WOO-SR 65/SR 18-00.00/18.53 Resurf (PART 1 AND PART 2)
WOO County · est $3.2M
Bid dateThursday, October 28—
WOO County · est $3.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 81 more items below.
| Item | Quantity | R1Shelly Company | R2Gerken Paving INC | % of bid |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (5080.1 CY | $147 | $144 | 26% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,653.4 CY | $166 | $172 | 21% |
| 253E02000 PAVEMENT REPAIR | 2,471 CY | $180 | $172 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $165,000 | $183,000 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" | 104,669 SY | $1.55 | $2.40 | 6% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 848.8 CY | $176 | $175 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,374 CY |
| Item | Quantity | R1Shelly Company | R2Gerken Paving INC |
|---|---|---|---|
| 202E11000 STRUCTURE REMOVED | 1 LS | $300 | $3,000 |
| 202E23000 PAVEMENT REMOVED | 499 SY | $17.00 | $5.00 |
| 202E32000 CURB REMOVED | 15 FT | $10.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED | 2,600 FT | $1.80 | $1.80 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 9 EACH | $275 | $275 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 3 EACH | $130 | $130 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 7 EACH | $95.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $55.00 |
| $55.00 |
| 3% |
| 608E10000 4" CONCRETE WALK | 8,100 SF | $6.90 | $6.90 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (313 CY | $147 | $152 | 2% |
| 608E52000 CURB RAMP | 4,050 SF | $10.75 | $10.75 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 241 CY | $165 | $200 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 223 CY | $165 | $195 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,563 FT | $21.60 | $21.60 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH 2016 | 12 EACH | $2,775 | $2,775 | 1% |
| 202E30000 WALK REMOVED | 12,150 SF | $2.50 | $2.55 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 14,672 GAL | $2.00 | $2.00 | 1% |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 39 MILE | $750 | $650 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 24 MILE | $1,200 | $750 | 1% |
| 203E10000 EXCAVATION | 532 CY | $43.00 | $30.00 | 1% |
| $95.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 3 EACH | $115 | $115 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 8 EACH | $60.00 | $60.00 |
| 203E20000 EMBANKMENT | 200 CY | $62.50 | $62.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 36 STA | $40.00 | $40.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 200 CY | $69.00 | $69.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 988 FT | $23.00 | $23.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 3 EACH | $2,080 | $2,080 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 7 EACH | $1,180 | $1,180 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,385 | $2,385 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $820 | $820 |
| 609E26000 CURB, TYPE 6 | 15 FT | $27.00 | $27.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 ,BIDIRECTIONAL | 81 EACH | $9.20 | $9.20 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $800 | $1,200 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $1,050 | $1,800 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $1,000 | $1,200 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,500 | $1,800 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $600 | $900 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $600 | $750 |
| 209E60500 LINEAR GRADING | 14 MILE | $1,000 | $2,800 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 12.9 MILE | $1,000 | $400 |
| 304E20000 AGGREGATE BASE | 228 CY | $56.00 | $90.00 |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 59 CY | $300 | $625 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (73.8 CY | $300 | $500 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 8,942 LB | $0.50 | $1.60 |
| 621E00100 RPM | 320 EACH | $33.50 | $33.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 365 EACH | $6.00 | $6.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 14 MILE | $750 | $700 |
| 642E00300 CENTER LINE, TYPE 1 | 8 MILE | $1,200 | $750 |
| 643E00500 STOP LINE | 102 FT | $6.00 | $7.00 |
| 643E00600 CROSSWALK LINE | 869 FT | $5.00 | $7.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $550 | $700 |
| 644E01200 PARKING LOT STALL MARKING | 54 FT | $2.00 | $2.00 |
| 644E01510 DOTTED LINE, 6" | 77 FT | $3.00 | $2.00 |
| 644E01600 HANDICAP SYMBOL MARKING | 1 EACH | $150 | $200 |
| 614E12460 WORK ZONE MARKING SIGN | 28 EACH | $100 | $100 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $150 | $150 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $56.00 | $56.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 306 FT | $3.00 | $3.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $100 |
| 630E86320 REMOVAL OF STRUCTURE MOUNTED SIGN AND REERECTION | 2 EACH | $250 | $250 |
| 202E23000 PAVEMENT REMOVED | 18 SY | $26.00 | $26.00 |
| 202E30000 WALK REMOVED | 1,392 SF | $2.75 | $2.75 |
| 203E10000 EXCAVATION | 77 CY | $18.00 | $40.00 |
| 203E20000 EMBANKMENT | 15 CY | $550 | $55.00 |
| 209E60500 LINEAR GRADING | 0.94 MILE | $1,000 | $2,800 |
| 608E10000 4" CONCRETE WALK | 1,472 SF | $6.55 | $6.55 |
| 608E21001 4" ASPHALT CONCRETE WALK, AS PER PLAN | 324 SF | $16.00 | $10.00 |
| 608E52000 CURB RAMP | 266 SF | $11.00 | $11.00 |
| 659E00300 TOPSOIL | 23 CY | $55.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 207 SY | $2.25 | $2.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $800 | $850 |
| 659E35000 WATER | 1.1 MGAL | $50.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $800 | $1,200 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,000 | $1,000 |
| 611E99690 MANHOLE, MISC.:CONCRETE COLLAR FOR MANHOLE | 1 EACH | $700 | $500 |
| 253E01000 PAVEMENT REPAIR | 600 SY | $32.00 | $36.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIES | 6,428 SY | $1.25 | $2.45 |
| 407E20000 NON-TRACKING TACK COAT | 964 GAL | $2.00 | $2.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 77 CY | $55.00 | $55.00 |
| 638E10600 FIRE HYDRANT AND GATE VALVE REMOVED AND RESET | 1 EACH | $2,500 | $7,200 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 7 FT | $20.00 | $20.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 10 FT | $20.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $25.00 | $25.00 |
| 644E00300 CENTER LINE | 0.47 MILE | $5,500 | $6,000 |
| 644E00500 STOP LINE | 98 FT | $6.00 | $8.00 |
| 644E00600 CROSSWALK LINE | 132 FT | $5.00 | $8.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 1 EACH | $550 | $700 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,000 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $16,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,000 | $6,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,655 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (5080.1 CY | $147 | $747k | 23% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,653.4 CY | $166 | $606k | 19% |
| 253E02000 PAVEMENT REPAIR | 2,471 CY | $180 | $445k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $165,000 | $165k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" | 104,669 SY | $1.55 | $162k | 5% |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 848.8 CY | $176 | $149k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 617E10100 COMPACTED AGGREGATE | 1,374 CY | $55 | $76k | 2% |
| 608E10000 4" CONCRETE WALK | 8,100 SF | $6.9 | $56k | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (313 CY | $147 | $46k | 1% |