PRE-SR 122-14.41/17.69
PRE County · est $1.1M
Bid dateThursday, October 28—
PRE County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 70 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Brumbaugh Construction INC | R3Complete General Construction Company | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $119,370 | $120,000 | $110,000 | $151,844 | 12% |
| 514E27800 FIELD PAINTING, MISC.:BEAM ENDS AND REPAIR | 1 LS | $115,500 | $31,500 | $91,000 | $42,000 | 12% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 78 FT | $1,063 | $755 | $950 | $1,014 | 8% |
| 511E47011 CLASS QC1 CONCRETE, CULVERT, AS PER PLAN | 66 CY | $1,183 | $925 | $1,400 |
| Item | Quantity | R1Bcc Ohio INC | R2Brumbaugh Construction INC | R3Complete General Construction Company | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,920 | $75,000 | $50,000 | $25,800 |
| 202E23000 PAVEMENT REMOVED | 910 SY | $11.55 | $6.00 | $10.00 | $17.68 |
| 202E32500 CURB AND GUTTER REMOVED | 165 FT | $6.80 | $9.00 | $15.00 | $9.03 |
| 202E38000 GUARDRAIL REMOVED | 704 FT | $1.89 | $4.00 | $1.80 | $2.53 |
| 203E10000 EXCAVATION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,827 |
| 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 255 CY | $231 | $230 | $255 | $220 | 6% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $53,955 | $27,000 | $35,000 | $17,421 | 6% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 411 FT | $131 | $102 | $150 | $97.78 | 6% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 662 SF | $65.13 | $45.00 | $70.00 | $56.31 | 4% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 114 SY | $366 | $280 | $260 | $344 | 4% |
| 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,828 | $1,750 | $1,750 | $2,236 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $36,950 | $67,000 | $40,000 | $60,043 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 415 CY | $80.48 | $30.00 | $75.00 | $96.25 | 3% |
| 601E35100 ROCK CHANNEL PROTECTION, MISC.: J-WEIR | 1 LS | $32,528 | $144,000 | $60,000 | $99,907 | 3% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $31,373 | $34,000 | $30,000 | $54,448 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 90 CY | $341 | $340 | $465 | $325 | 3% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 236 SF | $123 | $115 | $145 | $145 | 3% |
| 511E21521 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 6 CY | $4,477 | $3,900 | $1,750 | $3,245 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,710 | $29,000 | $65,000 | $98,720 | 3% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 13,497 LB | $1.85 | $1.75 | $1.75 | $1.72 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $21,540 | $26,000 | $10,000 | $19,959 | 2% |
| 972 CY |
| $9.75 |
| $23.00 |
| $17.50 |
| $38.43 |
| 203E20000 EMBANKMENT | 446 CY | $9.75 | $24.00 | $18.00 | $18.01 |
| 606E13000 GUARDRAIL, TYPE 5 | 212.5 FT | $22.68 | $24.00 | $21.60 | $23.24 |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $23.94 | $26.00 | $22.80 | $25.27 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 100 FT | $25.62 | $31.00 | $24.40 | $29.31 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 5 EACH | $2,898 | $2,625 | $2,760 | $2,527 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,239 | $1,550 | $1,180 | $1,516 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $998 | $2,425 | $950 | $2,324 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 165 FT | $30.19 | $45.00 | $75.00 | $88.29 |
| 659E00300 TOPSOIL | 263 CY | $32.17 | $50.00 | $22.50 | $30.13 |
| 659E10000 SEEDING AND MULCHING | 2,360 SY | $2.63 | $2.00 | $1.50 | $2.49 |
| 659E20000 COMMERCIAL FERTILIZER | 0.32 TON | $336 | $500 | $800 | $800 |
| 659E31000 LIME | 0.49 ACRE | $42.00 | $50.00 | $330 | $330 |
| 659E35000 WATER | 13 MGAL | $1.05 | $5.00 | $10.00 | $10.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 282 FT | $15.02 | $12.00 | $30.00 | $14.47 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $10.64 | $20.00 | $20.00 | $11.62 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 55 FT | $29.58 | $18.00 | $15.00 | $19.73 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $29.31 | $18.00 | $6.00 | $13.46 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $960 | $250 | $2,000 | $286 |
| 204E10000 SUBGRADE COMPACTION | 1,289 SY | $3.25 | $1.00 | $6.00 | $5.18 |
| 304E20000 AGGREGATE BASE | 221 CY | $89.15 | $65.00 | $70.00 | $94.64 |
| 407E10000 TACK COAT | 194 GAL | $1.05 | $1.00 | $4.00 | $1.00 |
