BRO-SR 221-05.47
BRO County · est $3.9M
Bid dateThursday, October 14—
BRO County · est $3.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 96 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Shelly & Sands INC | R4Great Lakes Construction CO | R5George J Igel & CO INC | R6Allard Excavation LLC | R7Sunesis Construction CO | R8Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 439,543 LB | $2.45 | $2.73 | $2.56 | $2.90 | $2.70 | $2.83 | $3.27 | $3.49 | 40% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 291 CY | $800 | $900 | $1,050 | $980 |
| Item | Quantity | R1Complete General Construction Company | R2Eagle Bridge CO | R3Shelly & Sands INC | R4Great Lakes Construction CO | R5George J Igel & CO INC | R6Allard Excavation LLC | R7Sunesis Construction CO | R8Kokosing Construction Company INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 1,705 SY | $8.65 | $5.00 | $4.00 | $15.00 | $8.00 | $7.80 | $8.13 | $8.00 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 66 SY | $19.00 | $16.00 | $7.00 | $25.00 | $17.00 | $3.25 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $990 |
| $790 |
| $1,138 |
| $950 |
| 9% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 107,367 LB | $1.35 | $1.25 | $1.25 | $1.50 | $1.45 | $2.55 | $1.36 | $1.30 | 5% |
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 36,372 LB | $3.07 | $3.34 | $3.21 | $2.65 | $3.40 | $3.38 | $2.52 | $3.49 | 4% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 111 CY | $1,000 | $900 | $1,100 | $900 | $1,200 | $1,055 | $1,105 | $1,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | $250,000 | $62,792 | $100,000 | 4% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 99 CY | $1,000 | $550 | $975 | $850 | $682 | $630 | $994 | $1,100 | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $90,000 | $80,000 | $120,000 | $89,000 | $200,000 | $172,345 | $192,985 | $80,000 | 3% |
| 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK | 199 FT | $450 | $475 | $430 | $560 | $340 | $406 | $541 | $625 | 3% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $80,000 | $80,000 | $126,500 | $50,000 | $150,000 | $64,819 | $191,438 | $78,000 | 3% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 810 CY | $90.00 | $80.00 | $100 | $94.00 | $120 | $75.00 | $110 | $120 | 3% |
| 203E10000 EXCAVATION | 5,788 CY | $12.00 | $17.00 | $12.00 | $18.50 | $26.00 | $14.35 | $25.05 | $24.00 | 3% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 223 SY | $300 | $300 | $275 | $330 | $305 | $321 | $343 | $290 | 2% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 86 CY | $750 | $700 | $525 | $675 | $605 | $536 | $1,175 | $575 | 2% |
| 601E12000 RIPRAP, WITH GROUT | 630 SY | $95.00 | $125 | $125 | $130 | $70.00 | $44.25 | $73.52 | $140 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 217 CY | $237 | $205 | $237 | $205 | $240 | $227 | $227 | $200 | 2% |
| 503E31120 SHALE EXCAVATION | 2,325 CY | $20.00 | $17.00 | $18.00 | $19.00 | $35.00 | $27.00 | $62.57 | $30.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $45,000 | $40,000 | $44,000 | $50,000 | $60,000 | $66,025 | $43,300 | $57,500 | 2% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 83 CY | $475 | $400 | $665 | $500 | $505 | $428 | $477 | $750 | 1% |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 7,439 FT | $5.00 | $2.25 | $1.00 | $1.35 | $1.40 | $2.90 | $1.93 | $1.10 | 1% |
| $12.27 |
| $30.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 24 FT | $21.00 | $7.00 | $10.00 | $20.00 | $10.00 | $5.50 | $11.14 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 345 FT | $7.00 | $3.50 | $2.50 | $4.76 | $1.80 | $2.50 | $5.01 | $7.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $100 | $50.00 | $20.00 | $125 | $80.00 | $25.00 | $68.27 | $70.00 |
| 202E75000 FENCE REMOVED | 819 FT | $5.00 | $3.00 | $3.50 | $3.50 | $1.50 | $1.65 | $2.21 | $2.50 |
