POR-SR 14-12.96
POR County · est $3.2M
Bid dateThursday, October 28—
POR County · est $3.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 125 more items below.
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Ruhlin Company | R3Shelly & Sands INC | R4J D Williamson Construction CO INC | R5Great Lakes Construction CO | R6Chagrin Valley Paving INC | R7Suburban Maintenance & Construction | R8INC Clearwater Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 446 CY | $680 | $810 | $825 | $600 | $645 | $950 | $720 | $1,100 | 15% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $213,700 | $100,000 |
| Item | Quantity | R1Marucci & Gaffney Excavating CO | R2Ruhlin Company | R3Shelly & Sands INC | R4J D Williamson Construction CO INC | R5Great Lakes Construction CO | R6Chagrin Valley Paving INC | R7Suburban Maintenance & Construction | R8INC Clearwater Construction INC |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $15,000 | $1,500 | $5,000 | $45,000 | $3,000 | $5,000 | $20,000 |
| 202E38000 GUARDRAIL REMOVED | 444 FT | $2.00 | $1.55 | $2.00 | $1.75 | $1.55 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $375,000 |
| $398,270 |
| $280,000 |
| $375,000 |
| $785,000 |
| 12% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 176,929 LB | $1.33 | $1.30 | $1.30 | $1.30 | $1.35 | $1.20 | $1.35 | $1.50 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $105,000 | $120,000 | $95,000 | $50,000 | $50,000 | $150,000 | $350,000 | 6% |
| 513E95030 STRUCTURAL STEEL, MISC.: BEAM RETROFIT PLATES | 96 EACH | $1,225 | $1,825 | $1,750 | $1,600 | $1,200 | $1,500 | $900 | $1,250 | 6% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 2,845 SF | $40.00 | $50.00 | $42.00 | $41.00 | $40.00 | $16.00 | $25.00 | $25.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | $105,600 | $100,000 | $100,000 | 5% |
| 625E13400 LIGHT TOWER, BBBBBB100 | 4 EACH | $24,500 | $24,000 | $25,000 | $24,500 | $24,500 | $27,965 | $24,250 | $24,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 662 CY | $145 | $145 | $162 | $165 | $145 | $206 | $145 | $145 | 5% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 2,320 SF | $40.00 | $7.00 | $5.30 | $5.15 | $5.00 | $4.00 | $5.00 | $6.00 | 5% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 359 SY | $215 | $250 | $300 | $260 | $355 | $280 | $300 | $450 | 4% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM (SEE PROPOSA | 1,980 SF | $35.00 | $25.00 | $35.00 | $48.00 | $25.00 | $25.00 | $42.00 | $20.00 | 3% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $62,000 | $25,000 | $75,000 | $175,000 | $91,000 | $75,000 | $225,000 | $111,500 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,482 FT | $20.00 | $14.00 | $15.00 | $13.00 | $18.00 | $20.00 | $37.00 | $37.50 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 202 CY | $245 | $245 | $260 | $190 | $245 | $304 | $245 | $245 | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (202 CY | $245 | $245 | $224 | $180 | $245 | $303 | $245 | $245 | 2% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 80 CY | $600 | $455 | $480 | $700 | $610 | $795 | $925 | $1,100 | 2% |
| 304E20000 AGGREGATE BASE | 449 CY | $89.00 | $110 | $64.00 | $62.50 | $75.00 | $95.00 | $68.00 | $100 | 2% |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 69 CY | $550 | $667 | $750 | $435 | $515 | $750 | $1,050 | $750 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 2,474 SY | $15.00 | $9.00 | $6.00 | $10.00 | $8.00 | $6.00 | $8.00 | $10.00 | 2% |
| $3.00 |
| $2.80 |
| $3.00 |
| 203E10000 EXCAVATION | 130 CY | $25.00 | $19.00 | $27.00 | $21.25 | $15.00 | $40.00 | $25.00 | $50.00 |
