STA-US 62-24.14
STA County · est $14M
Bid dateThursday, December 16—
STA County · est $14M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 335 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Kenmore Construction CO INC | R3Karvo Companies INC | R4Beaver Excavating Company | R5Shelly & Sands INC | R6Digioia-suburban Excavating LLC | R7S E T INC | R8Lockhart Concrete CO | R9Fabrizi Trucking & Paving CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 8,320 CY | $119 | $130 | $130 | $119 | $148 | $150 | $126 | $140 | $154 | 13% |
| 638E98600 WATER WORK, MISC.: 36" WATER MAIN DUCTILE IRON PIP | 1,010 FT |
| Item | Quantity | R1Great Lakes Construction CO | R2Kenmore Construction CO INC | R3Karvo Companies INC | R4Beaver Excavating Company | R5Shelly & Sands INC | R6Digioia-suburban Excavating LLC | R7S E T INC | R8Lockhart Concrete CO | R9Fabrizi Trucking & Paving CO INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 574 SY | $10.00 | $10.00 | $10.00 | $10.00 | $11.00 | $8.00 | $10.50 | $22.00 | $25.00 |
| 202E30000 WALK REMOVED | 17,629 SF | $1.00 | $1.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $740 |
| $790 |
| $800 |
| $975 |
| $770 |
| $750 |
| $724 |
| $615 |
| $850 |
| 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $626,000 | $165,000 | $600,000 | $400,000 | $870,000 | $530,000 | $873,848 | $300,000 | $145,000 | 8% |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 24,096 SF | $24.00 | $24.00 | $25.00 | $28.00 | $31.00 | $30.00 | $24.67 | $28.00 | $35.00 | 7% |
| 304E20000 AGGREGATE BASE | 9,445 CY | $60.00 | $52.00 | $60.00 | $75.00 | $63.00 | $48.00 | $61.80 | $55.00 | $49.00 | 7% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,034 CY | $215 | $220 | $230 | $215 | $228 | $250 | $227 | $229 | $255 | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,416 CY | $169 | $175 | $185 | $169 | $170 | $200 | $178 | $179 | $198 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $400,000 | $400,000 | $750,000 | $400,000 | $400,000 | $400,000 | $400,000 | $200,000 | $847,000 | 5% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 9,140 CY | $42.00 | $50.00 | $46.00 | $46.00 | $50.00 | $45.00 | $61.80 | $32.00 | $45.00 | 5% |
| 202E23000 PAVEMENT REMOVED | 43,008 SY | $8.00 | $9.00 | $9.00 | $7.50 | $7.00 | $12.00 | $16.00 | $50.00 | $15.00 | 4% |
| 511E53012 CLASS QC2 CONCRETE, MISC.: MOMENT SLAB AND BARRIER | 596 CY | $550 | $500 | $700 | $450 | $631 | $515 | $880 | $171 | $765 | 4% |
| 606E10920 SPECIAL - NOISE BARRIER, FIBREGLASS PANELS, MOMENT | 8,382 SF | $38.00 | $68.00 | $40.00 | $63.00 | $34.00 | $105 | $95.25 | $26.00 | $45.00 | 4% |
| 203E10000 EXCAVATION | 25,066 CY | $12.00 | $15.00 | $12.00 | $18.00 | $18.00 | $16.00 | $15.00 | $20.00 | $20.00 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 26,937 FT | $10.00 | $10.00 | $9.50 | $12.00 | $11.00 | $10.00 | $12.41 | $12.50 | $9.50 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $250,000 | $100,000 | $95,000 | $275,000 | $63,000 | $125,000 | $300,000 | $500,000 | $65,000 | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 3,366 SY | $63.00 | $40.00 | $45.00 | $59.00 | $61.00 | $56.00 | $81.60 | $45.00 | $62.00 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 8,321 FT | $25.00 | $20.00 | $25.00 | $25.00 | $26.00 | $24.00 | $22.90 | $9.03 | $19.65 | 3% |
| 611E10400 24" CONDUIT, TYPE B | 1,899 FT | $100 | $127 | $120 | $125 | $119 | $125 | $107 | $100 | $153 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 2,575 FT | $70.00 | $84.00 | $80.00 | $60.00 | $76.00 | $68.00 | $58.75 | $55.00 | $124 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 11,975 FT | $15.00 | $14.00 | $12.00 | $12.00 | $8.00 | $24.00 | $23.20 | $55.00 | $33.00 | 2% |
| $1.30 |
| $1.50 |
| $0.70 |
| $2.00 |
| $1.30 |
| $0.50 |
| $1.50 |
| 202E30200 STEPS REMOVED | 7 FT | $50.00 | $25.00 | $42.00 | $125 | $68.00 | $45.00 | $42.80 | $150 | $155 |
| 202E32000 CURB REMOVED | 5,857 FT | $1.50 | $2.50 | $6.00 | $4.00 | $3.40 | $5.00 | $5.20 | $2.00 | $11.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,074 FT | $12.00 | $25.00 | $21.00 | $16.00 | $16.00 | $30.00 | $8.00 | $10.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 1,286 FT | $2.40 | $3.00 | $2.40 | $2.40 | $2.50 | $4.00 | $2.50 | $3.00 | $3.50 |
| 202E38700 GUARDRAIL POST REMOVED | 1 EACH | $15.00 | $10.00 | $10.00 | $15.00 | $16.00 | $12.00 | $70.60 | $10.00 | $25.00 |
| 202E58000 MANHOLE REMOVED | 5 EACH | $600 | $600 | $285 | $400 | $510 | $750 | $705 | $1,000 | $800 |
| 202E58100 CATCH BASIN REMOVED | 48 EACH | $500 | $150 | $285 | $350 | $660 | $500 | $529 | $250 | $350 |
| 202E58500 CATCH BASIN ABANDONED | 4 EACH | $550 | $150 | $285 | $300 | $790 | $410 | $577 | $150 | $350 |
| 202E58700 MANHOLE ABANDONED | 4 EACH | $550 | $700 | $400 | $600 | $840 | $600 | $776 | $500 | $700 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (12" - 24 | 2,118 FT | $16.00 | $15.00 | $13.00 | $13.00 | $37.00 | $20.00 | $16.00 | $13.56 | $14.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 2,090 FT | $7.00 | $18.00 | $3.50 | $15.00 | $23.00 | $21.00 | $6.00 | $16.80 | $20.00 |
| 202E75000 FENCE REMOVED | 2,053 FT | $4.00 | $4.00 | $3.50 | $2.00 | $3.50 | $4.00 | $3.70 | $3.50 | $5.00 |
| 202E98100 REMOVAL MISC.: BOULDER | 14 EACH | $25.00 | $50.00 | $25.00 | $35.00 | $160 | $60.00 | $28.10 | $1,000 | $75.00 |
| 202E98100 REMOVAL MISC.: CONCRETE BOLLARD | 6 EACH | $100 | $100 | $185 | $30.00 | $145 | $150 | $45.60 | $185 | $100 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $250 | $300 | $350 | $150 | $1,300 | $400 | $529 | $200 | $1,100 |
| 202E98100 REMOVAL MISC.: PRIVATE SIGN (A) | 3 EACH | $500 | $150 | $2,850 | $800 | $2,600 | $1,200 | $2,256 | $200 | $500 |
| 202E98100 REMOVAL MISC.: PRIVATE SIGN (B) | 5 EACH | $250 | $300 | $750 | $85.00 | $1,000 | $600 | $136 | $200 | $750 |
| 202E98200 REMOVAL MISC.: CONDUIT | 20 FT | $13.00 | $5.00 | $25.00 | $12.00 | $35.00 | $15.00 | $14.90 | $10.00 | $50.00 |
