SAN-SR 19-15.31/17.15 Rehab
SAN County · est $1.6M
Bid dateThursday, October 14—
SAN County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 97 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2R & I Construction INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Mosser Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 33 EACH | $9,300 | $10,070 | $10,825 | $12,200 | $13,054 | 28% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 152 CY | $950 | $850 | $825 | $1,000 | $760 | 13% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,094 FT | $60.00 | $25.00 | $12.00 | $26.00 | $11.94 | 6% |
| 515E12030 |
| Item | Quantity | R1Great Lakes Demolition Company | R2R & I Construction INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Mosser Construction INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,000 | $2,500 | $1,500 | $50,000 |
| 202E38000 GUARDRAIL REMOVED | 1,296 FT | $2.00 | $1.50 | $2.00 | $3.00 | $2.00 |
| 203E10000 EXCAVATION | 624 CY | $20.00 | $6.00 | $30.00 | $24.00 | $41.89 |
| 203E20000 EMBANKMENT | 147 CY | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6 EACH |
| $10,500 |
| $12,125 |
| $11,500 |
| $16,000 |
| $13,116 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60,000 | $40,000 | $40,000 | $9,751 | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 253 FT | $225 | $224 | $224 | $224 | $224 | 5% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 32,531 LB | $1.40 | $2.00 | $1.75 | $1.50 | $1.75 | 4% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 247 SY | $165 | $240 | $325 | $275 | $339 | 4% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 655 SY | $55.00 | $88.00 | $92.00 | $80.00 | $81.62 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 162 CY | $200 | $207 | $190 | $207 | $294 | 3% |
| 515E12020 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 2 EACH | $15,500 | $12,125 | $16,000 | $18,600 | $19,071 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 150 CY | $200 | $146 | $190 | $146 | $205 | 3% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 29 CY | $950 | $1,000 | $1,400 | $1,500 | $1,464 | 3% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 204 EACH | $120 | $15.00 | $20.00 | $33.00 | $34.06 | 2% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 85 FT | $270 | $263 | $263 | $260 | $263 | 2% |
| 511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN | 34 CY | $650 | $850 | $875 | $850 | $872 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $22,000 | $65,000 | $35,000 | $65,000 | $57,678 | 2% |
| 601E32211 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 258 CY | $80.00 | $75.00 | $125 | $110 | $140 | 2% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $20,000 | $129,000 | $150,000 | $65,000 | $112,881 | 2% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 101 SY | $185 | $250 | $275 | $275 | $276 | 2% |
| $17.00 |
| $20.00 |
| $24.00 |
| $11.94 |
| 204E10000 SUBGRADE COMPACTION | 1,355 SY | $2.00 | $1.20 | $2.00 | $1.00 | $4.92 |
| 606E15050 GUARDRAIL, TYPE MGS | 534.5 FT | $24.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,500 | $2,400 | $2,400 | $2,400 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,500 | $1,400 | $1,400 | $1,400 | $1,400 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 7 EACH | $2,200 | $2,100 | $2,100 | $2,100 | $2,100 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $2,500 | $2,300 | $2,300 | $2,300 | $2,300 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 2 EACH | $150 | $190 | $175 | $148 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $25.00 | $50.00 | $50.00 | $100 |
| 659E00300 TOPSOIL | 151 CY | $35.00 | $17.00 | $30.00 | $35.00 | $27.53 |
| 659E10000 SEEDING AND MULCHING | 1,360 SY | $2.00 | $2.50 | $2.70 | $2.45 | $2.70 |
| 659E14000 REPAIR SEEDING AND MULCHING | 68 SY | $1.00 | $1.00 | $2.70 | $0.40 | $2.70 |
| 659E15000 INTER-SEEDING | 68 SY | $1.00 | $0.50 | $1.00 | $0.10 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $1,000 | $500 | $600 | $230 | $600 |
| 659E31000 LIME | 0.28 ACRE | $800 | $10.00 | $35.00 | $25.00 | $35.00 |