| 203E20000 EMBANKMENT | 267 CY | $20.00 | $21.00 | $19.00 | $23.00 | $25.00 | $45.00 | $22.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 2,701 SY | $2.00 | $5.00 | $4.00 | $3.50 | $3.00 | $3.00 | $3.00 | $8.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 80 CY | $15.00 | $30.00 | $30.00 | $20.00 | $25.00 | $45.00 | $25.00 | $30.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 80 CY | $40.00 | $66.00 | $70.00 | $58.00 | $55.00 | $60.00 | $68.00 | $80.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $685 | $217 | $320 | $325 | $150 | $225 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 239 SY | $3.00 | $1.50 | $1.50 | $2.25 | $2.00 | $40.00 | $1.80 | $4.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 363 FT | $23.60 | $23.60 | $25.00 | $24.50 | $23.60 | $25.00 | $25.00 | $25.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 3 EACH | $2,885 | $2,885 | $3,000 | $3,000 | $2,885 | $300 | $2,225 | $2,225 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,340 | $1,340 | $1,400 | $1,400 | $1,340 | $1,400 | $2,175 | $2,175 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,425 | $2,425 | $2,400 | $2,500 | $2,425 | $2,600 | $1,825 | $1,825 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 19 SY | $100 | $100 | $98.00 | $140 | $120 | $150 | $80.00 | $65.00 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 24 SY | $100 | $117 | $62.00 | $85.00 | $95.00 | $100 | $75.00 | $65.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 4 CY | $100 | $550 | $345 | $105 | $200 | $150 | $390 | $200 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $10.00 | $146 | $125 | $50.00 | $100 | $250 | $100 | $25.00 |
| 659E00300 TOPSOIL | 257 CY | $35.00 | $33.53 | $25.00 | $45.00 | $32.00 | $65.00 | $44.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 1,652 SY | $2.50 | $1.46 | $1.50 | $1.00 | $2.75 | $6.00 | $1.00 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 83 SY | $0.10 | $0.68 | $0.75 | $3.00 | $0.85 | $6.00 | $3.00 | $3.00 |
| 659E15000 INTER-SEEDING | 83 SY | $0.10 | $0.68 | $0.75 | $0.50 | $0.15 | $6.00 | $0.10 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.23 TON | $400 | $648 | $600 | $1,000 | $440 | $800 | $1,000 | $1,000 |
| 659E31000 LIME | 0.34 ACRE | $50.00 | $154 | $150 | $30.00 | $70.00 | $300 | $0.09 | $0.00 |
| 659E35000 WATER | 9 MGAL | $0.10 | $1.00 | $1.00 | $5.00 | $1.00 | $20.00 | $0.10 | $0.01 |
| 670E00700 DITCH EROSION PROTECTION | 670 SY | $3.00 | $1.32 | $2.00 | $2.50 | $2.50 | $65.00 | $2.25 | $2.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,450 | $1,425 | $1,500 | $4,500 | $1,500 | $1,800 | $5,000 | $5,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,080 | $5,440 | $7,200 | $8,500 | $6,000 | $10,000 | $8,000 | $3,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,000 | $8,549 | $12,500 | $11,500 | $10,000 | $4,000 | $11,000 | $1,500 |
| 832E30000 EROSION CONTROL | 16,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $1,900 | $3,800 | $3,500 | $3,000 | $3,800 | $4,000 | $500 | $2,500 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 926 FT | $20.00 | $21.00 | $18.00 | $14.50 | $16.50 | $10.00 | $25.00 | $20.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 250 FT | $22.00 | $25.00 | $15.00 | $15.50 | $16.50 | $15.00 | $25.00 | $25.00 |
| 611E00200 4" CONDUIT, TYPE C | 80 FT | $4.00 | $27.00 | $22.00 | $16.25 | $21.25 | $20.00 | $12.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $6.00 | $40.00 | $22.00 | $24.00 | $23.50 | $22.00 | $15.00 | $20.00 |
| 611E04600 12" CONDUIT, TYPE C | 53 FT | $80.00 | $60.00 | $50.00 | $43.00 | $105 | $45.00 | $30.00 | $100 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,500 | $3,492 | $2,700 | $2,200 | $2,890 | $4,000 | $1,850 | $3,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 14 EACH | $200 | $315 | $200 | $310 | $345 | $350 | $200 | $1,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE- 3" | 2,232 SY | $7.00 | $7.00 | $18.50 | $4.10 | $7.00 | $16.74 | $7.00 | $7.85 |