| 202E98200 REMOVAL MISC.: RETAINING WALL | 30 FT | $50.00 | $20.00 | $12.00 | $25.00 | $33.00 | $16.00 | $14.90 | $150 | $30.00 |
| 202E98400 REMOVAL MISC.: PARCEL 89 BLOCK RETAINING WALL | 390 SF | $2.00 | $10.00 | $5.00 | $3.00 | $1.50 | $8.00 | $4.80 | $10.00 | $20.00 |
| 203E20000 EMBANKMENT | 9,774 CY | $5.00 | $13.00 | $20.00 | $8.00 | $20.00 | $7.00 | $10.00 | $32.00 | $12.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $30.00 | $25.00 | $62.00 | $12.00 | $20.00 | $11.00 | $18.70 | $100 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 57,773 SY | $1.00 | $1.50 | $1.25 | $2.00 | $2.50 | $1.50 | $1.30 | $1.50 | $2.20 |
| 204E13000 EXCAVATION OF SUBGRADE (12" UNSTABLE SUBGRADE) | 9,240 CY | $13.00 | $15.00 | $15.00 | $17.00 | $20.00 | $20.00 | $26.00 | $12.00 | $18.00 |
| 204E13000 EXCAVATION OF SUBGRADE (24" UNSUITABLE ROCK) | 616 CY | $26.00 | $25.00 | $28.00 | $17.00 | $40.00 | $50.00 | $81.00 | $60.00 | $45.00 |
| 204E20000 EMBANKMENT | 716 CY | $9.50 | $15.00 | $10.00 | $8.00 | $30.00 | $11.00 | $12.00 | $32.00 | $15.00 |
| 204E45000 PROOF ROLLING | 41 HOUR | $350 | $125 | $225 | $150 | $220 | $200 | $197 | $95.00 | $188 |
| 204E50000 GEOTEXTILE FABRIC | 24,850 SY | $1.50 | $2.50 | $1.75 | $1.25 | $0.50 | $1.50 | $1.50 | $2.50 | $45.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,050 FT | $23.80 | $26.00 | $24.20 | $23.80 | $25.00 | $25.00 | $25.10 | $24.20 | $28.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $3,145 | $2,900 | $3,275 | $3,145 | $3,300 | $3,500 | $3,316 | $3,275 | $3,000 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,370 | $2,225 | $1,380 | $1,370 | $1,450 | $1,500 | $1,444 | $1,380 | $1,375 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,965 | $2,100 | $3,025 | $2,965 | $3,140 | $3,300 | $3,126 | $3,025 | $2,750 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $650 | $1,750 | $650 | $650 | $688 | $700 | $685 | $650 | $495 |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) [45 MPH, | 2 EACH | $23,425 | $45,550 | $23,850 | $23,425 | $25,000 | $25,600 | $24,695 | $23,850 | $26,000 |
| 608E12000 5" CONCRETE WALK | 9,581 SF | $7.00 | $7.00 | $6.75 | $6.50 | $6.50 | $6.50 | $6.90 | $6.00 | $7.35 |
| 608E41000 CONCRETE STEPS, TYPE B | 5 FT | $215 | $125 | $400 | $225 | $155 | $220 | $158 | $250 | $240 |
| 608E52000 CURB RAMP | 982 SF | $14.00 | $14.00 | $18.00 | $13.25 | $22.00 | $15.00 | $18.30 | $7.00 | $18.00 |
| 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B | 422 FT | $80.00 | $114 | $112 | $105 | $105 | $140 | $108 | $40.00 | $128 |
| 622E10100 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1 | 436 FT | $78.00 | $130 | $112 | $120 | $120 | $140 | $150 | $50.00 | $139 |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 674 FT | $93.00 | $158 | $175 | $145 | $145 | $175 | $182 | $60.00 | $172 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,501 FT | $60.00 | $97.00 | $80.00 | $90.00 | $90.00 | $103 | $75.90 | $50.00 | $125 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 1 EACH | $10,000 | $6,200 | $11,075 | $8,000 | $7,500 | $10,300 | $8,855 | $3,000 | $11,360 |
| 622E24860 CONCRETE BARRIER END SECTION, TYPE C1 | 1 EACH | $9,000 | $8,300 | $11,705 | $8,200 | $7,700 | $10,300 | $9,224 | $4,000 | $13,875 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 5 EACH | $5,000 | $4,200 | $5,000 | $5,700 | $5,200 | $5,500 | $3,110 | $3,500 | $9,260 |
| 622E25004 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 6 EACH | $3,200 | $4,200 | $4,750 | $4,400 | $3,900 | $5,700 | $2,899 | $5,000 | $5,585 |
| 622E25005 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $3,200 | $4,500 | $4,800 | $5,700 | $5,200 | $4,900 | $2,108 | $7,000 | $6,250 |
| 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $3,000 | $5,000 | $4,925 | $4,900 | $4,400 | $4,900 | $3,848 | $6,000 | $6,660 |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 11 EACH | $3,000 | $5,200 | $5,300 | $5,500 | $5,000 | $4,900 | $3,848 | $2,500 | $7,985 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 9 EACH | $3,000 | $5,000 | $4,085 | $4,800 | $4,300 | $4,300 | $2,530 | $5,000 | $4,935 |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $3,000 | $5,800 | $8,000 | $6,000 | $5,500 | $5,500 | $5,798 | $5,825 | $5,200 |
| 623E38500 MONUMENT ASSEMBLY | 14 EACH | $950 | $850 | $1,500 | $1,250 | $1,700 | $975 | $935 | $485 | $950 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 31 SY | $100 | $110 | $100 | $110 | $62.00 | $125 | $186 | $70.00 | $145 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 4 CY | $225 | $375 | $325 | $155 | $305 | $135 | $377 | $150 | $140 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $200 | $100 | $146 | $150 | $220 | $255 | $450 | $200 |
| 659E00300 TOPSOIL | 2,080 CY | $33.00 | $22.00 | $29.00 | $13.00 | $39.00 | $48.00 | $48.80 | $80.00 | $42.00 |
| 659E10000 SEEDING AND MULCHING | 16,365 SY | $0.78 | $0.90 | $0.78 | $0.72 | $0.75 | $1.00 | $1.00 | $1.20 | $0.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 818 SY | $1.00 | $1.00 | $1.00 | $0.68 | $0.70 | $1.00 | $1.10 | $0.88 | $0.80 |
| 659E15000 INTER-SEEDING | 818 SY | $0.10 | $1.00 | $1.00 | $0.68 | $0.70 | $0.05 | $0.01 | $0.88 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 2.28 TON | $1,000 | $500 | $1,000 | $648 | $650 | $520 | $527 | $1,350 | $700 |
| 659E31000 LIME | 3.38 ACRE | $0.10 | $200 | $0.25 | $154 | $160 | $215 | $211 | $327 | $180 |
| 659E35000 WATER | 91 MGAL | $0.10 | $10.00 | $0.25 | $1.00 | $1.00 | $1.20 | $1.10 | $6.00 | $2.00 |
| 659E40000 MOWING | 37 MSF | $0.10 | $1.00 | $0.25 | $100 | $10.00 | $10.00 | $1.10 | $50.00 | $10.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 890 SY | $2.75 | $2.45 | $2.75 | $1.44 | $1.50 | $5.00 | $2.60 | $4.75 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,500 | $2,000 | $5,500 | $1,500 | $5,000 | $1,730 | $5,000 | $1,750 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $16,000 | $30,000 | $35,000 | $35,000 | $27,000 | $25,000 | $32,178 | $33,000 | $26,400 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,000 | $26,000 | $25,000 | $35,000 | $23,000 | $24,500 | $27,587 | $15,000 | $23,750 |
