LIC-US 62-00.49
LIC County · est $1.3M
Bid dateThursday, January 13—
LIC County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 86 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Axis Civil Construction LLC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 868 CY | $163 | $163 | $185 | $163 | 12% |
| 203E10000 EXCAVATION | 5,870 CY | $22.00 | $27.00 | $18.00 | $26.25 | 11% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 5,000 DLR | $25.00 | $34.00 | $35.00 | $35.00 | 11% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 1,601 CY | $63.50 | $52.00 | $58.00 | $46.50 |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3Axis Civil Construction LLC | R4Shelly Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,500 | $25,000 | $8,500 | $17,500 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $125 | $500 | $165 | $295 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $150 | $500 | $365 | $295 |
| 202E58500 CATCH BASIN ABANDONED | 2 EACH | $300 | $350 | $315 | $800 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 362 CY | $210 | $210 | $230 | $210 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $72,548 | $10,000 | $32,500 | $35,000 | 6% |
| 304E20000 AGGREGATE BASE | 928 CY | $75.00 | $65.00 | $65.00 | $54.25 | 6% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,920 FT | $36.00 | $23.00 | $55.00 | $27.00 | 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (244 CY | $250 | $250 | $230 | $250 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $49,000 | 4% |
| 832E30000 EROSION CONTROL | 35,520 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 3,471 FT | $10.00 | $14.00 | $10.50 | $12.00 | 3% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $28,850 | $8,000 | $25,000 | $25,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 2,264 SY | $12.00 | $10.00 | $12.00 | $13.50 | 2% |
| 203E20000 EMBANKMENT | 3,075 CY | $8.00 | $8.00 | $13.50 | $17.00 | 2% |
| 204E10000 SUBGRADE COMPACTION | 5,844 SY | $4.00 | $3.00 | $2.50 | $1.95 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,750 | $2,500 | $2,500 | $2,500 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 400 CY | $48.00 | $45.00 | $58.00 | $45.00 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2,319 FT | $8.00 | $7.00 | $12.00 | $22.00 | 2% |
| 611E01500 6" CONDUIT, TYPE F | 1,800 FT | $10.00 | $10.00 | $13.50 | $17.25 | 2% |
| 78 FT |
| $25.00 |
| $15.00 |
| $23.50 |
| $64.50 |
| 202E75000 FENCE REMOVED | 853 FT | $5.00 | $8.00 | $2.65 | $3.50 |
| 202E75250 GATE REMOVED | 1 EACH | $475 | $250 | $85.00 | $175 |
| 204E13000 EXCAVATION OF SUBGRADE | 400 CY | $12.00 | $25.00 | $21.00 | $21.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $200 | $250 | $325 | $205 |
| 204E50000 GEOTEXTILE FABRIC | 6,383 SY | $1.00 | $3.00 | $1.30 | $0.85 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 20 EACH | $100 | $800 | $650 | $350 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $200 | $295 | $100 | $175 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 2 EACH | $275 | $385 | $100 | $175 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 18 SY | $125 | $100 | $140 | $150 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $350 | $150 | $155 | $980 |
| 659E00300 TOPSOIL | 1,448 CY | $8.00 | $25.00 | $25.00 | $32.25 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 13,043 SY | $1.00 | $0.97 | $1.00 | $0.68 |
| 659E14000 REPAIR SEEDING AND MULCHING | 652 SY | $4.00 | $4.00 | $1.00 | $0.68 |
| 659E20000 COMMERCIAL FERTILIZER | 1.82 TON | $850 | $850 | $800 | $697 |
| 659E31000 LIME | 2.69 ACRE | $10.00 | $10.00 | $80.00 | $154 |
| 659E35000 WATER | 72 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,486 SY | $2.25 | $2.25 | $2.00 | $1.34 |
| 671E15080 EROSION CONTROL MAT, TYPE I | 1,501 SY | $1.75 | $1.75 | $3.65 | $1.44 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,500 | $2,500 | $1,275 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,700 | $4,500 | $4,500 | $1,260 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,000 | $10,000 | $10,000 | $7,766 |
| 602E20000 CONCRETE MASONRY | 2 CY | $2,500 | $2,000 | $1,600 | $2,625 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 302 FT | $12.00 | $18.00 | $20.00 | $12.50 |
| 611E00400 4" CONDUIT, TYPE E | 10 FT | $30.00 | $10.00 | $23.75 | $59.50 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 93 FT | $20.00 | $15.00 | $14.50 | $58.00 |
| 611E00900 6" CONDUIT, TYPE B | 200 FT | $21.00 | $15.00 | $14.00 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E | 200 FT | $15.00 | $10.00 | $13.50 | $17.25 |
| 611E01400 6" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 150 FT | $15.00 | $10.00 | $13.50 | $17.50 |
| 611E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 150 FT | $15.00 | $10.00 | $13.50 | $17.50 |
| 611E01800 8" CONDUIT, TYPE B | 200 FT | $25.00 | $20.00 | $16.50 | $23.25 |
| 611E02500 8" CONDUIT, TYPE E | 200 FT | $20.00 | $13.00 | $16.00 | $19.50 |