| 659E35000 WATER | 8 MGAL | $5.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 10 SY | $100 | $50.00 | $100 | $170 | $74.19 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 5 CY | $150 | $50.00 | $85.00 | $125 | $133 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $12.00 | $10.00 | $5.00 | $15.00 | $20.74 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $10.00 | $10.00 | $8.00 | $18.00 | $12.48 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $10.00 | $10.00 | $5.00 | $15.00 | $13.44 |
| 611E04400 12" CONDUIT, TYPE B | 20 FT | $55.00 | $10.00 | $6.00 | $42.00 | $58.09 |
| 611E05100 12" CONDUIT, TYPE E | 20 FT | $50.00 | $10.00 | $6.00 | $35.00 | $30.48 |
| 611E05200 12" CONDUIT, TYPE F | 20 FT | $50.00 | $10.00 | $6.00 | $35.00 | $30.48 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $250 | $150 | $200 | $250 | $284 |
| 304E20000 AGGREGATE BASE | 236 CY | $55.00 | $50.00 | $60.00 | $68.00 | $66.09 |
| 407E20000 NON-TRACKING TACK COAT | 112 GAL | $5.00 | $2.10 | $4.00 | $2.10 | $2.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 39 CY | $325 | $385 | $311 | $385 | $412 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (46 CY | $350 | $330 | $341 | $330 | $311 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $1,000 | $755 | $955 | $755 | $1,070 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $90.00 | $5.00 | $10.00 | $22.00 | $78.38 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 50 FT | $14.00 | $15.00 | $11.50 | $15.00 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 17 SF | $30.00 | $30.00 | $25.15 | $30.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 7 EACH | $30.00 | $10.00 | $25.65 | $15.00 | $40.22 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $30.00 | $10.00 | $28.25 | $15.00 | $40.22 |
| 304E20000 AGGREGATE BASE | 200 CY | $55.00 | $23.00 | $40.00 | $68.00 | $66.09 |
| 407E10000 TACK COAT | 50 GAL | $5.00 | $2.10 | $4.00 | $2.10 | $2.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $350 | $230 | $341 | $230 | $221 |
| 614E11630 INCREASED BARRIER DELINEATION | 472 FT | $2.00 | $1.50 | $1.95 | $1.50 | $3.67 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,850 | $1,925 | $1,780 | $1,885 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $360 | $230 | $350 | $520 | $520 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 22 EACH | $10.00 | $8.00 | $6.35 | $9.50 | $9.34 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 20 EACH | $10.00 | $12.00 | $6.95 | $9.50 | $9.31 |
| 614E13360 OBJECT MARKER, TWO WAY | 42 EACH | $15.00 | $16.00 | $13.85 | $16.00 | $14.99 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $825 | $950 | $725 | $950 | $950 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.18 MILE | $16,500 | $10,000 | $15,685 | $10,000 | $10,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.45 MILE | $10,000 | $5,000 | $8,995 | $5,000 | $5,000 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $7.00 | $3.00 | $5.75 | $3.00 | $3.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $60.00 | $25.00 | $90.00 | $65.00 | $94.45 |
| 642E00300 CENTER LINE, TYPE 1 | 1 MILE | $8,500 | $1,500 | $4,000 | $1,500 | $1,500 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,500 | $45,000 | $55,000 | $25,000 | $25,061 |
| 202E22900 APPROACH SLAB REMOVED | 167 SY | $10.00 | $50.00 | $35.00 | $30.00 | $83.25 |
| 202E23500 WEARING COURSE REMOVED | 292 SY | $25.00 | $20.00 | $6.00 | $15.00 | $30.04 |
| 503E21100 UNCLASSIFIED EXCAVATION | 11 CY | $50.00 | $100 | $55.00 | $200 | $40.24 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 4,513 LB | $1.50 | $2.00 | $1.60 | $1.51 | $1.48 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $10.00 | $1.00 | $1.60 | $1.53 | $1.41 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 36 EACH | $150 | $15.00 | $23.00 | $33.00 | $34.06 |