| 832E30000 EROSION CONTROL | 120,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.8 CY | $2,000 | $2,200 | $2,400 | $1,600 | $10,000 | $2,000 | $2,142 | $1,000 | $2,500 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 389 FT | $10.00 | $15.00 | $15.00 | $16.00 | $18.00 | $15.00 | $12.90 | $13.00 | $11.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 384 FT | $12.00 | $15.00 | $15.00 | $13.00 | $20.00 | $18.00 | $12.45 | $15.00 | $11.00 |
| 611E00200 4" CONDUIT, TYPE C, 707.45 | 10 FT | $30.00 | $50.00 | $240 | $50.00 | $38.00 | $25.00 | $15.80 | $20.00 | $35.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 1,247 FT | $17.00 | $5.00 | $13.00 | $17.00 | $24.00 | $28.00 | $17.57 | $25.00 | $10.00 |
| 611E00900 6" CONDUIT, TYPE B | 189 FT | $18.00 | $30.00 | $13.00 | $20.00 | $30.00 | $30.00 | $23.96 | $25.00 | $80.00 |
| 611E01100 6" CONDUIT, TYPE C, 707.08 | 5 FT | $52.00 | $40.00 | $300 | $125 | $99.00 | $35.00 | $22.91 | $25.00 | $60.00 |
| 611E01100 6" CONDUIT, TYPE C, 707.24 | 5 FT | $56.00 | $100 | $300 | $125 | $109 | $35.00 | $22.91 | $25.00 | $70.00 |
| 611E01100 6" CONDUIT, TYPE C, 707.41 | 10 FT | $50.00 | $30.00 | $280 | $55.00 | $50.00 | $35.00 | $22.91 | $25.00 | $80.00 |
| 611E02000 8" CONDUIT, TYPE C, 707.33 | 5 FT | $53.00 | $50.00 | $300 | $110 | $100 | $65.00 | $21.88 | $30.00 | $85.00 |
| 611E04600 12" CONDUIT, TYPE C | 837 FT | $50.00 | $68.00 | $82.00 | $60.00 | $77.00 | $50.00 | $42.91 | $50.00 | $105 |
| 611E04600 12" CONDUIT, TYPE C, 707.24 | 5 FT | $165 | $100 | $305 | $140 | $146 | $70.00 | $60.43 | $60.00 | $110 |
| 611E04600 12" CONDUIT, TYPE C, 707.33 | 5 FT | $200 | $100 | $300 | $105 | $147 | $70.00 | $48.27 | $60.00 | $115 |
| 611E05900 15" CONDUIT, TYPE B | 407 FT | $80.00 | $118 | $105 | $75.00 | $100 | $100 | $78.61 | $60.00 | $121 |
| 611E06100 15" CONDUIT, TYPE C | 317 FT | $62.00 | $68.00 | $88.00 | $75.00 | $83.00 | $65.00 | $51.47 | $55.00 | $100 |
| 611E07400 18" CONDUIT, TYPE B | 7 FT | $185 | $200 | $240 | $120 | $227 | $155 | $93.16 | $82.00 | $150 |
| 611E07600 18" CONDUIT, TYPE C, 707.24 | 5 FT | $170 | $200 | $350 | $170 | $288 | $163 | $93.31 | $72.00 | $140 |
| 611E08900 21" CONDUIT, TYPE B | 807 FT | $90.00 | $144 | $125 | $105 | $116 | $125 | $121 | $93.00 | $160 |
| 611E10600 24" CONDUIT, TYPE C | 11 FT | $150 | $220 | $220 | $155 | $112 | $100 | $125 | $85.00 | $150 |
| 611E11900 27" CONDUIT, TYPE B | 376 FT | $110 | $154 | $155 | $125 | $140 | $145 | $111 | $107 | $145 |
| 611E13400 30" CONDUIT, TYPE B | 773 FT | $140 | $153 | $156 | $130 | $158 | $150 | $127 | $121 | $172 |
| 611E13600 30" CONDUIT, TYPE C | 28 FT | $120 | $140 | $185 | $155 | $143 | $115 | $120 | $110 | $180 |
| 611E16600 36" CONDUIT, TYPE C | 249 FT | $150 | $135 | $148 | $145 | $167 | $120 | $109 | $160 | $170 |
| 611E53004 38" X 60" CONDUIT, TYPE C, 706.04 | 234 FT | $340 | $325 | $400 | $420 | $355 | $380 | $327 | $410 | $360 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 20 FT | $40.00 | $25.00 | $88.00 | $25.00 | $77.00 | $45.00 | $18.72 | $75.00 | $60.00 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 20 FT | $40.00 | $20.00 | $80.00 | $25.00 | $75.00 | $35.00 | $18.72 | $60.00 | $60.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 20 FT | $33.00 | $20.00 | $80.00 | $25.00 | $75.00 | $20.00 | $18.72 | $65.00 | $60.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 20 FT | $33.00 | $20.00 | $80.00 | $25.00 | $88.00 | $42.00 | $18.72 | $65.00 | $60.00 |
| 611E98150 CATCH BASIN, NO. 3 | 12 EACH | $4,000 | $2,700 | $4,000 | $5,000 | $4,000 | $4,150 | $2,877 | $1,750 | $5,295 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 3 EACH | $5,500 | $2,800 | $5,500 | $5,000 | $5,100 | $3,650 | $3,936 | $1,675 | $6,475 |
| 611E98180 CATCH BASIN, NO. 3A | 29 EACH | $3,000 | $2,500 | $3,285 | $3,500 | $3,400 | $2,800 | $2,174 | $2,100 | $3,870 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 12 EACH | $3,500 | $2,600 | $3,825 | $3,500 | $3,600 | $3,000 | $2,458 | $2,100 | $4,180 |
| 611E98370 CATCH BASIN, NO. 6 | 5 EACH | $2,500 | $3,200 | $3,250 | $1,800 | $3,300 | $2,660 | $2,029 | $2,850 | $5,005 |
| 611E98390 CATCH BASIN, NO. 7 | 1 EACH | $3,500 | $1,800 | $2,000 | $2,100 | $1,800 | $2,300 | $1,675 | $3,000 | $4,615 |
| 611E98410 CATCH BASIN, NO. 8 | 3 EACH | $3,800 | $2,300 | $4,350 | $3,800 | $4,500 | $3,700 | $2,597 | $1,250 | $5,425 |
| 611E98470 CATCH BASIN, NO. 2-2B | 19 EACH | $2,000 | $1,800 | $2,000 | $1,750 | $2,400 | $2,000 | $1,737 | $1,500 | $1,820 |
| 611E98510 CATCH BASIN, NO. 2-3 | 3 EACH | $3,000 | $1,900 | $2,675 | $2,000 | $3,000 | $2,200 | $2,022 | $2,100 | $2,130 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $3,500 | $2,300 | $3,275 | $2,500 | $3,500 | $2,900 | $2,443 | $3,100 | $3,115 |
| 611E99095 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B, AS | 3 EACH | $12,000 | $8,400 | $7,250 | $9,000 | $11,000 | $3,965 | $3,444 | $5,000 | $13,600 |
| 611E99110 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1 | 4 EACH | $12,000 | $9,800 | $7,700 | $9,800 | $12,000 | $4,725 | $3,768 | $4,500 | $15,225 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 6 EACH | $10,000 | $8,000 | $7,200 | $9,200 | $11,000 | $4,100 | $3,331 | $5,000 | $12,850 |
| 611E99574 MANHOLE, NO. 3 | 12 EACH | $5,000 | $3,100 | $5,325 | $4,500 | $4,800 | $3,600 | $3,066 | $4,100 | $5,975 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $15,000 | $30,000 | $10,750 | $7,000 | $15,000 | $11,200 | $9,091 | $6,500 | $12,025 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $18,000 | $8,800 | $14,850 | $9,500 | $19,000 | $14,800 | $11,007 | $10,000 | $17,615 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $750 | $600 | $600 | $300 | $980 | $650 | $850 | $600 | $1,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $1,000 | $2,000 | $1,800 | $2,000 | $1,600 | $1,500 | $1,500 | $1,000 | $2,100 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 11 EACH | $350 | $400 | $225 | $360 | $250 | $330 | $269 | $500 | $450 |