| 202E75250 GATE REMOVED | 2 EACH | $500 | $250 | $250 | $85.00 | $152 | $64.00 | $49.75 | $150 |
| 203E20000 EMBANKMENT | 275 CY | $13.00 | $6.00 | $12.00 | $18.50 | $16.00 | $5.85 | $12.41 | $12.00 |
| 204E10000 SUBGRADE COMPACTION | 2,041 SY | $4.25 | $3.00 | $5.00 | $1.60 | $4.00 | $2.50 | $2.65 | $5.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 499 CY | $20.00 | $17.00 | $20.00 | $26.00 | $25.00 | $14.75 | $27.31 | $35.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 499 CY | $52.00 | $52.00 | $55.00 | $58.00 | $50.00 | $50.50 | $64.49 | $60.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $110 | $225 | $200 | $300 | $80.00 | $95.00 | $236 | $250 |
| 606E15050 GUARDRAIL, TYPE MGS | 112.5 FT | $27.25 | $43.20 | $25.00 | $43.20 | $25.20 | $43.20 | $43.20 | $27.25 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,300 | $2,100 | $2,000 | $2,100 | $2,160 | $2,100 | $2,100 | $2,300 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,750 | $2,400 | $2,500 | $2,400 | $2,930 | $2,400 | $2,400 | $2,750 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,340 | $1,260 | $1,100 | $1,260 | $1,285 | $1,260 | $1,260 | $1,340 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,525 | $1,990 | $2,500 | $1,990 | $2,745 | $1,990 | $1,990 | $2,525 |
| 607E98000 FENCE, MISC.: TEMPORARY TYPE 47 FENCE | 125 FT | $25.00 | $30.00 | $25.00 | $35.00 | $34.50 | $22.27 | $20.00 | $45.00 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $1,068 | $1,500 | $1,300 | $650 | $1,500 | $625 | $719 | $998 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $150 | $200 | $135 | $100 | $195 | $150 | $84.34 | $519 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 22 SY | $68.00 | $85.00 | $80.00 | $95.00 | $120 | $70.00 | $110 | $130 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 107 CY | $96.00 | $110 | $120 | $125 | $100 | $82.00 | $111 | $110 |
| 659E00300 TOPSOIL | 126 CY | $40.00 | $40.00 | $55.00 | $45.00 | $28.00 | $21.00 | $23.34 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 6,793 SY | $1.04 | $1.50 | $0.85 | $1.04 | $2.00 | $1.04 | $1.99 | $0.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 340 SY | $2.00 | $1.50 | $0.80 | $2.00 | $0.80 | $2.00 | $2.00 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.95 TON | $800 | $1,250 | $800 | $800 | $800 | $800 | $800 | $800 |
| 659E31000 LIME | 1.4 ACRE | $75.00 | $10.00 | $80.00 | $75.00 | $80.00 | $75.00 | $75.00 | $80.00 |
| 659E35000 WATER | 47 MGAL | $2.00 | $15.00 | $1.00 | $2.00 | $1.00 | $2.00 | $2.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,128 SY | $4.00 | $2.50 | $2.00 | $4.00 | $2.00 | $4.00 | $4.00 | $2.00 |
| 670E00700 DITCH EROSION PROTECTION | 103 SY | $2.00 | $2.50 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,750 | $2,500 | $3,000 | $1,425 | $1,425 | $1,425 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,600 | $12,500 | $7,500 | $8,000 | $6,500 | $7,590 | $5,520 | $15,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $4,500 | $8,000 | $3,350 | $7,600 | $7,900 | $7,875 | $12,000 |
| 832E30000 EROSION CONTROL | 11,684 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1.1 CY | $4,800 | $2,500 | $9,800 | $2,700 | $2,100 | $5,900 | $3,049 | $2,500 |
| 605E31100 AGGREGATE DRAINS | 200 FT | $12.00 | $10.00 | $15.00 | $19.00 | $16.00 | $12.25 | $10.24 | $11.00 |
| 611E04900 12" CONDUIT, TYPE D | 35 FT | $56.00 | $35.00 | $50.00 | $85.00 | $60.00 | $58.00 | $52.27 | $70.00 |
| 611E07900 18" CONDUIT, TYPE D | 40 FT | $74.00 | $45.00 | $55.00 | $90.00 | $75.00 | $57.00 | $81.81 | $70.00 |
| 304E20000 AGGREGATE BASE | 380 CY | $90.00 | $65.00 | $55.00 | $77.00 | $60.00 | $49.50 | $63.87 | $120 |
| 407E10000 TACK COAT | 196 GAL | $10.00 | $1.00 | $10.00 | $1.00 | $1.85 | $10.24 | $10.24 | $5.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 140 CY | $250 | $240 | $250 | $240 | $290 | $231 | $231 | $300 |