| 511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN | 1 CY | $2,500 | $1,500 | $3,250 | $1,900 | $2,465 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 54 SY | $15.00 | $30.00 | $29.00 | $35.00 | $22.87 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 30 FT | $50.00 | $100 | $100 | $100 | $86.73 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $40.00 | $25.00 | $125 | $100 | $42.78 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 29 SY | $45.00 | $10.00 | $20.00 | $25.00 | $22.35 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 13 SF | $50.00 | $4.00 | $9.00 | $7.00 | $8.83 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 67 FT | $25.00 | $27.00 | $30.00 | $38.00 | $47.52 |
| 516E41100 1/8" PREFORMED BEARING PAD | 32 EACH | $35.00 | $5.00 | $19.00 | $26.00 | $25.36 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 32 EACH | $90.00 | $110 | $75.00 | $80.00 | $100 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $90.00 | $100 | $125 | $90.00 | $147 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 78 FT | $12.00 | $10.00 | $20.00 | $15.00 | $24.44 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 3 SF | $400 | $125 | $200 | $100 | $234 |
| 526E90010 TYPE A INSTALLATION | 61 FT | $150 | $150 | $150 | $125 | $131 |
| 601E32211 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 53 CY | $90.00 | $80.00 | $125 | $115 | $140 |
| 202E22900 APPROACH SLAB REMOVED | 246 SY | $10.00 | $50.00 | $35.00 | $30.00 | $52.66 |
| 202E23500 WEARING COURSE REMOVED | 842 SY | $20.00 | $15.00 | $6.00 | $15.00 | $27.04 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $14,000 | $15,000 | $10,000 | $15,000 | $17,418 |
| 503E21100 UNCLASSIFIED EXCAVATION | 70 CY | $50.00 | $100 | $100 | $100 | $31.13 |
| 507E71200 SPECIAL - PILE ENCASEMENT | 96 FT | $150 | $200 | $350 | $350 | $304 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 50 LB | $10.00 | $1.00 | $1.75 | $1.50 | $1.41 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 191 SY | $15.00 | $30.00 | $22.00 | $30.00 | $21.94 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 23 FT | $50.00 | $100 | $100 | $100 | $88.23 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $40.00 | $25.00 | $125 | $100 | $42.78 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 81 SY | $45.00 | $10.00 | $20.00 | $50.00 | $22.33 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 13 SF | $50.00 | $4.00 | $9.00 | $10.00 | $8.83 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 97 FT | $25.00 | $27.00 | $29.00 | $38.00 | $47.52 |
| 516E41100 1/8" PREFORMED BEARING PAD | 132 EACH | $35.00 | $5.00 | $19.00 | $26.00 | $25.36 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 132 EACH | $90.00 | $110 | $75.00 | $75.00 | $100 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 63 CY | $50.00 | $100 | $100 | $85.00 | $82.20 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 247 FT | $12.00 | $10.00 | $18.00 | $15.00 | $24.44 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 117 FT | $8.00 | $10.00 | $9.00 | $12.00 | $19.37 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 64 FT | $8.00 | $10.00 | $20.00 | $12.00 | $19.85 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 49 SF | $150 | $125 | $100 | $100 | $111 |
| 526E90010 TYPE A INSTALLATION | 91 FT | $140 | $150 | $150 | $125 | $134 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,000 | $23,000 | $19,000 | $22,000 | $10,077 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $7,500 | $9,750 | $6,600 | $12,144 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 33 EACH | $9,300 | $307k | 21% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 152 CY | $950 | $144k | 10% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,094 FT | $60 | $66k | 4% |
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $10,500 | $63k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 253 FT | $225 | $57k | 4% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 32,531 LB | $1.4 | $46k | 3% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 247 SY | $165 | $41k | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 655 SY | $55 | $36k | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 162 CY | $200 | $32k | 2% |