ASD-US 42/SR 60-15.05/27.40
ASD County · est $0.4M
Bid dateThursday, April 29—
ASD County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2Bcc Ohio INC | R3Eclipse CO LLC | R4Kelstin INC | R5Black Horse Bridge Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E53400 58" X 91" CONDUIT, TYPE A, 706.04 | 95 FT | $450 | $941 | $513 | $800 | $650 | 16% |
| 624E10000 MOBILIZATION | 1 LS | $29,000 | $3,131 | $32,268 | $15,000 | $15,000 | 11% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 64 CY | $305 | $348 | $355 | $295 | $350 | 7% |
| 203E20000 EMBANKMENT | 1,164 CY | $15.00 | $10.79 | $8.83 | $25.00 | $23.00 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 83 CY | $207 | $237 | $242 | $260 | $185 | 7% |
| 602E20000 CONCRETE MASONRY | 17.2 CY | $975 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Bcc Ohio INC | R3Eclipse CO LLC | R4Kelstin INC | R5Black Horse Bridge Construction INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $420 | $6,507 | $2,000 | $5,600 |
| 202E23000 PAVEMENT REMOVED | 437 SY | $8.00 | $6.25 | $9.47 | $15.00 | $12.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 41 FT | $10.00 | $7.13 | $21.35 | $20.00 | $20.00 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 224 FT | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $826 |
| $991 |
| $1,200 |
| $1,050 |
| 6% |
| 659E00300 TOPSOIL | 362 CY | $45.00 | $12.00 | $59.36 | $25.00 | $41.00 | 6% |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 707.33, 748.06 (0.500 | 50 FT | $275 | $376 | $278 | $400 | $310 | 5% |
| 611E07600 18" CONDUIT, TYPE C | 146 FT | $65.00 | $83.32 | $65.66 | $60.00 | $80.00 | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $3,100 | $2,546 | $2,703 | $2,525 | $2,425 | 4% |
| 304E20000 AGGREGATE BASE | 154 CY | $60.00 | $88.65 | $66.18 | $60.00 | $70.00 | 4% |
| 203E10000 EXCAVATION | 724 CY | $12.00 | $8.78 | $9.58 | $25.00 | $23.00 | 3% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $8,500 | $8,250 | $8,844 | $10,000 | $32,000 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $4,160 | $5,129 | $8,000 | $5,200 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 73 CY | $95.00 | $145 | $93.86 | $200 | $100 | 3% |
| 659E10000 SEEDING AND MULCHING | 3,268 SY | $2.00 | $2.05 | $1.39 | $5.00 | $2.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $5,225 | $6,003 | $5,000 | $6,500 | 2% |
| 601E11000 RIPRAP, TYPE D | 25 SY | $225 | $168 | $111 | $40.00 | $175 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 287.5 FT | $18.50 | $21.21 | $22.05 | $23.00 | $20.20 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $2,730 | $8,732 | $2,000 | $6,500 | 2% |
| $16.00 |
| $24.08 |
| $5.00 |
| $18.00 |
| 204E10000 SUBGRADE COMPACTION | 501 SY | $1.00 | $0.98 | $2.38 | $5.00 | $5.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT | $29.00 | $23.94 | $25.47 | $22.00 | $22.80 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,250 | $1,029 | $1,044 | $915 | $980 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $1,050 | $1,299 | $993 | $1,000 | $2,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 6 EACH | $400 | $465 | $37.52 | $400 | $1,400 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $400 | $52.50 | $26.76 | $100 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 164 SY | $1.00 | $0.95 | $1.07 | $5.00 | $1.00 |
| 659E15000 INTER-SEEDING | 164 SY | $1.00 | $0.11 | $0.54 | $2.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.45 TON | $450 | $756 | $589 | $1,000 | $500 |
| 659E31000 LIME | 0.67 ACRE | $600 | $42.00 | $10.70 | $200 | $200 |
| 659E35000 WATER | 18.08 MGAL | $1.00 | $1.31 | $10.70 | $5.00 | $1.30 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 199 FT | $8.00 | $6.12 | $10.64 | $25.00 | $15.00 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $1,375 | $2,356 | $2,140 | $2,500 | $2,250 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 295 SY | $8.00 | $37.80 | $38.53 | $18.00 | $19.00 |
| 407E10000 TACK COAT | 98 GAL | $6.00 | $2.52 | $2.57 | $5.00 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $90.00 | $10.50 | $12.10 | $125 | $30.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 7 EACH | $8.00 | $7.88 | $8.03 | $11.00 | $8.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $18,000 | $15,750 | $9,916 | $15,000 | $17,305 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $24,000 | $15,750 | $13,078 | $15,000 | $23,070 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,000 | $998 | $1,331 | $1,000 | $950 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,500 | $1,170 | $5,516 | $4,000 | $8,150 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,500 | $820 | $6,435 | $4,000 | $8,150 |
| 602E20000 CONCRETE MASONRY | 4 CY | $850 | $1,111 | $1,179 | $500 | $960 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $800 | $1,413 | $782 | $250 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $1,845 | $10,831 | $5,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53400 58" X 91" CONDUIT, TYPE A, 706.04 | 95 FT | $450 | $43k | 14% |
| 624E10000 MOBILIZATION | 1 LS | $29,000 | $29k | 9% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 64 CY | $305 | $20k | 6% |
| 203E20000 EMBANKMENT | 1,164 CY | $15 | $17k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 83 CY | $207 | $17k | 5% |
| 602E20000 CONCRETE MASONRY | 17.2 CY | $975 | $17k | 5% |
| 659E00300 TOPSOIL | 362 CY | $45 | $16k | 5% |
| 611E20700 48" CONDUIT, TYPE A, 706.02, 707.33, 748.06 (0.500 | 50 FT | $275 | $14k | 4% |
| 611E07600 18" CONDUIT, TYPE C | 146 FT | $65 | $9k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 3 EACH | $3,100 | $9k | 3% |