STA-US 62/SR 153-25.32/03.00
STA County · est $3.4M
Bid dateThursday, December 16—
STA County · est $3.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Shelly Company | R2Northstar Asphalt INC | R3Chagrin Valley Paving INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (8029 CY | $115 | $132 | $125 | $141 | 31% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,735 CY | $155 | $152 | $160 | $180 | 30% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 180,372 SY | $1.10 | $1.80 | $3.00 | $2.10 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $142,500 | $160,000 | $295,000 | $218,000 | 5% |
| Item | Quantity | R1Shelly Company | R2Northstar Asphalt INC | R3Chagrin Valley Paving INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 659E20000 COMMERCIAL FERTILIZER | 3.04 TON | $1,000 | $900 | $800 | $1,250 |
| 659E31000 LIME | 4.66 ACRE | $0.10 | $200 | $80.00 | $327 |
| 659E35000 WATER | 121.5 MGAL | $0.10 | $3.00 | $1.00 | $7.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 3,700 SY | $28.00 | $24.00 | $35.00 | $40.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $235,000 | $145,006 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (742 CY | $123 | $136 | $135 | $138 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 531 CY | $167 | $168 | $165 | $172 | 3% |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 13,170 CY | $5.00 | $3.40 | $3.00 | $6.00 | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $7,550 | $7,550 | $7,550 | $7,550 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 23,453 GAL | $2.50 | $2.40 | $2.00 | $2.25 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,028 CY | $52.00 | $60.00 | $75.00 | $68.00 | 2% |
| 646E10010 EDGE LINE, 6" | 14.68 MILE | $2,650 | $2,650 | $2,650 | $2,650 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 36 SNMT | $900 | $900 | $900 | $900 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 7,398 GAL | $3.50 | $3.60 | $2.00 | $4.25 | 1% |
| 621E00100 RPM | 891 EACH | $25.50 | $32.00 | $25.50 | $26.50 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $2,100 | $2,400 | $2,250 | $1,800 | 1% |
| 659E10000 SEEDING AND MULCHING | 22,506 SY | $0.83 | $0.75 | $0.80 | $1.20 | 1% |
| 646E10300 CHANNELIZING LINE, 8" | 5,962 FT | $2.50 | $2.50 | $2.50 | $2.50 | 1% |
| 209E60200 LINEAR GRADING | 810 STA | $18.25 | $45.00 | $20.00 | $35.00 | 0% |
| 713 EACH |
| $5.00 |
| $4.00 |
| $1.00 |
| $1.00 |
| 646E10110 LANE LINE, 6" | 7.1 MILE | $1,700 | $1,700 | $1,700 | $1,700 |
| 646E10200 CENTER LINE | 1.22 MILE | $3,300 | $3,300 | $3,300 | $3,300 |
| 646E10400 STOP LINE | 422 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10500 CROSSWALK LINE | 410 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E10620 CHEVRON MARKING | 1,052 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10800 ISLAND MARKING | 226 SF | $8.00 | $8.00 | $8.00 | $8.00 |
| 646E20300 LANE ARROW | 61 EACH | $150 | $150 | $150 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $65.00 | $75.00 | $100 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $70.00 | $70.00 | $70.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $135 | $200 | $298 | $250 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 14.2 MILE | $600 | $600 | $600 | $600 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.1 MILE | $650 | $650 | $650 | $650 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.44 MILE | $925 | $925 | $925 | $925 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.22 MILE | $925 | $925 | $925 | $925 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 14.68 MILE | $600 | $600 | $600 | $600 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 11,924 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 5,962 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 844 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 422 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $15,000 | $25,000 | $18,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $5,000 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (8029 CY | $115 | $923k | 30% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 5,735 CY | $155 | $889k | 29% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 180,372 SY | $1.1 | $198k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $142,500 | $143k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 3,700 SY | $28 | $104k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (742 CY | $123 | $91k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 531 CY | $167 | $89k | 3% |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 13,170 CY | $5 | $66k | 2% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $7,550 | $60k | 2% |