| 611E99720 INSPECTION WELL | 4 EACH | $1,000 | $2,000 | $1,300 | $400 | $700 | $400 | $557 | $1,100 | $1,000 |
| 611E99830 SPECIAL - TRENCH DRAIN | 68 FT | $150 | $144 | $145 | $255 | $240 | $95.00 | $250 | $100 | $275 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $20,000 | $19,000 | $25,000 | $35,000 | $30,000 | $19,500 | $23,867 | $41,000 | $27,150 |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $35,000 | $35,000 | $45,000 | $55,000 | $46,000 | $36,500 | $34,541 | $51,000 | $42,050 |
| 407E20000 NON-TRACKING TACK COAT | 6,403 GAL | $2.00 | $3.00 | $2.25 | $2.00 | $2.75 | $2.50 | $2.10 | $2.50 | $2.75 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 37 CY | $350 | $400 | $425 | $350 | $600 | $400 | $369 | $425 | $475 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (38 CY | $340 | $400 | $420 | $340 | $575 | $390 | $358 | $400 | $450 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 2,990 CY | $10.00 | $7.00 | $12.00 | $10.00 | $2.50 | $12.00 | $10.50 | $9.00 | $10.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 654 SY | $70.00 | $75.00 | $70.00 | $52.20 | $60.00 | $80.00 | $60.10 | $19.10 | $71.00 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 866 SY | $80.00 | $88.00 | $90.00 | $83.10 | $80.00 | $95.00 | $88.20 | $25.62 | $92.00 |
| 452E14110 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 781 SY | $100 | $112 | $120 | $113 | $105 | $110 | $111 | $38.30 | $112 |
| 609E24510 CURB, TYPE 4-C | 1,671 FT | $15.00 | $9.00 | $28.00 | $17.50 | $23.00 | $20.00 | $21.30 | $3.71 | $23.00 |
| 609E26000 CURB, TYPE 6 | 1,708 FT | $18.00 | $19.00 | $26.00 | $20.00 | $24.00 | $23.00 | $21.30 | $3.24 | $24.00 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 15,330 FT | $2.50 | $2.00 | $1.85 | $2.50 | $2.00 | $3.00 | $2.60 | $1.25 | $2.00 |
| 202E75611 VALVE BOX REMOVED, AS PER PLAN | 75 EACH | $150 | $50.00 | $100 | $130 | $224 | $250 | $150 | $100 | $100 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 206 CY | $125 | $140 | $115 | $175 | $186 | $115 | $134 | $75.00 | $110 |
| 638E06708 24" STEEL PIPE ENCASEMENT, OPEN CUT | 140 FT | $260 | $315 | $415 | $450 | $319 | $205 | $364 | $180 | $250 |
| 638E06912 48" STEEL PIPE ENCASEMENT, OPEN CUT | 76 FT | $700 | $500 | $700 | $1,200 | $710 | $400 | $1,055 | $475 | $725 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $170 | $450 | $285 | $105 | $1,200 | $450 | $453 | $100 | $500 |
| 638E20538 SPECIAL - 6" GATE VALVE WITH VALVE BOX, COMPLETE ( | 4 EACH | $1,900 | $1,200 | $1,200 | $1,555 | $960 | $1,250 | $1,134 | $1,227 | $1,330 |
| 638E20586 SPECIAL - 12" GATE VALVE WITH VALVE BOX, COMPLETE | 4 EACH | $4,200 | $2,800 | $3,275 | $3,500 | $3,000 | $3,200 | $3,564 | $3,500 | $3,415 |
| 638E20738 SPECIAL - 2" AIR RELEASE VALVE(CANTON) | 1 EACH | $5,200 | $3,200 | $3,200 | $3,500 | $5,000 | $2,800 | $3,562 | $3,900 | $3,350 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT, COMPLETE (CANTON) | 5 EACH | $7,500 | $4,900 | $7,500 | $6,700 | $7,000 | $5,550 | $6,318 | $5,900 | $6,800 |
| 638E20760 SPECIAL - FIRE HYDRANT REMOVED AND DISPOSED OF(CAN | 2 EACH | $1,230 | $800 | $900 | $750 | $730 | $620 | $600 | $1,000 | $200 |
| 638E98000 WATER WORK, MISC.: 1" CURB VALVE AND ROADWAY BOX, | 19 EACH | $1,050 | $450 | $700 | $420 | $1,800 | $450 | $971 | $900 | $460 |
| 638E98000 WATER WORK, MISC.: 11.25^ - 12" DIP BEND FITTING | 2 EACH | $840 | $900 | $1,000 | $1,400 | $500 | $940 | $816 | $1,000 | $870 |
| 638E98000 WATER WORK, MISC.: 11.25^ - 36" DIP BEND FITTING, | 4 EACH | $14,000 | $16,500 | $12,750 | $15,500 | $15,000 | $12,500 | $17,429 | $20,000 | $11,975 |
| 638E98000 WATER WORK, MISC.: 12" x 12" DIP TEE FITTING | 1 EACH | $1,800 | $1,400 | $2,000 | $2,225 | $712 | $1,950 | $1,467 | $1,700 | $1,850 |
| 638E98000 WATER WORK, MISC.: 12" x 12" TEE/CUT-IN SLEEVE | 1 EACH | $2,700 | $1,600 | $2,200 | $5,050 | $6,200 | $4,500 | $2,315 | $5,000 | $5,250 |
| 638E98000 WATER WORK, MISC.: 12" x 12" WYE | 1 EACH | $2,100 | $1,800 | $2,000 | $4,400 | $7,200 | $1,900 | $1,821 | $2,500 | $2,050 |
| 638E98000 WATER WORK, MISC.: 12" x 6" DIP REDUCER FITTING | 2 EACH | $550 | $600 | $725 | $925 | $275 | $625 | $780 | $1,000 | $590 |
| 638E98000 WATER WORK, MISC.: 12" x 6" WYE | 1 EACH | $1,700 | $1,500 | $1,550 | $4,000 | $6,500 | $1,500 | $1,294 | $1,700 | $1,580 |
| 638E98000 WATER WORK, MISC.: 2" CURB VALVE AND ROADWAY BOX, | 10 EACH | $2,100 | $750 | $1,085 | $900 | $1,700 | $800 | $1,201 | $1,700 | $950 |
| 638E98000 WATER WORK, MISC.: 22.5^ - 12" DIP BEND FITTING | 2 EACH | $830 | $1,100 | $1,000 | $1,450 | $659 | $970 | $1,279 | $1,700 | $900 |
| 638E98000 WATER WORK, MISC.: 22.5^ - 36" DIP BEND FITTING, T | 4 EACH | $13,000 | $17,000 | $12,750 | $16,500 | $16,500 | $12,500 | $18,177 | $25,000 | $12,450 |
| 638E98000 WATER WORK, MISC.: 36" BUTTERFLY VALVE WITH VALVE | 2 EACH | $30,000 | $26,000 | $30,000 | $28,000 | $40,000 | $29,900 | $26,073 | $38,000 | $29,950 |
| 638E98000 WATER WORK, MISC.: 36" CUTTING SLEEVE | 6 EACH | $12,000 | $9,100 | $5,500 | $8,500 | $28,000 | $7,250 | $6,998 | $25,000 | $7,500 |
| 638E98000 WATER WORK, MISC.: 36" x 12" DIP CROSS, TR-FLEX | 1 EACH | $23,000 | $21,000 | $18,000 | $20,000 | $53,000 | $18,500 | $22,125 | $75,000 | $17,350 |
| 638E98000 WATER WORK, MISC.: 36" x 12" DIP TEE FITTING, TR-F | 1 EACH | $18,000 | $19,400 | $16,500 | $17,500 | $18,000 | $16,900 | $20,567 | $25,000 | $15,500 |
| 638E98000 WATER WORK, MISC.: 36" x 6" DIP TEE FITTING, TR-FL | 1 EACH | $19,000 | $21,000 | $18,000 | $18,500 | $20,000 | $17,800 | $21,993 | $37,000 | $16,800 |
| 638E98000 WATER WORK, MISC.: 45^ - 12" DIP BEND FITTING | 10 EACH | $1,400 | $1,000 | $1,200 | $1,650 | $725 | $1,050 | $1,197 | $1,700 | $975 |
| 638E98000 WATER WORK, MISC.: 45^ - 36" DIP BEND FITTING, TR- | 3 EACH | $15,000 | $17,300 | $13,175 | $16,100 | $17,500 | $13,500 | $21,895 | $22,000 | $12,925 |
| 638E98000 WATER WORK, MISC.: 45^ - 6" DIP BEND FITTING | 4 EACH | $520 | $375 | $500 | $425 | $267 | $500 | $645 | $500 | $325 |
