D01-CR FY22
D01 County · est $0.3M
Bid dateThursday, January 13—
D01 County · est $0.3M
Bid form · ODOT
| Item | Qty | Unit price |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 19items by winning bid’s extended amount.
| Item | Quantity | R1Bcc Ohio INC | R2Madex Construction CO | R3Stanley Miller Construction Company | R4Geotech Services INC | R5Proshot Concrete INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E97200 CONDUIT, MISC.:INTERNAL JOINT SEAL | 14 EACH | $2,313 | $1,625 | $2,048 | $2,060 | $2,500 | 14% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 98" X 69" CMP ARCH | 144 FT | $213 | $190 | $154 | $230 | $250 | 13% |
| 611E96550 FIELD PAVING OF EXISTING PIPE,114" X 77" CMP ARCH | 110 FT | $236 | $174 | $202 | $210 | $280 | 11% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 103" X 71" CMP ARCH | 96 FT | $224 | $172 | $169 | $215 | $250 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,090 | $19,832 | $14,222 | $39,000 | $12,000 | 8% |
| 624E10000 MOBILIZATION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $17,641 |
| $46,410 |
| $66,700 |
| $15,000 |
| $30,000 |
| 8% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 60" CMP | 125 FT | $116 | $160 | $126 | $160 | $200 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,578 | $43,879 | $40,000 | $49,000 | $30,000 | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 90" CMP | 66 FT | $162 | $181 | $201 | $205 | $400 | 5% |
| 602E20000 CONCRETE MASONRY | 4.8 CY | $1,878 | $1,522 | $1,875 | $3,500 | $5,000 | 4% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 96" CMP | 40 FT | $196 | $219 | $265 | $290 | $440 | 3% |
| 611E97400 CONDUIT, MISC.:CONDUIT RECONSTRUCTED, 60" RCP | 12 FT | $526 | $352 | $362 | $1,200 | $4,000 | 3% |
| 611E97400 CONDUIT, MISC.:CONDUIT RECONSTRUCTED, 72" RCP | 8 FT | $789 | $564 | $271 | $950 | $4,000 | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 581 FT | $7.67 | $48.48 | $43.00 | $20.00 | $70.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,216 | $4,645 | $4,333 | $4,000 | $20,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,840 | $8,684 | $4,040 | $4,900 | $6,900 | 1% |
| 832E30000 EROSION CONTROL | 2,100 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 4 CY | $394 | $666 | $480 | $330 | $5,000 | 1% |
| 611E08200 18" CONDUIT, TYPE F | 8 FT | $178 | $135 | $50.00 | $160 | $400 | 1% |
| Extended |
|---|
| % |
|---|
| 611E97200 CONDUIT, MISC.:INTERNAL JOINT SEAL | 14 EACH | $2,313 | $32k | 14% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 98" X 69" CMP ARCH | 144 FT | $213.35 | $31k | 13% |
| 611E96550 FIELD PAVING OF EXISTING PIPE,114" X 77" CMP ARCH | 110 FT | $235.83 | $26k | 11% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 103" X 71" CMP ARCH | 96 FT | $223.51 | $21k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,090 | $18k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $17,641 | $18k | 8% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 60" CMP | 125 FT | $116.09 | $15k | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $13,578 | $14k | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 90" CMP | 66 FT | $162.32 | $11k | 5% |
| 602E20000 CONCRETE MASONRY | 4.8 CY | $1,878 | $9k | 4% |