HAM-SR 264-Culverts FY22
HAM County · est $0.1M
Bid dateThursday, August 26—
HAM County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Prus Construction Company | R2Rack & Ballauer Excavating CO INC | R3Sunesis Construction CO | R4Eclipse CO LLC | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,000 | $10,000 | $7,670 | $55,000 | $6,449 | 15% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 12" | 46 FT | $395 | $350 | $337 | $350 | $350 | 13% |
| 611E07200 18" CONDUIT, TYPE A, 707.02, 706.02 ALUMINIZED, 70 | 57 FT | $230 | $210 | $264 | $175 | $507 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $20,000 | $26,170 | $11,039 | $10,000 | 7% |
| 614E12420 DETOUR SIGNING | 1 LS | $9,000 | $6,000 | $8,531 | $14,500 | $4,985 | 6% |
| 611E04600 12" CONDUIT, TYPE C | 75 FT |
| Item | Quantity | R1Prus Construction Company | R2Rack & Ballauer Excavating CO INC | R3Sunesis Construction CO | R4Eclipse CO LLC | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $675 | $580 | $1,564 | $435 | $2,753 |
| 202E30000 WALK REMOVED | 85 SF | $4.50 | $8.40 | $2.62 | $2.00 | $22.53 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 57 FT | $26.00 | $25.00 | $15.76 | $23.25 | $43.57 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $875 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $115 |
| $115 |
| $109 |
| $64.00 |
| $88.25 |
| 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9 CY | $950 | $850 | $1,265 | $928 | $3,950 | 6% |
| 611E05900 15" CONDUIT, TYPE B | 44 FT | $175 | $150 | $164 | $178 | $138 | 5% |
| 202E23000 PAVEMENT REMOVED | 65.6 SY | $100 | $37.50 | $49.96 | $5.25 | $83.94 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,400 | $12,500 | $3,577 | $7,500 | $6,177 | 4% |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $5,000 | $6,000 | $9,205 | $6,695 | $3,770 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $8,000 | $2,525 | $9,500 | $6,626 | 3% |
| 611E10600 24" CONDUIT, TYPE C | 4 FT | $940 | $350 | $899 | $246 | $917 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 4 CY | $925 | $2,200 | $531 | $1,573 | $9,550 | 3% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 50 FT | $70.00 | $37.50 | $89.95 | $72.75 | $59.86 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $3,450 | $3,000 | $1,212 | $714 | $5,250 | 2% |
| 602E20000 CONCRETE MASONRY | 0.73 CY | $4,600 | $2,300 | $3,960 | $2,364 | $3,133 | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 623E40520 RIGHT-OF-WAY MONUMENT | 7 EACH | $425 | $425 | $2,180 | $197 | $521 | 2% |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,700 | $2,025 | $1,516 | $1,897 | $1,427 | 2% |
| $850 |
| $557 |
| $879 |
| $921 |
| 204E10000 SUBGRADE COMPACTION | 53 SY | $6.00 | $33.50 | $23.39 | $11.25 | $12.48 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $220 | $100 | $7,439 | $1,000 | $6,246 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1.9 CY | $815 | $340 | $756 | $489 | $969 |
| 659E10000 SEEDING AND MULCHING | 450 SY | $5.00 | $4.00 | $5.14 | $8.25 | $6.95 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $850 | $1,000 | $505 | $1,385 | $790 |
| 659E31000 LIME | 0.09 ACRE | $35.00 | $200 | $52.44 | $55.00 | $30.00 |
| 659E35000 WATER | 2.4 MGAL | $1.06 | $75.00 | $1.40 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 12.5 CY | $175 | $250 | $116 | $110 | $1,120 |
| 407E10000 TACK COAT | 6 GAL | $10.00 | $3.00 | $8.08 | $23.00 | $10.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 21 SY | $115 | $190 | $217 | $109 | $499 |
| 621E00100 RPM | 2 EACH | $500 | $1,555 | $1,638 | $1,709 | $1,555 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $50.00 | $45.00 | $0.42 | $39.50 | $110 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.04 MILE | $59,265 | $50,000 | $47,706 | $51,901 | $47,227 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $59,461 | $58,000 | $55,238 | $60,096 | $54,684 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,500 | $2,000 | $0.01 | $4,500 | $621 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $21,000 | $21k | 13% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 12" | 46 FT | $395 | $18k | 11% |
| 611E07200 18" CONDUIT, TYPE A, 707.02, 706.02 ALUMINIZED, 70 | 57 FT | $230 | $13k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 6% |
| 614E12420 DETOUR SIGNING | 1 LS | $9,000 | $9k | 6% |
| 611E04600 12" CONDUIT, TYPE C | 75 FT | $115 | $9k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9 CY | $950 | $9k | 5% |
| 611E05900 15" CONDUIT, TYPE B | 44 FT | $175 | $8k | 5% |
| 202E23000 PAVEMENT REMOVED | 65.6 SY | $100 | $7k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,400 | $6k | 4% |