| 638E98000 WATER WORK, MISC.: 6" PLUG WITH 2" OUTLET | 4 EACH | $515 | $380 | $775 | $555 | $128 | $850 | $227 | $500 | $585 |
| 638E98000 WATER WORK, MISC.: 6" x 6" DIP CROSS | 1 EACH | $900 | $675 | $900 | $725 | $340 | $1,700 | $1,172 | $1,000 | $665 |
| 638E98000 WATER WORK, MISC.: 8" PLUG WITH 2" OUTLET | 1 EACH | $700 | $365 | $900 | $655 | $165 | $800 | $234 | $750 | $665 |
| 638E98000 WATER WORK, MISC.: 90^ - 2" HDPE BEND FITTING | 1 EACH | $400 | $400 | $650 | $400 | $1,500 | $400 | $309 | $500 | $380 |
| 638E98000 WATER WORK, MISC.: CUT AND PLUG EXISTING 12" WATER | 8 EACH | $550 | $700 | $1,800 | $1,200 | $198 | $3,300 | $1,396 | $2,800 | $550 |
| 638E98000 WATER WORK, MISC.: CUT AND PLUG EXISTING 36" WATER | 6 EACH | $8,500 | $8,200 | $9,750 | $900 | $7,800 | $8,300 | $8,862 | $16,000 | $9,950 |
| 638E98000 WATER WORK, MISC.: CUT AND PLUG EXISTING 8" WATER | 1 EACH | $660 | $500 | $1,275 | $455 | $129 | $3,000 | $1,328 | $1,500 | $325 |
| 638E98000 WATER WORK, MISC.:1 1/2" CURB VALVE AND ROADWAY BO | 1 EACH | $1,400 | $1,000 | $900 | $700 | $1,300 | $550 | $1,040 | $1,000 | $725 |
| 638E98600 WATER WORK, MISC.: 1 1/2" HDPE SERVICE BRANCH, COM | 10 FT | $200 | $80.00 | $100 | $205 | $100 | $130 | $54.23 | $500 | $250 |
| 638E98600 WATER WORK, MISC.: 1" HDPE SERVICE BRANCH, COMPLET | 252 FT | $120 | $45.00 | $45.00 | $170 | $93.00 | $65.00 | $27.73 | $28.45 | $90.00 |
| 638E98600 WATER WORK, MISC.: 12" WATER MAIN DUCTILE IRON PIP | 436 FT | $160 | $142 | $275 | $220 | $165 | $180 | $131 | $170 | $183 |
| 638E98600 WATER WORK, MISC.: 12" WATER MAIN DUCTILE IRON PIP | 140 FT | $165 | $176 | $180 | $170 | $160 | $115 | $242 | $180 | $215 |
| 638E98600 WATER WORK, MISC.: 2" HDPE SERVICE BRANCH, COMPLET | 1,887 FT | $60.00 | $53.00 | $20.00 | $45.00 | $47.00 | $35.00 | $25.01 | $37.00 | $95.00 |
| 638E98600 WATER WORK, MISC.: 2" HDPE WATER MAIN | 832 FT | $40.00 | $40.00 | $25.00 | $35.00 | $22.00 | $30.00 | $36.87 | $41.00 | $85.00 |
| 638E98600 WATER WORK, MISC.: 36" WATER MAIN (REMOVED) | 200 FT | $26.00 | $10.00 | $15.00 | $60.00 | $30.00 | $95.00 | $56.37 | $250 | $30.00 |
| 638E98600 WATER WORK, MISC.: 6" WATER MAIN DUCTILE IRON PIPE | 378 FT | $100 | $117 | $128 | $105 | $102 | $95.00 | $85.00 | $73.00 | $152 |
| 638E98600 WATER WORK, MISC.: REMOVED CROSS | 1 FT | $650 | $330 | $3,225 | $2,000 | $14,000 | $220 | $100 | $5,000 | $750 |
| 690E50600 SPECIAL - BOLLARD | 2 EACH | $1,200 | $800 | $750 | $600 | $530 | $700 | $1,225 | $750 | $1,000 |
| 632E64950 TEST HOLE PERFORMED | 5 EACH | $2,900 | $1,200 | $1,800 | $1,100 | $8,500 | $350 | $603 | $400 | $800 |
| 638E07320 48" STEEL PIPE ENCASEMENT, BORED OR JACKED | 80 FT | $1,000 | $1,100 | $1,225 | $1,800 | $1,300 | $1,650 | $1,704 | $787 | $2,200 |
| 638E98000 WATER WORK, MISC.:, 2? BLOW OFF ASSEMBLY | 1 EACH | $3,420 | $2,300 | $1,850 | $1,800 | $2,800 | $3,200 | $2,740 | $1,250 | $2,100 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 60 FT | $30.00 | $10.00 | $40.00 | $45.00 | $57.00 | $76.00 | $10.00 | $100 | $25.00 |
| 202E58000 MANHOLE REMOVED | 7 EACH | $800 | $600 | $3,235 | $1,300 | $1,300 | $1,500 | $500 | $1,500 | $1,100 |
| 202E98600 ABANDON MISC.: DISCONNECT SANITARY SERVICE | 24 EACH | $540 | $1,000 | $1,500 | $550 | $700 | $600 | $500 | $1,000 | $500 |
| 611E01100 6" CONDUIT, TYPE C, 707.45 | 171 FT | $120 | $152 | $115 | $100 | $112 | $36.00 | $63.57 | $50.00 | $180 |
| 611E01800 8" CONDUIT, TYPE B, 707.45 | 174 FT | $150 | $170 | $100 | $105 | $118 | $175 | $77.26 | $115 | $185 |
| 611E01801 8" CONDUIT, TYPE B, AS PER PLAN, PVC SDR 35 | 138 FT | $240 | $162 | $120 | $160 | $162 | $175 | $111 | $125 | $215 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, PVC SDR 35 | 10 FT | $520 | $500 | $375 | $600 | $312 | $600 | $175 | $150 | $950 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 9 EACH | $1,150 | $700 | $2,000 | $300 | $690 | $950 | $900 | $800 | $1,000 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $2,500 | $1,900 | $3,000 | $1,200 | $1,100 | $1,050 | $1,132 | $1,500 | $1,150 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,700 | $2,700 | $2,750 | $2,100 | $1,300 | $1,350 | $1,500 | $1,200 | $2,500 |
| 611E99690 MANHOLE, MISC.: STARK COUNTY PRECAST MANHOLE TYPE | 6 EACH | $8,000 | $3,400 | $7,200 | $5,600 | $15,000 | $8,600 | $4,188 | $7,000 | $8,915 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $100 | $120 | $100 | $100 | $106 | $137 | $92.30 | $100 | $140 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 691.5 FT | $4.00 | $4.00 | $4.00 | $3.80 | $4.00 | $5.00 | $3.10 | $3.80 | $5.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,075 FT | $8.00 | $10.00 | $8.00 | $11.00 | $8.50 | $14.00 | $9.80 | $11.00 | $14.30 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 210.5 FT | $50.00 | $90.00 | $50.00 | $50.00 | $53.00 | $90.00 | $59.00 | $50.00 | $93.00 |
| 625E29000 TRENCH | 1,035 FT | $6.00 | $10.00 | $6.00 | $12.00 | $6.00 | $8.00 | $8.30 | $12.00 | $8.00 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,000 | $850 | $1,000 | $950 | $1,000 | $1,065 | $579 | $950 | $1,085 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $100 | $200 | $100 | $175 | $100 | $365 | $277 | $175 | $375 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 1,035 FT | $0.50 | $0.26 | $0.50 | $0.80 | $0.50 | $0.30 | $1.70 | $0.80 | $0.30 |
| 625E75550 DISTRIBUTION CABLE REMOVED | 3,483 FT | $0.50 | $0.75 | $0.50 | $0.25 | $0.50 | $0.90 | $2.30 | $0.25 | $0.90 |
| 625E75800 DISCONNECT CIRCUIT | 3 EACH | $500 | $200 | $500 | $225 | $530 | $215 | $406 | $225 | $220 |
| 621E00100 RPM | 298 EACH | $37.50 | $33.00 | $38.75 | $46.19 | $37.00 | $46.00 | $37.10 | $38.75 | $50.00 |