| 609E24510 CURB, TYPE 4-C | 38 FT | $59.00 | $45.00 | $55.00 | $60.00 | $42.00 | $46.75 | $61.01 | $60.00 |
| 620E31200 REMOVAL OF DELINEATOR | 14 EACH | $20.00 | $4.00 | $5.00 | $5.57 | $8.50 | $5.00 | $4.88 | $10.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL) | 15 EACH | $13.50 | $10.00 | $15.00 | $10.00 | $7.60 | $10.00 | $10.50 | $13.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 197.7 FT | $14.00 | $10.00 | $17.50 | $10.00 | $15.00 | $10.00 | $10.00 | $15.50 |
| 630E08600 SIGN POST REFLECTOR | 6 EACH | $28.50 | $25.00 | $45.00 | $25.00 | $45.00 | $25.00 | $25.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 73.8 SF | $19.50 | $28.00 | $20.00 | $28.00 | $22.50 | $28.00 | $28.00 | $16.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 15 EACH | $30.00 | $20.00 | $20.00 | $20.00 | $10.00 | $20.00 | $20.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $100 | $60.00 | $65.00 | $60.00 | $65.00 | $60.00 | $60.00 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 16 EACH | $35.00 | $20.00 | $20.00 | $20.00 | $15.00 | $20.00 | $20.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.33 MILE | $3,030 | $3,150 | $4,500 | $3,030 | $3,030 | $4,500 | $3,150 | $3,030 |
| 642E00300 CENTER LINE, TYPE 1 | 0.16 MILE | $5,900 | $5,885 | $8,500 | $5,889 | $5,889 | $8,500 | $5,885 | $5,889 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $2,100 | $2,350 | $2,100 | $3,620 | $1,900 | $2,100 | $6,542 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 3 CY | $550 | $750 | $450 | $500 | $320 | $406 | $458 | $500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 14 EACH | $11.00 | $7.00 | $6.00 | $15.00 | $12.00 | $15.00 | $15.00 | $14.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 6 EACH | $14.00 | $15.00 | $20.00 | $16.00 | $20.00 | $15.00 | $16.00 | $25.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 14 EACH | $15.00 | $15.00 | $20.00 | $21.00 | $21.00 | $15.00 | $21.00 | $9.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 525 FT | $36.00 | $33.00 | $25.00 | $24.00 | $41.00 | $21.63 | $26.96 | $40.00 |
| 503E31120 SHALE EXCAVATION | 37 CY | $130 | $105 | $25.00 | $100 | $62.00 | $21.00 | $81.90 | $50.00 |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W12X72 | 396 FT | $92.00 | $70.00 | $65.00 | $58.00 | $75.00 | $64.77 | $71.69 | $110 |
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W18X97 | 250 FT | $118 | $95.00 | $90.00 | $78.00 | $95.00 | $90.59 | $97.56 | $140 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 16,429 LB | $1.35 | $1.25 | $1.25 | $1.28 | $1.50 | $3.56 | $1.36 | $1.50 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 247 SY | $22.50 | $19.00 | $22.50 | $19.00 | $19.00 | $19.00 | $22.50 | $19.00 |
| 512E33001 TYPE 2 WATERPROOFING, AS PER PLAN | 42 SY | $40.00 | $24.00 | $40.00 | $24.00 | $44.00 | $24.00 | $40.00 | $24.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 944 EACH | $9.00 | $8.00 | $4.00 | $6.74 | $5.00 | $6.65 | $14.35 | $13.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 40 SF | $9.50 | $6.00 | $8.00 | $12.00 | $12.00 | $3.80 | $3.69 | $8.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 331 SY | $20.00 | $25.00 | $32.00 | $27.00 | $30.00 | $23.50 | $25.97 | $35.00 |
| 518E21100 POROUS BACKFILL | 18 CY | $95.00 | $110 | $160 | $145 | $130 | $295 | $67.78 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 240 FT | $9.00 | $10.00 | $6.00 | $13.00 | $11.00 | $7.00 | $19.27 | $16.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 10 FT | $35.00 | $15.00 | $25.00 | $30.00 | $16.00 | $11.00 | $5.83 | $50.00 |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 117 FT | $110 | $85.00 | $75.00 | $80.00 | $50.00 | $84.40 | $65.84 | $100 |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 289 FT | $120 | $85.00 | $85.00 | $145 | $50.00 | $184 | $108 | $100 |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 63 FT | $110 | $115 | $75.00 | $82.00 | $55.00 | $99.00 | $113 | $110 |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 192 FT | $130 | $115 | $85.00 | $146 | $60.00 | $214 | $152 | $110 |