| 407E20000 NON-TRACKING TACK COAT | 890 GAL | $3.00 | $3.00 | $3.00 | $4.15 | $3.00 | $5.00 | $3.00 | $3.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 100 GAL | $20.00 | $20.00 | $3.00 | $5.15 | $10.00 | $10.70 | $3.00 | $3.00 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (7 CY | $200 | $200 | $400 | $332 | $200 | $381 | $200 | $200 |
| 609E24000 CURB, TYPE 4-A | 102 FT | $25.00 | $35.00 | $50.00 | $31.00 | $15.00 | $65.00 | $25.00 | $20.00 |
| 609E26000 CURB, TYPE 6 | 88 FT | $35.00 | $33.00 | $40.00 | $30.00 | $45.00 | $70.00 | $45.00 | $25.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 15 CY | $100 | $150 | $250 | $80.00 | $270 | $446 | $390 | $100 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 24 EACH | $95.00 | $90.00 | $100 | $92.00 | $95.00 | $98.00 | $95.00 | $90.00 |
| 625E15100 LIGHT TOWER FOUNDATION, 36" X 20' DEEP | 3 EACH | $8,000 | $8,750 | $8,500 | $9,000 | $8,000 | $8,888 | $7,850 | $8,750 |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 1 EACH | $8,250 | $9,850 | $8,700 | $10,000 | $8,250 | $9,700 | $8,250 | $9,850 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 573 FT | $3.00 | $3.40 | $3.00 | $3.50 | $3.00 | $4.26 | $3.00 | $3.40 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 2,364 FT | $8.00 | $9.30 | $8.00 | $9.50 | $8.00 | $7.25 | $6.75 | $9.30 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 4" | 161 FT | $60.00 | $79.00 | $63.00 | $81.00 | $60.00 | $96.00 | $60.00 | $79.00 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 24 EACH | $1,300 | $1,250 | $1,300 | $1,300 | $1,300 | $1,675 | $1,300 | $1,250 |
| 625E29000 TRENCH | 2,274 FT | $5.00 | $7.50 | $5.00 | $7.75 | $5.00 | $11.25 | $5.00 | $7.50 |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $1,000 | $1,065 | $1,000 | $1,100 | $1,000 | $1,025 | $1,000 | $1,065 |
| 625E32000 GROUND ROD | 8 EACH | $200 | $265 | $200 | $270 | $200 | $250 | $200 | $265 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,500 | $6,400 | $6,800 | $6,550 | $6,500 | $5,600 | $6,000 | $6,400 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 2,274 FT | $0.10 | $0.40 | $0.10 | $0.50 | $0.10 | $0.80 | $1.00 | $0.40 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL SR 5/14 | 1 EACH | $250 | $2,200 | $265 | $2,250 | $250 | $1,400 | $250 | $2,200 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $500 | $383 | $530 | $400 | $500 | $915 | $500 | $393 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 30 FT | $16.00 | $15.90 | $7.00 | $16.25 | $6.85 | $18.00 | $14.00 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 32 FT | $16.50 | $16.50 | $11.00 | $17.00 | $10.25 | $19.00 | $15.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 4 SF | $25.00 | $25.00 | $16.00 | $26.00 | $14.85 | $30.00 | $50.00 | $50.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $10.00 | $10.00 | $24.00 | $10.50 | $22.75 | $20.00 | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $60.00 | $60.00 | $480 | $61.50 | $450 | $75.00 | $85.00 | $85.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $15.00 | $15.00 | $30.00 | $15.50 | $28.50 | $20.00 | $35.00 | $35.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.39 MILE | $2,005 | $2,005 | $3,300 | $2,600 | $3,180 | $2,100 | $2,005 | $2,005 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.36 MILE | $505 | $505 | $3,000 | $1,000 | $2,830 | $600 | $505 | $505 |
| 642E00300 CENTER LINE, TYPE 1 | 0.25 MILE | $4,010 | $4,010 | $5,500 | $3,600 | $5,235 | $4,500 | $4,010 | $4,010 |