| 625E32000 GROUND ROD | 2 EACH | $265 | $200 | $315 | $265 | $280 | $200 | $312 | $315 | $550 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1WAY | 19 EACH | $8.10 | $15.00 | $8.30 | $22.00 | $8.50 | $10.00 | $8.50 | $8.30 | $13.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 22 EACH | $8.10 | $15.00 | $8.30 | $22.00 | $8.50 | $10.00 | $8.50 | $8.30 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1WAY | 22 EACH | $9.65 | $15.00 | $9.45 | $22.00 | $10.00 | $11.00 | $10.10 | $9.45 | $13.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 672.8 FT | $4.73 | $10.00 | $12.50 | $12.50 | $13.00 | $14.00 | $13.20 | $12.50 | $12.65 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 277.3 FT | $6.25 | $12.00 | $15.00 | $14.00 | $15.00 | $16.50 | $14.80 | $15.00 | $13.75 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 46.5 FT | $11.35 | $15.00 | $16.80 | $16.80 | $18.00 | $18.00 | $17.70 | $16.80 | $16.50 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 178 FT | $8.05 | $15.00 | $15.50 | $15.50 | $16.00 | $17.00 | $16.40 | $15.50 | $16.50 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 77.9 FT | $8.77 | $15.00 | $15.00 | $15.00 | $16.00 | $16.00 | $15.90 | $15.00 | $16.50 |
| 630E08600 SIGN POST REFLECTOR | 39 EACH | $21.25 | $45.00 | $45.00 | $45.00 | $48.00 | $48.00 | $47.50 | $45.00 | $50.00 |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 1 EACH | $63,122 | $62,000 | $69,725 | $69,350 | $73,500 | $75,500 | $73,110 | $69,725 | $71,500 |
| 630E79611 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, AS PER PLA | 2 EACH | $705 | $1,000 | $850 | $845 | $895 | $920 | $891 | $850 | $1,100 |
| 630E80100 SIGN, FLAT SHEET | 607.7 SF | $14.15 | $16.00 | $17.00 | $16.00 | $17.00 | $20.00 | $16.90 | $17.00 | $18.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 283.3 SF | $30.15 | $22.00 | $23.00 | $23.00 | $24.00 | $25.00 | $24.30 | $23.00 | $26.00 |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $9,277 | $6,200 | $9,375 | $8,850 | $14,180 | $10,200 | $11,438 | $9,375 | $13,500 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $6,100 | $7,300 | $7,950 | $7,675 | $8,130 | $8,600 | $8,091 | $7,950 | $8,250 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 69 EACH | $12.85 | $20.00 | $15.00 | $15.00 | $16.00 | $16.00 | $15.90 | $15.00 | $22.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 42 EACH | $14.75 | $20.00 | $20.00 | $20.00 | $21.00 | $21.00 | $21.10 | $20.00 | $22.00 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 1 EACH | $695 | $300 | $220 | $220 | $233 | $240 | $232 | $220 | $330 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 13 EACH | $340 | $300 | $195 | $195 | $206 | $210 | $206 | $195 | $330 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 3 EACH | $23.00 | $20.00 | $15.00 | $15.00 | $16.00 | $16.50 | $15.90 | $15.00 | $22.00 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 5 EACH | $1,000 | $7,000 | $920 | $920 | $975 | $990 | $970 | $920 | $8,250 |
| 630E89704 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $735 | $2,000 | $1,480 | $1,480 | $1,600 | $1,600 | $1,560 | $1,480 | $2,750 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $1,715 | $3,000 | $2,550 | $2,550 | $2,700 | $2,750 | $2,688 | $2,550 | $3,600 |
| 631E94490 REMOVAL, MISC.: FLASHING SIGNAL AHEAD ASSEMBLY | 2 EACH | $400 | $600 | $750 | $400 | $530 | $260 | $341 | $400 | $660 |
| 646E10200 CENTER LINE | 0.33 MILE | $18,000 | $8,000 | $8,500 | $8,500 | $9,000 | $16,800 | $8,961 | $8,500 | $9,350 |
| 646E10300 CHANNELIZING LINE, 8" | 125 FT | $3.50 | $2.35 | $2.35 | $2.35 | $2.00 | $5.20 | $2.50 | $2.35 | $3.00 |
| 646E10400 STOP LINE | 318 FT | $12.00 | $15.00 | $15.00 | $15.00 | $16.00 | $14.20 | $15.90 | $15.00 | $16.00 |
| 646E10500 CROSSWALK LINE | 413 FT | $7.00 | $8.00 | $8.00 | $8.00 | $8.00 | $9.00 | $8.40 | $8.00 | $9.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 374 FT | $11.00 | $15.00 | $15.00 | $15.00 | $16.00 | $11.00 | $15.90 | $15.00 | $17.00 |
| 646E10620 CHEVRON MARKING | 66 FT | $13.00 | $25.00 | $25.00 | $25.00 | $26.00 | $11.00 | $26.40 | $25.00 | $27.00 |
| 646E20300 LANE ARROW | 29 EACH | $180 | $170 | $185 | $185 | $195 | $220 | $195 | $1,854 | $200 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 3 EACH | $150 | $350 | $375 | $375 | $400 | $325 | $395 | $375 | $410 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.63 MILE | $7,000 | $2,500 | $2,500 | $2,500 | $2,648 | $9,200 | $2,636 | $2,500 | $2,750 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 2.28 MILE | $7,000 | $5,400 | $5,450 | $5,450 | $5,772 | $6,100 | $5,746 | $5,450 | $5,995 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 2.31 MILE | $5,200 | $2,500 | $2,500 | $2,500 | $2,650 | $4,900 | $2,636 | $2,500 | $2,750 |
| 807E12200 WET REFLECTIVE EPOXY PAVEMENT MARKING, CENTER LINE | 0.09 MILE | $18,000 | $8,000 | $8,000 | $8,000 | $8,480 | $7,400 | $8,434 | $8,000 | $8,800 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 4,262 FT | $3.30 | $2.50 | $2.65 | $2.65 | $3.00 | $3.50 | $2.80 | $2.65 | $2.90 |
| 807E12430 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 1,093 FT | $2.00 | $2.50 | $2.65 | $2.65 | $3.00 | $3.50 | $2.80 | $2.65 | $2.90 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $3,650 | $2,500 | $2,500 | $2,500 | $2,650 | $3,200 | $2,636 | $2,500 | $2,750 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $2.55 | $1.50 | $1.50 | $1.50 | $2.00 | $3.00 | $1.60 | $1.50 | $1.65 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,300 | $8,000 | $8,000 | $8,000 | $8,500 | $7,150 | $8,434 | $8,000 | $8,800 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $4.00 | $3.50 | $3.50 | $3.50 | $4.00 | $5.50 | $3.70 | $3.50 | $3.85 |
| 625E18500 BRACKET ARM, 25' | 2 EACH | $2,000 | $2,000 | $2,000 | $1,600 | $2,120 | $2,280 | $2,403 | $1,600 | $2,325 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 441 FT | $2.00 | $3.50 | $2.00 | $3.00 | $2.00 | $4.00 | $1.90 | $3.00 | $4.20 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 122 FT | $1.50 | $1.40 | $1.50 | $1.50 | $2.00 | $1.60 | $2.70 | $1.50 | $1.60 |
| 625E25400 CONDUIT, 2", 725.04 | 60 FT | $20.00 | $20.00 | $20.00 | $23.00 | $21.00 | $24.50 | $18.80 | $23.00 | $25.00 |
| 625E25500 CONDUIT, 3", 725.04 | 237 FT | $36.00 | $40.00 | $36.00 | $37.00 | $38.00 | $47.00 | $35.10 | $37.00 | $48.00 |
