MOT-SR 49-12.16
MOT County · est $0.3M
Bid dateThursday, December 2—
MOT County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Dot Construction CORP | R3Brumbaugh Construction INC | R4Complete General Construction Company | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 541 SF | $107 | $90.00 | $100 | $70.00 | $56.52 | 23% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $29,040 | $25,000 | $15,000 | $20,000 | $9,333 | 11% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 12 CY | $1,609 | $1,000 | $2,000 | $2,500 | $3,540 | 8% |
| 517E70000 |
| Item | Quantity | R1Bcc Ohio INC | R2Dot Construction CORP | R3Brumbaugh Construction INC | R4Complete General Construction Company | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,005 | $5,000 | $1,000 | $9,000 | $8,122 |
| 202E38000 GUARDRAIL REMOVED | 517 FT | $2.63 | $1.80 | $5.00 | $3.00 | $3.00 |
| 203E10000 EXCAVATION | 16 CY | $10.05 | $20.00 | $50.00 | $50.00 | $135 |
| 203E20000 EMBANKMENT | 18 CY | $76.50 | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 66 FT |
| $286 |
| $263 |
| $285 |
| $350 |
| $325 |
| 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 470 FT | $30.96 | $20.00 | $35.00 | $25.00 | $36.46 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $14,490 | $40,000 | $35,000 | $35,000 | $28,711 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $13,336 | $20,000 | $19,111 | $10,000 | $25,968 | 5% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,573 | $2,640 | $2,500 | $2,370 | $2,370 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,158 LB | $2.36 | $2.00 | $2.00 | $2.15 | $2.30 | 4% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 396 EACH | $21.14 | $50.00 | $13.00 | $21.75 | $23.33 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E MASH 2016 | 3 EACH | $2,783 | $2,895 | $2,700 | $2,650 | $2,650 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $29.40 | $21.60 | $25.00 | $23.25 | $23.25 | 3% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 47 CY | $161 | $100 | $150 | $125 | $142 | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,780 | $2,180 | $2,500 | $2,100 | $2,100 | 3% |
| 614E11630 INCREASED BARRIER DELINEATION | 80 FT | $84.57 | $2.00 | $2.00 | $2.80 | $2.80 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $3,039 | $1,000 | $800 | $1,500 | $1,660 | 2% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 1 CY | $3,954 | $1,000 | $2,500 | $3,500 | $4,203 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,501 | $3,000 | $5,000 | $4,000 | $2,600 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $3,252 | $5,000 | $7,500 | $30,000 | $60,628 | 1% |
| 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA) | 66 EACH | $40.15 | $100 | $80.00 | $75.00 | $73.35 | 1% |
| $50.00 |
| $75.00 |
| $60.04 |
| 659E00300 TOPSOIL | 12 CY | $57.13 | $50.00 | $50.00 | $20.00 | $123 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN (CLASS 4, 5, OR | 100 SY | $18.38 | $17.50 | $5.00 | $35.04 | $20.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $473 | $450 | $750 | $700 | $500 |
| 659E31000 LIME | 0.01 ACRE | $74.00 | $70.00 | $5.00 | $100 | $200 |
| 659E35000 WATER | 0.3 MGAL | $1.07 | $1.00 | $5.00 | $10.00 | $1.00 |
| 832E30000 EROSION CONTROL | 611 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 2 GAL | $54.75 | $100 | $10.00 | $10.00 | $40.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2 CY | $902 | $500 | $1,500 | $2,500 | $2,393 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 10 EACH | $8.40 | $8.00 | $15.00 | $9.50 | $9.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $21.00 | $15.00 | $15.00 | $22.50 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $68.25 | $120 | $100 | $75.00 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.75 | $10.00 | $25.00 | $30.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.17 MILE | $11,582 | $10,000 | $9,000 | $10,000 | $8,825 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $76.65 | $100 | $60.00 | $85.00 | $85.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $23.93 | $10.00 | $10.00 | $17.00 | $17.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $23.93 | $20.00 | $25.00 | $21.00 | $21.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.17 MILE | $11,582 | $10,000 | $8,500 | $8,000 | $8,000 |
| 616E10000 WATER | 1 MGAL | $12.60 | $1.00 | $5.00 | $60.00 | $161 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 29 SY | $90.45 | $20.00 | $40.00 | $125 | $93.78 |
| 202E38500 BRIDGE RAILING REMOVED | 57 FT | $5.47 | $5.20 | $15.00 | $10.00 | $34.44 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $2,110 | $5,000 | $7,500 | $10,000 | $8,332 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.36 | $2.00 | $1.50 | $3.15 | $6.14 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 77 SY | $26.66 | $50.00 | $35.00 | $33.00 | $37.71 |
| 512E33010 TYPE 3 WATERPROOFING | 29 SY | $61.95 | $50.00 | $75.00 | $75.00 | $70.50 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 45 SF | $18.67 | $10.00 | $3.00 | $10.00 | $4.93 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 18 FT | $33.70 | $20.00 | $65.00 | $40.00 | $22.50 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 62 FT | $18.03 | $20.00 | $13.00 | $15.00 | $15.00 |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 1 SY | $753 | $500 | $1,500 | $5,000 | $1,641 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,475 | $2,500 | $2,500 | $2,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 541 SF | $106.61 | $58k | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $29,040 | $29k | 10% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 12 CY | $1,609 | $19k | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 66 FT | $285.86 | $19k | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 470 FT | $30.96 | $15k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $14,490 | $14k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $13,336 | $13k | 5% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,573 | $10k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,158 LB | $2.36 | $10k | 3% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 396 EACH | $21.14 | $8k | 3% |