| 642E00500 STOP LINE, TYPE 1 | 28 FT | $2.80 | $2.80 | $4.00 | $4.10 | $3.60 | $4.00 | $2.80 | $2.80 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $65.00 | $70.00 | $75.00 | $75.00 | $75.00 | $90.00 | $72.00 | $67.50 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,000 | $1,945 | $2,100 | $2,050 | $1,985 | $2,100 | $2,500 | $2,100 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $5,730 | $1,700 | $3,600 | $1,665 | $6,100 | $10,000 | $5,730 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $150 | $344 | $360 | $300 | $300 | $500 | $120 | $600 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 62 EACH | $20.00 | $12.00 | $9.00 | $10.00 | $16.00 | $15.00 | $12.00 | $12.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $750 | $750 | $800 | $800 | $730 | $1,100 | $850 | $750 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.35 MILE | $400 | $400 | $1,500 | $1,500 | $1,405 | $500 | $400 | $400 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.79 MILE | $3,820 | $3,820 | $1,200 | $1,200 | $1,140 | $4,000 | $3,820 | $3,820 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.24 MILE | $3,110 | $3,110 | $1,800 | $1,800 | $1,700 | $4,000 | $3,110 | $3,110 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 2.16 MILE | $1,910 | $1,910 | $850 | $825 | $805 | $2,000 | $1,910 | $1,910 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.38 MILE | $1,555 | $1,555 | $1,600 | $1,600 | $1,520 | $2,000 | $1,555 | $1,555 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 155 FT | $0.80 | $0.80 | $0.75 | $0.70 | $0.65 | $1.00 | $0.80 | $0.80 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,486 FT | $0.75 | $0.75 | $0.60 | $0.65 | $0.60 | $1.00 | $0.75 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 31 FT | $2.80 | $2.80 | $3.00 | $3.05 | $3.00 | $3.50 | $2.80 | $2.80 |
| 614E30000 WORK ZONE ARROW, CLASS I | 6 EACH | $85.00 | $85.00 | $70.00 | $66.50 | $65.00 | $100 | $85.00 | $85.00 |
| 616E10000 WATER | 8 MGAL | $0.10 | $90.00 | $50.00 | $5.25 | $70.00 | $20.00 | $1.00 | $100 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 538 FT | $25.00 | $16.50 | $25.00 | $18.00 | $25.00 | $21.00 | $40.00 | $40.50 |
| 202E22900 APPROACH SLAB REMOVED | 306 SY | $20.00 | $35.00 | $25.00 | $30.00 | $50.00 | $40.00 | $60.00 | $50.00 |
| 202E23500 WEARING COURSE REMOVED | 1,862 SY | $2.00 | $4.00 | $4.00 | $5.75 | $4.50 | $16.74 | $6.00 | $9.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $20,000 | $22,500 | $35,000 | $43,000 | $16,000 | $25,000 | $50,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 130 CY | $80.00 | $230 | $90.00 | $175 | $130 | $165 | $22.00 | $25.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.20 | $4.25 | $2.00 | $2.15 | $5.50 | $5.00 | $5.00 | $20.00 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 8,092 FT | $1.52 | $1.75 | $2.00 | $1.50 | $1.50 | $7.00 | $1.60 | $4.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 822 EACH | $25.00 | $23.00 | $21.00 | $21.00 | $25.00 | $20.00 | $16.00 | $25.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,500 | $3,800 | $3,500 | $2,100 | $5,800 | $3,600 | $3,500 | $5,000 |
| 511E43212 CLASS QC1 CONCRETE WITH QC/QA, PIER | 33 CY | $1,100 | $1,275 | $3,000 | $1,000 | $1,075 | $1,500 | $2,200 | $1,550 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 58 CY | $450 | $820 | $1,750 | $600 | $1,165 | $1,050 | $850 | $1,550 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 1,272 SY | $20.00 | $18.00 | $22.00 | $23.00 | $18.00 | $25.00 | $25.00 | $25.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 100 FT | $150 | $35.00 | $70.00 | $60.00 | $35.00 | $70.00 | $70.00 | $70.00 |
| 512E33000 TYPE 2 WATERPROOFING | 57 SY | $30.00 | $27.00 | $21.00 | $30.00 | $30.00 | $30.00 | $30.00 | $55.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 542 SY | $19.00 | $35.00 | $25.00 | $40.00 | $35.00 | $22.00 | $23.00 | $20.00 |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,192 LB | $9.21 | $8.50 | $9.00 | $7.20 | $9.00 | $7.90 | $12.00 | $10.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 6,928 EACH | $3.50 | $3.50 | $3.00 | $3.60 | $4.50 | $4.75 | $3.70 | $7.00 |
