 more items below.
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Crestline Paving & Excavating CO INC | R3Gerken Paving INC | R4Scioto Valley Paving LLC | % of bid |
|---|---|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 550 FT | $24.00 | $21.50 | $20.80 | $40.00 | 16% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $3,300 | $2,950 | $2,840 | $3,300 | 16% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 42 CY | $253 | $350 | $350 | $220 | 13% |
| 659E00300 TOPSOIL | 63 CY | $130 | $50.00 | $95.00 | $130 | 10% |
| 304E20000 AGGREGATE BASE | 56 CY | $137 | $150 | $80.00 | $110 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 0.5" | 997 SY | $6.35 | $8.00 | $4.00 | $12.00 | 8% |
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Crestline Paving & Excavating CO INC | R3Gerken Paving INC | R4Scioto Valley Paving LLC |
|---|---|---|---|---|---|
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 1 EACH | $80.00 | $325 | $360 | $80.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 6 STA | $50.00 | $400 | $45.00 | $800 |
| 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL | 6 EACH | $8.75 | $7.75 | $7.50 | $35.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $300 | $750 | $270 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $5,300 | $5,000 | $12,000 | 6% |
| 203E10000 EXCAVATION | 45 CY | $104 | $125 | $49.00 | $65.00 | 6% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 574 SY | $5.20 | $2.00 | $4.95 | $3.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,600 | $2,500 | $20,000 | $1,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,200 | $1,500 | $750 | $3,500 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,000 | $3,500 | $5,500 | 1% |
| 832E30000 EROSION CONTROL | 800 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 642E01401 WORD ON PAVEMENT, 72", TYPE 1, AS PER PLAN | 2 EACH | $325 | $300 | $150 | $250 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $600 | $600 | $650 | $4,000 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 100 LB | $5.50 | $3.00 | $18.60 | $30.00 | 1% |
| 202E38700 GUARDRAIL POST REMOVED | 86 EACH | $5.50 | $20.00 | $5.00 | $75.00 | 1% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 22 FT | $20.00 | $20.00 | $12.00 | $22.00 | 1% |
| 642E01702 HANDICAP SYMBOL MARKING, TYPE 1 | 1 EACH | $325 | $300 | $150 | $100 | 0% |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 91 FT | $3.50 | $3.00 | $4.00 | $2.00 | 0% |
| 0.12 ACRE |
| $55.00 |
| $50.00 |
| $50.00 |
| $500 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 85 GAL | $2.00 | $10.00 | $1.95 | $5.00 |
| 630E80100 SIGN, FLAT SHEET | 9 SF | $23.00 | $20.00 | $24.00 | $12.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 550 FT | $24 | $13k | 16% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $3,300 | $13k | 16% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 42 CY | $252.5 | $11k | 13% |
| 659E00300 TOPSOIL | 63 CY | $130 | $8k | 10% |
| 304E20000 AGGREGATE BASE | 56 CY | $137 | $8k | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 0.5" | 997 SY | $6.35 | $6k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $5k | 6% |
| 203E10000 EXCAVATION | 45 CY | $104 | $5k | 6% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 574 SY | $5.2 | $3k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,600 | $3k | 3% |