| 625E25600 CONDUIT, 4", 725.04 | 69 FT | $50.00 | $53.00 | $50.00 | $57.00 | $53.00 | $61.00 | $58.90 | $57.00 | $62.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $625 | $570 | $625 | $310 | $662 | $648 | $678 | $310 | $660 |
| 625E29000 TRENCH | 352 FT | $8.00 | $10.00 | $8.00 | $12.00 | $8.00 | $5.00 | $8.30 | $12.00 | $5.00 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,000 | $1,000 | $1,000 | $950 | $1,060 | $1,250 | $579 | $950 | $1,255 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,200 | $1,000 | $1,200 | $1,150 | $1,271 | $1,265 | $836 | $1,150 | $1,290 |
| 625E32000 GROUND ROD | 8 EACH | $250 | $150 | $250 | $265 | $265 | $190 | $312 | $265 | $195 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 352 FT | $0.50 | $0.25 | $0.50 | $0.80 | $1.00 | $0.50 | $1.70 | $0.80 | $0.40 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL , ST. ELMO AVE NE | 1 EACH | $300 | $1,700 | $300 | $2,000 | $318 | $1,920 | $1,265 | $2,000 | $1,950 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 12 EACH | $850 | $700 | $850 | $850 | $900 | $850 | $737 | $850 | $865 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,200 | $1,200 | $1,200 | $1,200 | $1,270 | $1,400 | $1,367 | $1,200 | $1,430 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 6 EACH | $600 | $480 | $600 | $600 | $635 | $520 | $459 | $600 | $530 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 14 EACH | $50.00 | $19.00 | $50.00 | $40.00 | $53.00 | $20.00 | $51.00 | $40.00 | $21.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $50.00 | $19.00 | $50.00 | $30.00 | $53.00 | $20.00 | $40.00 | $30.00 | $21.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 3 EACH | $250 | $330 | $250 | $200 | $265 | $360 | $248 | $200 | $365 |
| 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES | 395 FT | $6.50 | $15.00 | $6.50 | $20.00 | $7.00 | $18.00 | $8.20 | $20.00 | $18.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 395 FT | $15.00 | $20.00 | $15.00 | $19.00 | $16.00 | $21.00 | $7.40 | $19.00 | $22.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,005 FT | $3.00 | $3.25 | $3.00 | $2.43 | $3.00 | $4.00 | $2.80 | $2.43 | $4.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,534 FT | $3.50 | $4.50 | $3.50 | $2.70 | $4.00 | $5.00 | $3.00 | $2.70 | $5.00 |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $4,000 | $3,000 | $4,000 | $8,200 | $4,300 | $3,620 | $5,843 | $8,200 | $3,685 |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $800 | $1,000 | $800 | $900 | $850 | $1,265 | $950 | $900 | $1,285 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 54 FT | $6.00 | $3.50 | $6.00 | $7.00 | $6.00 | $4.50 | $5.80 | $7.00 | $5.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,000 | $2,100 | $2,000 | $1,600 | $2,120 | $2,580 | $2,936 | $1,600 | $2,625 |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 2 EACH | $1,050 | $9,000 | $1,050 | $10,150 | $1,112 | $11,800 | $12,373 | $10,150 | $12,010 |
| 632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 1 EACH | $1,050 | $10,000 | $1,050 | $10,150 | $1,112 | $12,600 | $12,674 | $10,150 | $12,830 |
| 632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 1 EACH | $11,250 | $12,000 | $11,250 | $11,100 | $11,920 | $14,500 | $14,660 | $11,100 | $14,835 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 3 EACH | $1,500 | $1,300 | $1,500 | $550 | $1,600 | $1,550 | $569 | $550 | $1,585 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 2 EACH | $3,000 | $3,600 | $3,000 | $1,700 | $3,180 | $4,120 | $3,805 | $1,700 | $4,190 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $11,000 | $10,500 | $11,000 | $11,400 | $11,650 | $12,100 | $12,940 | $11,400 | $12,290 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,000 | $1,400 | $2,000 | $2,900 | $2,120 | $1,650 | $2,650 | $2,900 | $1,695 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $500 | $500 | $500 | $480 | $530 | $600 | $462 | $480 | $610 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $2,000 | $1,700 | $2,000 | $1,600 | $2,120 | $2,050 | $2,330 | $1,600 | $2,075 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,000 | $5,800 | $6,000 | $6,000 | $6,355 | $6,400 | $6,416 | $6,000 | $6,500 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $7,000 | $13,800 | $7,000 | $8,250 | $7,400 | $8,000 | $8,394 | $8,250 | $8,075 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,250 | $6,700 | $7,250 | $7,900 | $7,680 | $7,600 | $7,996 | $7,900 | $7,715 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $5,300 | $5,000 | $5,300 | $5,200 | $5,600 | $5,620 | $5,893 | $5,200 | $5,720 |
| 524E94600 DRILLED SHAFTS, 30" DIAMETER | 907 FT | $155 | $100 | $183 | $180 | $125 | $185 | $193 | $81.32 | $169 |
| 606E10920 SPECIAL - NOISE BARRIER, FIBERGLASS PANELS | 1,440 SF | $23.99 | $62.00 | $25.00 | $63.00 | $24.00 | $86.00 | $51.15 | $26.00 | $45.00 |
| 202E38000 GUARDRAIL REMOVED | 108 FT | $2.40 | $3.00 | $2.55 | $3.21 | $3.00 | $3.00 | $2.50 | $2.55 | $4.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (WZ RPM) | 7 SY | $355 | $300 | $50.00 | $355 | $154 | $5.50 | $105 | $355 | $400 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 82 CY | $75.00 | $60.00 | $175 | $90.00 | $155 | $74.00 | $93.50 | $65.00 | $90.00 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 500 HOUR | $70.00 | $75.00 | $75.00 | $55.00 | $74.00 | $76.00 | $68.60 | $60.00 | $65.00 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $45,000 | $45,000 | $60,000 | $55,000 | $42,000 | $46,800 | $57,168 | $42,853 | $48,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,750 FT | $0.85 | $1.00 | $2.50 | $3.00 | $1.00 | $3.50 | $3.00 | $20.00 | $4.50 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 125 FT | $25.40 | $35.00 | $25.40 | $25.40 | $27.00 | $27.50 | $26.80 | $25.40 | $39.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,060 | $2,300 | $2,090 | $2,060 | $2,182 | $2,260 | $2,214 | $2,090 | $3,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $13,100 | $15,000 | $13,000 | $13,000 | $1,400 | $11,500 | $13,705 | $13,000 | $15,000 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 230 EACH | $58.00 | $46.00 | $39.50 | $27.00 | $48.00 | $65.00 | $47.50 | $39.50 | $60.