| 530E13000 SPECIAL - FORM LINER | 2,000 SF | $13.00 | $20.00 | $5.00 | $20.00 | $17.00 | $14.15 | $20.46 | $23.00 |
| 530E51020 SPECIAL - RETAINING WALL, TIMBER LAGGING | 2,585 SF | $14.00 | $12.00 | $15.00 | $12.00 | $10.00 | $14.50 | $17.28 | $25.00 |
| 518E39900 4" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 37 FT | $20.00 | $100 | $10.00 | $65.00 | $35.00 | $9.00 | $14.21 | $25.00 |
| 202E22900 APPROACH SLAB REMOVED | 82 SY | $50.00 | $40.00 | $30.00 | $37.00 | $30.00 | $30.00 | $25.52 | $20.00 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $13,000 | $70,000 | $9,200 | $60,000 | $6,500 | $30,250 | $8,233 | $3,000 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,400 | $4,000 | $3,000 | $3,320 | $3,100 | $2,715 | $2,382 | $3,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 855 SY | $21.50 | $19.00 | $21.50 | $19.00 | $19.00 | $19.00 | $21.50 | $19.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,596 EACH | $4.00 | $4.50 | $4.00 | $5.15 | $5.00 | $4.70 | $7.30 | $5.07 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 21 SF | $8.00 | $7.00 | $10.00 | $12.00 | $16.00 | $5.00 | $3.74 | $5.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 188 SF | $11.00 | $11.00 | $9.10 | $14.00 | $10.00 | $6.48 | $5.93 | $6.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 127 FT | $45.00 | $31.00 | $32.00 | $62.00 | $33.05 | $45.00 | $45.00 | $30.00 |
| 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $2,400 | $2,750 | $2,600 | $2,400 | $2,700 | $2,765 | $5,913 | $4,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 141 CY | $95.00 | $90.00 | $75.00 | $90.00 | $110 | $87.25 | $73.18 | $120 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 139 FT | $8.00 | $11.00 | $6.00 | $13.00 | $13.00 | $6.00 | $4.38 | $14.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $14.00 | $20.00 | $6.00 | $44.00 | $16.00 | $6.50 | $28.08 | $14.00 |
| 524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK | 95 FT | $370 | $475 | $450 | $555 | $375 | $485 | $448 | $525 |
| 526E90010 TYPE A INSTALLATION | 71 FT | $170 | $175 | $140 | $225 | $170 | $270 | $137 | $120 |
| 894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST | 4 EACH | $2,300 | $3,000 | $3,200 | $2,600 | $2,800 | $2,225 | $2,472 | $4,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $40,000 | $24,500 | $30,000 | $18,000 | $127,000 | $21,391 | $18,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,000 | $20,000 | $10,000 | $8,000 | $18,000 | $10,500 | $7,279 | $15,000 |
| 619E16000 FIELD OFFICE, TYPE A | 8 MNTH | $2,000 | $1,500 | $2,700 | $3,155 | $1,400 | $1,200 | $1,041 | $4,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $20,000 | $45,000 | $20,000 | $16,700 | $28,750 | $8,500 | $19,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10401 STRUCTURAL STEEL MEMBERS, HYBRID GIRDER, LEVEL SIX | 439,543 LB | $2.45 | $1.08M | 31% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 291 CY | $800 | $233k | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 107,367 LB | $1.35 | $145k | 4% |
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 36,372 LB | $3.07 | $112k | 3% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 111 CY | $1,000 | $111k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 99 CY | $1,000 | $99k | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $90,000 | $90k | 3% |
| 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK | 199 FT | $450 | $90k | 3% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $80,000 | $80k | 2% |