| 621E00100 RPM | 5 EACH | $233 | $540 | $513 | $513 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $24.38 | $40.00 | $35.00 | $0.01 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 34.5 FT | $35.70 | $16.00 | $34.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $52.50 | $68.00 | $50.00 | $50.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 1.34 SF | $52.50 | $20.00 | $50.00 | $75.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $68.25 | $68.00 | $65.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.75 | $16.00 | $15.00 | $30.00 |
| 646E10010 EDGE LINE, 6" | 0.2 MILE | $25,946 | $26,010 | $21,275 | $21,275 |
| 646E10200 CENTER LINE | 0.11 MILE | $25,945 | $26,010 | $31,400 | $31,400 |
| 202E23000 PAVEMENT REMOVED | 200 SY | $6.44 | $8.00 | $10.00 | $38.80 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 200 SY | $5.25 | $5.00 | $30.00 | $30.01 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 25 CY | $242 | $230 | $255 | $250 |
| 407E10000 TACK COAT | 10 GAL | $1.05 | $1.00 | $4.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 20 CY | $273 | $260 | $465 | $284 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 445 EACH | $19.65 | $18.00 | $30.00 | $15.24 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 7 CY | $1,395 | $1,290 | $3,000 | $1,989 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 14 CY | $1,056 | $900 | $1,500 | $925 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 5 CY | $1,563 | $850 | $4,500 | $1,215 |
| 511E53010 CLASS QC1 CONCRETE, MISC.:APRON | 2 CY | $1,651 | $750 | $2,500 | $1,003 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 140 SY | $27.05 | $18.00 | $28.00 | $28.00 |
| 512E33000 TYPE 2 WATERPROOFING | 250 SY | $18.98 | $20.00 | $23.50 | $23.50 |
| 512E33010 TYPE 3 WATERPROOFING | 140 SY | $42.60 | $33.00 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 146 SF | $7.13 | $2.50 | $15.00 | $4.13 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 45 CY | $113 | $115 | $117 | $144 |
| 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS | 56.25 FT | $189 | $260 | $212 | $266 |
| 202E22900 APPROACH SLAB REMOVED | 114 SY | $64.72 | $27.00 | $75.00 | $21.79 |
| 503E21100 UNCLASSIFIED EXCAVATION | 7 CY | $248 | $30.00 | $100 | $398 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,805 LB | $1.85 | $1.75 | $1.75 | $1.80 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 184 LB | $1.85 | $16.00 | $3.00 | $3.43 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 184 EACH | $20.63 | $17.00 | $30.00 | $16.64 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 16 CY | $277 | $850 | $1,500 | $1,284 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 158 SY | $28.02 | $18.00 | $28.00 | $28.00 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 753 SY | $7.06 | $4.00 | $9.50 | $13.03 |
| 512E33000 TYPE 2 WATERPROOFING | 21 SY | $23.63 | $25.00 | $650 | $23.50 |
| 513E95020 STRUCTURAL STEEL, MISC.:INTERMEDIATE CROSS FRAME R | 1 LS | $10,403 | $6,300 | $10,000 | $5,739 |
| 513E95020 STRUCTURAL STEEL, MISC.:MOMENT PLATE REPAIR | 1 LS | $10,875 | $3,300 | $3,000 | $4,929 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $2,051 | $1,750 | $1,750 | $1,392 |
| 526E90010 TYPE A INSTALLATION | 76 FT | $237 | $145 | $220 | $159 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 48 CY | $137 | $90.00 | $195 | $185 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,655 | $7,000 | $13,000 | $8,819 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,583 | $76,668 | $9,000 | $7,799 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,348 | $17,000 | $10,000 | $11,641 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,190 | $9,000 | $4,000 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $119,370 | $119k | 9% |
| 514E27800 FIELD PAINTING, MISC.:BEAM ENDS AND REPAIR | 1 LS | $115,500 | $116k | 9% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 78 FT | $1,063 | $83k | 6% |
| 511E47011 CLASS QC1 CONCRETE, CULVERT, AS PER PLAN | 66 CY | $1,183 | $78k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 255 CY | $231 | $59k | 4% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $53,955 | $54k | 4% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 411 FT | $131.04 | $54k | 4% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 662 SF | $65.13 | $43k | 3% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 114 SY | $366.39 | $42k | 3% |
| 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $3,828 | $38k | 3% |