LOR-SR 83-04.17
LOR County · est $2.5M
Bid dateThursday, January 13—
LOR County · est $2.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 861E11300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 5,341 CY | $150 | $165 | $160 | $150 | 34% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,816 CY | $168 | $180 | $168 | $150 | 27% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 1,250 CY | $200 | $210 | $288 | $200 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,000 | $115,469 | $162,544 |
| Item | Quantity | R1Shelly Company | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 18 SY | $60.00 | $70.00 | $25.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 25 FT | $2.50 | $2.40 | $2.50 | $2.50 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 64.5 FT | $23.00 | $15.60 | $23.00 | $23.00 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 10 EACH | $125 | $95.00 | $125 | $125 |
| 202E42810 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $300,000 |
| 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.75") | 101,550 SY | $1.15 | $0.80 | $1.05 | $1.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $108,000 | $179,000 | 4% |
| 617E10100 COMPACTED AGGREGATE | 711 CY | $65.00 | $30.00 | $60.00 | $70.00 | 2% |
| 407E10000 TACK COAT | 14,615 GAL | $2.50 | $2.25 | $2.10 | $2.00 | 2% |
| 861E11301 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 147 CY | $210 | $225 | $300 | $250 | 1% |
| 253E02000 PAVEMENT REPAIR | 125 CY | $225 | $250 | $275 | $200 | 1% |
| 442E10511 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 105 CY | $250 | $325 | $385 | $250 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 2.15 MILE | $11,250 | $6,500 | $2,800 | $7,500 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 18.96 MILE | $1,000 | $1,000 | $1,000 | $1,000 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 5,084 GAL | $3.50 | $3.55 | $4.15 | $2.00 | 1% |
| 209E60500 LINEAR GRADING | 12.67 MILE | $1,350 | $1,200 | $1,475 | $250 | 1% |
| 621E00100 RPM | 501 EACH | $32.00 | $29.50 | $39.25 | $34.25 | 1% |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 12.67 MILE | $1,200 | $1,200 | $850 | $795 | 1% |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 14 EACH | $975 | $1,185 | $975 | $975 | 1% |
| 620E70010 DELINEATOR, MISC.:REMOVAL AND REERECTED | 260 FT | $50.00 | $34.00 | $50.00 | $50.00 | 1% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 10 EACH | $1,275 | $1,030 | $1,275 | $1,275 | 1% |
| 14 EACH |
| $150 |
| $145 |
| $150 |
| $150 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 12 EACH | $525 | $55.00 | $525 | $525 |
| 203E10000 EXCAVATION | 32 CY | $75.00 | $200 | $80.00 | $100 |
| 203E20000 EMBANKMENT | 60 CY | $55.00 | $85.00 | $55.00 | $55.00 |
| 204E10000 SUBGRADE COMPACTION | 181 SY | $3.50 | $2.00 | $1.50 | $0.50 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 25.45 STA | $110 | $220 | $110 | $110 |
| 209E80000 GRADING MAILBOX APPROACHES | 5 EACH | $185 | $10.00 | $475 | $50.00 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 1,700 FT | $4.50 | $5.80 | $4.50 | $4.50 |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 25 FT | $32.00 | $29.20 | $32.00 | $32.00 |
| 606E32170 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE TST | 8 EACH | $675 | $1,380 | $675 | $675 |
| 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4 | 4 EACH | $675 | $895 | $675 | $675 |
| 623E39601 MONUMENT BOX RECONSTRUCTED TO GRADE, AS PER PLAN | 6 EACH | $800 | $800 | $900 | $1,500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $75.00 | $100 | $250 |
| 659E00300 TOPSOIL | 13 CY | $198 | $45.00 | $65.00 | $198 |
| 659E10000 SEEDING AND MULCHING | 114 SY | $22.00 | $19.50 | $1.50 | $22.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 6 SY | $20.00 | $2.75 | $0.25 | $20.00 |
| 659E15000 INTER-SEEDING | 6 SY | $20.00 | $0.25 | $0.25 | $20.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $3,000 | $1,060 | $1,000 | $3,000 |
| 659E31000 LIME | 0.02 ACRE | $3,000 | $100 | $25.00 | $3,000 |
| 659E35000 WATER | 0.64 MGAL | $500 | $1.25 | $1.00 | $500 |
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 181 FT | $1.75 | $2.50 | $2.00 | $2.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 7,675 SY | $1.15 | $1.25 | $1.35 | $2.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (TAPER 1.75" TO | 1,844 SY | $1.15 | $1.25 | $1.55 | $2.00 |
| 254E01600 PATCHING PLANED SURFACE | 570 SY | $1.00 | $2.50 | $1.00 | $10.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 41 CY | $160 | $325 | $255 | $250 |
| 304E20000 AGGREGATE BASE | 50 CY | $120 | $300 | $105 | $150 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.15 MILE | $1,650 | $850 | $850 | $445 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 480 EACH | $5.00 | $2.00 | $1.00 | $1.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 BIDIRECTIONAL | 58 EACH | $14.00 | $8.60 | $14.00 | $14.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 12.64 MILE | $650 | $650 | $650 | $650 |
| 642E00300 CENTER LINE, TYPE 1 | 6.33 MILE | $815 | $815 | $815 | $815 |
| 644E00400 CHANNELIZING LINE, 8" | 813 FT | $1.50 | $1.50 | $1.50 | $1.50 |
| 644E00500 STOP LINE | 133 FT | $6.25 | $6.25 | $6.25 | $6.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,550 FT | $5.50 | $5.50 | $5.50 | $5.50 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $500 | $500 | $500 |
| 644E01300 LANE ARROW | 18 EACH | $95.00 | $95.00 | $95.00 | $95.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,100 | $1,100 | $1,100 | $1,100 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $65.00 | $70.00 | $75.00 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 28 EACH | $75.00 | $75.00 | $80.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $125 | $250 | $225 | $350 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,439 FT | $0.55 | $0.55 | $0.55 | $0.55 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 279 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 54 EACH | $38.00 | $38.00 | $38.00 | $38.00 |
| 203E20000 EMBANKMENT | 1 CY | $100 | $85.00 | $55.00 | $350 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 64.5 FT | $131 | $38.00 | $131 | $131 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $4,000 | $5,000 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $11,000 | $12,000 | $50,000 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,500 | $1,000 | $3,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,500 | $4,500 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 861E11300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 5,341 CY | $150 | $801k | 32% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,816 CY | $168 | $641k | 25% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 1,250 CY | $200 | $250k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $135,000 | $135k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.75") | 101,550 SY | $1.15 | $117k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 617E10100 COMPACTED AGGREGATE | 711 CY | $65 | $46k | 2% |
| 407E10000 TACK COAT | 14,615 GAL | $2.5 | $37k | 1% |
| 861E11301 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 147 CY | $210 | $31k | 1% |
| 253E02000 PAVEMENT REPAIR | 125 CY | $225 | $28k | 1% |