| 611E02500 8" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 150 FT | $20.00 | $13.00 | $16.00 | $19.75 |
| 611E02600 8" CONDUIT, TYPE F | 200 FT | $20.00 | $13.00 | $16.00 | $19.50 |
| 611E02600 8" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 150 FT | $20.00 | $13.00 | $16.00 | $19.75 |
| 611E04200 12" CONDUIT, TYPE A, 707.01 ALUMINIZED, 706.02 OR | 103 FT | $75.00 | $125 | $63.00 | $71.75 |
| 611E05700 15" CONDUIT, TYPE A, 707.01 ALUMINIZED, 706.02 OR | 74 FT | $90.00 | $140 | $112 | $73.75 |
| 611E05900 15" CONDUIT, TYPE B | 50 FT | $90.00 | $100 | $112 | $72.75 |
| 611E06100 15" CONDUIT, TYPE C | 64 FT | $85.00 | $85.00 | $108 | $69.75 |
| 611E07900 18" CONDUIT, TYPE D | 202 FT | $85.00 | $95.00 | $72.00 | $69.75 |
| 611E52200 14" X 23" CONDUIT, TYPE A, 706.04 | 72 FT | $175 | $170 | $230 | $187 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,100 | $1,500 | $1,650 | $2,150 |
| 611E98700 INLET, SIDE DITCH | 4 EACH | $1,000 | $1,500 | $340 | $1,350 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 10 EACH | $225 | $250 | $325 | $250 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,783 FT | $0.01 | $2.00 | $1.50 | $3.05 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 1,695 SY | $1.95 | $1.95 | $1.85 | $2.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2.25") | 3,720 SY | $2.68 | $2.68 | $4.25 | $2.72 |
| 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS) | 13 CY | $400 | $400 | $250 | $410 |
| 407E20000 NON-TRACKING TACK COAT | 1,357 GAL | $3.05 | $3.05 | $4.00 | $3.05 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5 CY | $1,500 | $1,500 | $265 | $1,500 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $800 | $800 | $450 | $800 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.89 MILE | $3,370 | $3,800 | $3,700 | $3,820 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 0.74 MILE | $3,370 | $3,800 | $3,700 | $3,820 |
| 621E00100 RPM | 121 EACH | $45.00 | $60.00 | $45.00 | $46.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 26 EACH | $5.75 | $12.00 | $5.00 | $5.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 149 FT | $21.50 | $17.00 | $8.40 | $8.40 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $45.00 | $45.00 | $67.10 | $67.10 |
| 630E80100 SIGN, FLAT SHEET | 58 SF | $25.00 | $21.50 | $20.40 | $20.40 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 8 EACH | $200 | $145 | $142 | $142 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $20.00 | $10.00 | $40.35 | $40.35 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $20.00 | $15.00 | $52.10 | $52.10 |
| 644E00104 EDGE LINE, 6" | 0.93 MILE | $5,692 | $5,692 | $6,375 | $5,692 |
| 644E00300 CENTER LINE | 0.76 MILE | $8,910 | $8,910 | $8,500 | $8,910 |
| 644E00400 CHANNELIZING LINE, 8" | 200 FT | $2.00 | $2.00 | $2.50 | $2.00 |
| 644E00500 STOP LINE | 34 FT | $7.25 | $7.25 | $15.00 | $7.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 352 FT | $7.00 | $7.00 | $6.00 | $7.00 |
| 644E01300 LANE ARROW | 2 EACH | $98.00 | $98.00 | $254 | $98.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 25 CY | $75.00 | $65.00 | $53.00 | $98.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 25 CY | $85.00 | $55.00 | $57.00 | $100 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $72.00 | $86.00 | $75.00 | $75.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,500 | $3,250 | $1,450 | $2,280 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,500 | $20,000 | $6,500 | $15,000 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $170 | $200 | $170 | $140 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $200 | $200 | $225 | $180 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 41 EACH | $4.00 | $6.00 | $32.00 | $25.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 41 EACH | $9.00 | $15.00 | $36.00 | $35.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 18 SNMT | $900 | $900 | $1,600 | $950 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.47 MILE | $1,710 | $1,710 | $3,812 | $1,710 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.91 MILE | $900 | $900 | $1,950 | $900 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 36 FT | $5.00 | $5.00 | $5.00 | $5.00 |
| 616E10000 WATER | 43 MGAL | $45.00 | $75.00 | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $10,000 | $8,500 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 868 CY | $163 | $141k | 10% |
| 203E10000 EXCAVATION | 5,870 CY | $22 | $129k | 9% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 5,000 DLR | $25 | $125k | 9% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 1,601 CY | $63.5 | $102k | 7% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 362 CY | $210 | $76k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $72,548 | $73k | 5% |
| 304E20000 AGGREGATE BASE | 928 CY | $75 | $70k | 5% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,920 FT | $36 | $69k | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (244 CY | $250 | $61k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |