| Item | Quantity | R1Crawford Construction Company INC | R2Great Lakes Demolition Company | R3Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|
| 515E12020 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $9,500 | $9,750 | $13,000 | 21% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $49,500 | $20,000 | $50,000 | 11% |
| 624E10000 MOBILIZATION | 1 LS | $34,500 | $75,000 | $20,000 | 8% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 52 CY | $660 | $950 | $750 | 8% |
| 503E21100 UNCLASSIFIED EXCAVATION | 549 CY | $48.00 | $20.00 | $60.00 | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 85 FT | $273 | $260 | $250 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 485 FT | $46.00 |
| Item | Quantity | R1Crawford Construction Company INC | R2Great Lakes Demolition Company | R3Vernon Nagel INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,800 | $500 | $1,500 |
| 202E23000 PAVEMENT REMOVED | 431 SY | $8.00 | $12.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 20 FT | $17.00 | $25.00 | $16.00 |
| 202E38000 GUARDRAIL REMOVED | 280 FT | $5.00 | $2.00 | $3.00 |
| 202E60010 MONUMENT ASSEMBLY REMOVED | 1 EACH | $200 | $200 | $200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $60.00 |
| $30.00 |
| 5% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 22 CY | $1,010 | $950 | $1,200 | 5% |
| 507E92200 PREBORED HOLES | 165 FT | $115 | $100 | $110 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,542 LB | $1.75 | $1.90 | $1.75 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 57 CY | $311 | $220 | $250 | 4% |
| 526E10001 REINFORCED CONCRETE APPROACH SLABS (T=12"), AS PER | 59 SY | $278 | $193 | $300 | 4% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 50 SY | $278 | $190 | $300 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 42 CY | $327 | $340 | $300 | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 330 FT | $37.00 | $85.00 | $60.00 | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,800 | $8,500 | $25,000 | 2% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 42 FT | $200 | $150 | $200 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,600 | $8,500 | $7,500 | 1% |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 275 FT | $23.00 | $15.00 | $4.00 | 1% |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $3,100 | $4,500 | $4,000 | 1% |
| 203E10000 EXCAVATION |
| 100 CY |
| $60.00 |
| $15.00 |
| $20.00 |
| 203E20000 EMBANKMENT | 5 CY | $100 | $40.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 342 SY | $2.00 | $2.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 117 CY | $17.00 | $20.00 | $24.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 117 CY | $31.00 | $60.00 | $62.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $230 | $300 | $125 |
| 204E50000 GEOTEXTILE FABRIC | 352 SY | $6.00 | $5.00 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $32.00 | $29.20 | $30.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,950 | $2,720 | $2,720 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $1,300 | $1,145 | $1,145 |
| 606E35001 BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 2 EACH | $2,419 | $2,240 | $2,240 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 17 CY | $121 | $105 | $100 |
| 659E00300 TOPSOIL | 24 CY | $44.00 | $65.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 212 SY | $11.00 | $4.00 | $7.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11 SY | $7.70 | $2.00 | $10.00 |
| 659E15000 INTER-SEEDING | 11 SY | $0.22 | $2.00 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $2,800 | $1,000 | $850 |
| 659E31000 LIME | 0.04 ACRE | $1,500 | $60.00 | $60.00 |
| 659E35000 WATER | 2.6 MGAL | $1.00 | $5.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 20 FT | $63.00 | $50.00 | $25.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 195 SY | $20.00 | $40.00 | $6.00 |
| 304E20000 AGGREGATE BASE | 75 CY | $48.00 | $60.00 | $65.00 |
| 407E10000 TACK COAT | 80 GAL | $1.22 | $4.50 | $1.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $17.00 | $15.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $77.00 | $50.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 17 SF | $15.00 | $20.00 | $12.00 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 17 SF | $10.00 | $10.00 | $8.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $18.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $25.00 | $15.00 | $15.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $2,500 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,400 | $5,000 | $3,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $14.00 | $8.00 | $8.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $21.00 | $16.00 | $16.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,000 | $1,000 | $1,000 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 26 EACH | $36.00 | $200 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 121 SY | $22.00 | $15.00 | $20.00 |
| 512E44400 TYPE B WATERPROOFING | 10 SY | $124 | $60.00 | $75.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 141 SF | $7.00 | $15.00 | $12.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 20 EACH | $25.00 | $35.00 | $25.00 |
| 516E43101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 40 EACH | $118 | $110 | $125 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 43 CY | $71.00 | $65.00 | $75.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 93 FT | $18.00 | $11.00 | $12.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 88 FT | $10.00 | $10.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 34 FT | $10.00 | $10.00 | $10.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 12 SF | $300 | $100 | $100 |
| 526E90010 TYPE A INSTALLATION | 30 FT | $200 | $145 | $200 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,700 | $15,000 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,300 | $6,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12020 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $9,500 | $95k | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $49,500 | $50k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $34,500 | $35k | 6% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 52 CY | $660 | $34k | 6% |
| 503E21100 UNCLASSIFIED EXCAVATION | 549 CY | $48 | $26k | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 85 FT | $273 | $23k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 485 FT | $46 | $22k | 4% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 22 CY | $1,010 | $22k | 4% |
| 507E92200 PREBORED HOLES | 165 FT | $115 | $19k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,542 LB | $1.75 | $18k | 3% |