| 513E95020 STRUCTURAL STEEL, MISC.: BEAM END REPAIR | 1 LS | $13,500 | $10,000 | $16,000 | $20,000 | $17,400 | $18,000 | $10,500 | $20,000 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 2,845 SF | $10.00 | $5.00 | $16.00 | $15.50 | $15.00 | $16.00 | $5.00 | $10.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 2,320 SF | $10.00 | $7.00 | $16.00 | $15.50 | $15.00 | $6.00 | $5.00 | $6.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 15 MNHR | $100 | $100 | $132 | $130 | $125 | $175 | $85.00 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 10 EACH | $300 | $600 | $400 | $410 | $400 | $300 | $125 | $100 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 132 FT | $35.00 | $33.00 | $63.00 | $28.00 | $85.00 | $35.00 | $55.00 | $75.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 17 SF | $10.00 | $5.50 | $10.00 | $7.50 | $15.00 | $35.00 | $6.00 | $15.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 205 SF | $15.00 | $7.00 | $9.00 | $7.50 | $15.00 | $18.00 | $12.00 | $10.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 155 FT | $30.00 | $30.00 | $36.00 | $50.00 | $30.00 | $35.00 | $45.00 | $60.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $1,750 | $2,000 | $1,500 | $1,500 | $1,730 | $1,850 | $1,850 | $2,500 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 24 EACH | $1,375 | $1,600 | $1,400 | $1,200 | $1,275 | $1,265 | $1,500 | $1,850 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 98 CY | $85.00 | $90.00 | $80.00 | $90.00 | $125 | $110 | $90.00 | $100 |
| 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN | 167 FT | $10.00 | $14.00 | $5.00 | $17.50 | $15.00 | $22.00 | $8.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 130 FT | $10.00 | $20.00 | $13.00 | $17.50 | $30.00 | $26.00 | $8.00 | $20.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 220 SF | $120 | $90.00 | $125 | $100 | $90.00 | $90.00 | $85.00 | $125 |
| 526E90030 TYPE C INSTALLATION | 131 FT | $160 | $200 | $246 | $126 | $205 | $160 | $220 | $250 |
| 530E01300 SPECIAL - STRUCTURES, REMOVAL OF ASBESTOS CONTAINI | 1,540 FT | $16.00 | $25.00 | $13.00 | $16.50 | $15.00 | $25.00 | $29.00 | $25.00 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 100 SY | $65.00 | $25.00 | $39.00 | $37.00 | $35.00 | $90.00 | $75.00 | $50.00 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 350 FT | $90.00 | $94.00 | $90.00 | $100 | $94.00 | $90.00 | $106 | $106 |
| 690E98400 SPECIAL - DOMINION ENERGY OHIO STABLIZER AND SUPPO | 1 LS | $6,000 | $10,000 | $11,500 | $12,500 | $25,000 | $13,000 | $5,000 | $75,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,000 | $22,000 | $31,000 | $40,000 | $40,000 | $35,000 | $50,000 | $50,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,000 | $2,700 | $2,600 | $1,500 | $2,900 | $2,000 | $2,200 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,360 | $31,000 | $45,000 | $17,500 | $25,000 | $17,000 | $35,000 | $15,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $1,000 | $2,500 | $3,000 | $6,000 | $1,000 | $4,000 | $980 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 446 CY | $680 | $303k | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $250,000 | $250k | 8% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 176,929 LB | $1.33 | $235k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 4% |
| 513E95030 STRUCTURAL STEEL, MISC.: BEAM RETROFIT PLATES | 96 EACH | $1,225 | $118k | 4% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 2,845 SF | $40 | $114k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 625E13400 LIGHT TOWER, BBBBBB100 | 4 EACH | $24,500 | $98k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 662 CY | $145 | $96k | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 2,320 SF | $40 | $93k | 3% |