COL-US 30-00.00
COL County · est $3.2M
Bid dateThursday, September 30—
COL County · est $3.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Superior Paving & Materials INC | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,636 CY | $160 | $168 | $155 | $170 | 32% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (7394 CY | $120 | $134 | $128 | $138 | 31% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $160,000 | $139,005 | $175,000 | $118,597 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 3/4") | 139,691 SY | $1.00 | $1.25 | $1.65 | $1.75 |
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Superior Paving & Materials INC | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 1,074 SY | $7.50 | $7.00 | $6.50 | $1.80 |
| 202E30000 WALK REMOVED | 113 SF | $8.00 | $40.00 | $12.00 | $6.00 |
| 209E60500 LINEAR GRADING | 1.33 MILE | $1,250 | $1,000 | $2,900 | $3,000 |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 40 FT | $5.00 | $20.00 | $3.50 | $3.00 |
| 608E52000 CURB RAMP |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $141,000 | $100,000 | $100,000 | 4% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $255 | $250 | $260 | $330 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,806 CY | $45.00 | $35.00 | $50.00 | $65.00 | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 300 CY | $240 | $260 | $300 | $345 | 3% |
| 253E02000 PAVEMENT REPAIR | 251 CY | $265 | $260 | $260 | $385 | 2% |
| 407E10000 TACK COAT | 21,543 GAL | $2.85 | $2.25 | $2.50 | $2.00 | 2% |
| 646E10010 EDGE LINE, 6" | 18.8 MILE | $2,800 | $2,800 | $2,800 | $2,800 | 2% |
| 646E10200 CENTER LINE | 9.4 MILE | $3,450 | $3,450 | $3,450 | $3,450 | 1% |
| 621E00100 RPM | 1,139 EACH | $24.50 | $29.40 | $24.50 | $24.50 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 8,669 GAL | $3.00 | $4.00 | $4.00 | $3.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 28.2 MILE | $850 | $1,150 | $1,150 | $1,150 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 18.47 MILE | $1,200 | $700 | $950 | $1,700 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 13,739 SY | $1.50 | $1.75 | $2.90 | $3.25 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 41 CF | $425 | $425 | $550 | $425 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 5.76 MILE | $2,800 | $5,500 | $6,800 | $5,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,530 | $15,000 | $17,600 | $4,780 | 1% |
| 107 SF |
| $25.00 |
| $45.00 |
| $36.50 |
| $35.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $380 | $250 | $380 | $380 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 4 EACH | $465 | $350 | $465 | $465 |
| 659E98000 SEEDING, MISC.: CURB RAMP GRADING RESTORATION | 4 SY | $100 | $125 | $50.00 | $140 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 250 FT | $7.00 | $25.00 | $9.00 | $21.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,500 | $1,200 | $1,050 | $1,200 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/4") | 4,045 SY | $3.25 | $1.60 | $2.70 | $6.00 |
| 617E20000 SHOULDER PREPARATION | 20,109 SY | $0.40 | $0.60 | $0.25 | $0.30 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 5.76 MILE | $1,500 | $1,100 | $1,010 | $1,450 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,139 EACH | $4.00 | $2.00 | $7.00 | $5.00 |
| 646E10400 STOP LINE | 107 FT | $15.00 | $15.00 | $15.00 | $15.00 |
| 646E10500 CROSSWALK LINE | 104 FT | $8.50 | $8.50 | $8.50 | $8.50 |
| 646E20000 RAILROAD SYMBOL MARKING | 4 EACH | $600 | $600 | $600 | $600 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 90 HOUR | $65.00 | $75.00 | $80.00 | $70.00 |
| 614E12460 WORK ZONE MARKING SIGN | 117 EACH | $45.00 | $55.00 | $55.00 | $55.00 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 28.2 MILE | $375 | $500 | $505 | $500 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 321 FT | $2.00 | $3.50 | $3.50 | $3.50 |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 30 CF | $425 | $425 | $550 | $425 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 33 CF | $425 | $425 | $550 | $425 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $12,500 | $7,500 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,636 CY | $160 | $902k | 31% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (7394 CY | $119.5 | $884k | 30% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $160,000 | $160k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 3/4") | 139,691 SY | $1 | $140k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $255 | $96k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,806 CY | $45 | $81k | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 300 CY | $240 | $72k | 2% |
| 253E02000 PAVEMENT REPAIR | 251 CY | $265 | $67k | 2% |
| 407E10000 TACK COAT | 21,543 GAL | $2.85 | $61k | 2% |