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $500 | $200 | $285 | $250 | $447 | $260 | $324 | $300 | $350 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 , ONE-WAY | 266 EACH | $5.90 | $8.00 | $8.50 | $18.00 | $7.00 | $16.50 | $15.90 | $1.65 | $20.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 266 EACH | $13.00 | $8.00 | $8.50 | $22.00 | $15.00 | $17.50 | $16.90 | $6.65 | $20.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 144 SNMT | $675 | $600 | $550 | $550 | $700 | $600 | $580 | $550 | $600 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.99 MILE | $800 | $700 | $700 | $700 | $742 | $720 | $738 | $700 | $770 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.19 MILE | $1,500 | $1,000 | $1,000 | $1,000 | $1,060 | $1,300 | $1,054 | $1,000 | $1,100 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 14.3 MILE | $980 | $700 | $685 | $685 | $725 | $1,100 | $722 | $685 | $750 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 4,932 FT | $0.80 | $1.00 | $0.65 | $0.65 | $1.00 | $1.00 | $0.70 | $0.65 | $0.75 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 3,079 FT | $1.25 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.10 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 279 FT | $3.50 | $3.75 | $3.75 | $3.75 | $4.00 | $4.00 | $3.90 | $3.75 | $4.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 21 EACH | $50.00 | $50.00 | $45.00 | $45.00 | $48.00 | $85.00 | $47.50 | $45.00 | $50.00 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 4 EACH | $195 | $200 | $200 | $200 | $212 | $255 | $211 | $200 | $220 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $75,000 | $90,000 | $125,000 | $350,000 | $96,000 | $58,200 | $55,217 | $28,000 | $200,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 1,243 SY | $75.00 | $55.00 | $60.00 | $59.00 | $84.00 | $54.00 | $81.70 | $65.00 | $62.00 |
| 616E10000 WATER | 10 MGAL | $60.00 | $10.00 | $50.00 | $200 | $104 | $100 | $61.00 | $100 | $200 |
| 616E20000 CALCIUM CHLORIDE | 12 TON | $300 | $150 | $100 | $100 | $190 | $180 | $319 | $350 | $700 |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 970 FT | $17.00 | $26.00 | $25.00 | $14.00 | $20.00 | $33.00 | $31.60 | $62.00 | $44.00 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 1,200 TON | $34.00 | $55.00 | $60.00 | $58.00 | $66.00 | $76.00 | $60.10 | $150 | $110 |
| 690E70000 SPECIAL - ENVIRONMENTAL (PROTECTION OF PARK FACILI | 1 LS | $3,000 | $6,000 | $5,500 | $6,000 | $2,700 | $2,400 | $12,158 | $5,000 | $40,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 340 CY | $20.00 | $25.00 | $18.00 | $20.00 | $21.00 | $45.00 | $32.10 | $25.00 | $30.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 91,525 LB | $1.50 | $1.50 | $1.60 | $1.75 | $1.00 | $1.75 | $1.60 | $0.87 | $2.35 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 929 SY | $20.00 | $25.00 | $20.00 | $20.00 | $24.00 | $32.00 | $23.40 | $2.00 | $30.00 |
| 516E13000 1/4" PREFORMED EXPANSION JOINT FILLER | 106 SF | $16.00 | $10.00 | $21.00 | $10.00 | $2.00 | $9.00 | $10.50 | $1.78 | $10.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 175 SF | $16.00 | $10.00 | $20.00 | $25.00 | $2.00 | $11.00 | $10.50 | $10.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 49 CY | $100 | $75.00 | $100 | $115 | $143 | $108 | $95.70 | $74.00 | $75.00 |
| 870E10001 PREFABRICATED MODULAR RETAINING WALL, AS PER PLAN | 817 SF | $100 | $105 | $152 | $95.00 | $85.00 | $145 | $101 | $100 | $135 |
| 870E11000 WALL EXCAVATION | 507 CY | $10.00 | $25.00 | $30.00 | $20.00 | $15.00 | $22.00 | $28.30 | $20.00 | $30.00 |
| 870E11100 NATURAL SOIL | 231 CY | $20.00 | $30.00 | $36.00 | $25.00 | $46.00 | $33.00 | $32.40 | $38.53 | $35.00 |
| 870E12000 6" DRAINAGE PIPE, PERFORATED | 124 FT | $10.00 | $20.00 | $12.00 | $5.00 | $6.00 | $11.00 | $8.60 | $12.60 | $20.00 |
| 870E12100 6" DRAINAGE PIPE, NON-PERFORATED | 30 FT | $20.00 | $30.00 | $24.00 | $10.00 | $12.00 | $21.00 | $8.60 | $12.60 | $20.00 |
| 870E14000 ON-SITE ASSISTANCE | 2 DAY | $1,000 | $600 | $1,000 | $500 | $700 | $1,100 | $766 | $1,000 | $850 |
| 870E15000 PMRW INSPECTION AND COMPACTION TESTING | 1 LS | $2,000 | $3,500 | $10,000 | $1,500 | $2,500 | $8,100 | $3,030 | $20,000 | $40,000 |
| 100E50200 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION ADVIS | 1 LS | $33,000 | $33,000 | $33,000 | $33,000 | $33,000 | $33,000 | $33,000 | $33,000 | $33,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $125,000 | $100,000 | $80,000 | $75,000 | $100,000 | $76,000 | $102,151 | $250,000 | $80,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $5,000 | $10,000 | $30,000 | $10,000 | $20,000 | $22,000 | $15,578 | $41,000 | $51,000 |
| 111E10000 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING | 1 LS | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 |
| 619E16020 FIELD OFFICE, TYPE C | 33 MNTH | $1,800 | $2,300 | $2,175 | $3,000 | $3,200 | $4,000 | $3,286 | $5,000 | $4,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $135,000 | $100,000 | $160,000 | $175,000 | $200,000 | $115,000 | $120,000 | $250,000 | $160,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 8,320 CY | $119 | $990k | 7% |
| 638E98600 WATER WORK, MISC.: 36" WATER MAIN DUCTILE IRON PIP | 1,010 FT | $740 | $747k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $626,000 | $626k | 5% |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE) | 24,096 SF | $24 | $578k | 4% |
| 304E20000 AGGREGATE BASE | 9,445 CY | $60 | $567k | 4% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,034 CY | $215 | $437k | 3% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,416 CY | $169 | $408k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $400,000 | $400k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 9,140 CY | $42 | $384k | 3% |
| 202E23000 PAVEMENT REMOVED | 43,008 SY | $8 | $344k | 3% |