OTT-SR 2-16.37 Resurf
OTT County · est $5.6M
Bid dateThursday, February 17—
OTT County · est $5.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 63 more items below.
| Item | Quantity | R1Erie Blacktop INC | R2Kokosing Construction Company INC | R3Gerken Paving INC | % of bid |
|---|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 15,898 CY | $170 | $184 | $165 | 56% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,760 SY | $185 | $165 | $172 | 7% |
| 606E15050 GUARDRAIL, TYPE MGS | 12,950 FT | $22.00 | $20.80 | $20.80 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 327,043 SY | $0.75 | $1.00 | $1.50 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $232,000 |
| Item | Quantity | R1Erie Blacktop INC | R2Kokosing Construction Company INC | R3Gerken Paving INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $750 | $1,195 |
| 202E32000 CURB REMOVED | 2,890 FT | $1.85 | $1.75 | $5.20 |
| 202E32500 CURB AND GUTTER REMOVED | 647 FT | $11.00 | $10.50 | $10.50 |
| 202E38000 GUARDRAIL REMOVED | 14,050 FT | $2.10 | $2.00 | $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 8 EACH | $142 | $135 | $135 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $257,000 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | $200,000 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,537 FT | $30.00 | $5.00 | $20.00 | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 469 CY | $175 | $200 | $163 | 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 29 MILE | $2,625 | $1,600 | $2,500 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 27,799 GAL | $2.25 | $2.15 | $2.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 1,029 CY | $55.00 | $60.00 | $50.00 | 1% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, V | 5,632 SY | $9.50 | $5.00 | $3.25 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 606 CY | $80.00 | $73.20 | $73.20 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 51 SNMT | $895 | $500 | $850 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 58 MILE | $735 | $500 | $700 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 7,920 FT | $5.20 | $4.75 | $4.95 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 14 EACH | $2,900 | $2,760 | $2,760 | 1% |
| 530E00800 SPECIAL - STRUCTURESDEBRIS CONTAINMENT WRAP | 175 SY | $221 | $175 | $238 | 1% |
| 530E00800 SPECIAL - STRUCTURESDEBRIS CONTAINMENT WRAP | 175 SY | $221 | $175 | $238 | 1% |
| 202E23000 PAVEMENT REMOVED | 4,639 SY | $8.00 | $6.20 | $6.20 | 1% |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T |
| 5 EACH |
| $120 |
| $115 |
| $115 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 6 EACH | $131 | $125 | $125 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 25 EACH | $63.00 | $60.00 | $60.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 139 STA | $37.00 | $35.00 | $35.00 |
| 209E60500 LINEAR GRADING | 20.77 MILE | $1,400 | $2,750 | $2,200 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $2,205 | $2,100 | $2,100 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 11 EACH | $3,025 | $2,880 | $2,880 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 7 EACH | $1,465 | $1,395 | $1,395 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 8 EACH | $600 | $575 | $575 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $1,000 | $950 | $950 |
| 609E10000 ASPHALT CONCRETE CURB, TYPE 1 | 2,890 FT | $7.50 | $7.25 | $6.50 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 647 FT | $31.00 | $29.55 | $34.80 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 5 EACH | $550 | $600 | $700 |
| 659E10000 SEEDING AND MULCHING | 2,904 SY | $1.95 | $1.45 | $1.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.39 TON | $250 | $650 | $650 |
| 659E35000 WATER | 16 MGAL | $0.25 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,140 | $900 | $1,085 |
| 611E99150 INLET ADJUSTED TO GRADE | 2 EACH | $1,400 | $900 | $1,350 |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 6,836 SY | $3.95 | $6.25 | $3.14 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 136,258 FT | $0.10 | $0.11 | $0.09 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 23,862 LB | $1.25 | $0.50 | $1.50 |
| 621E00100 RPM | 1,171 EACH | $25.75 | $25.50 | $25.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,171 EACH | $5.00 | $2.50 | $15.00 |
| 626E00116 BARRIER REFLECTOR, TYPE 5,UNIDIRECTIONAL | 278 EACH | $8.90 | $8.50 | $8.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 42 FT | $15.75 | $16.90 | $16.90 |
| 630E80100 SIGN, FLAT SHEET | 16.76 SF | $31.50 | $20.00 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $26.25 | $10.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $26.25 | $15.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 28.96 MILE | $735 | $750 | $700 |
| 642E00204 LANE LINE, 6", TYPE 1 | 13.86 MILE | $525 | $675 | $500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.83 MILE | $1,575 | $1,000 | $1,500 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 9,321 FT | $0.84 | $1.00 | $0.80 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 4,332 FT | $0.53 | $1.00 | $0.50 |
| 642E40000 SPEED MEASUREMENT MARKING | 20 EACH | $290 | $50.00 | $150 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 484 FT | $6.30 | $6.00 | $6.00 |
| 644E00720 CHEVRON MARKING | 462 FT | $6.30 | $6.00 | $6.00 |
| 644E00900 ISLAND MARKING | 294 SF | $5.25 | $6.00 | $5.00 |
| 644E01300 LANE ARROW | 17 EACH | $94.50 | $100 | $90.00 |
| 644E01360 WRONG WAY ARROW | 3 EACH | $210 | $300 | $200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $68.25 | $65.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 22 EACH | $158 | $150 | $150 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 20 EACH | $210 | $275 | $200 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $205 | $175 | $192 |
| 614E12600 REPLACEMENT DRUM | 15 EACH | $67.50 | $110 | $64.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 8 SNMT | $1,000 | $600 | $950 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 14 MILE | $1,050 | $750 | $1,000 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 28 MILE | $525 | $350 | $500 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 16,342 FT | $0.53 | $0.35 | $0.50 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 8,464 FT | $0.53 | $0.25 | $0.50 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 14 EACH | $31.50 | $75.00 | $30.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 UNIDIRECTIONAL | 111 EACH | $10.50 | $5.00 | $6.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 111 EACH | $10.50 | $7.50 | $13.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $1,500 | $2,160 |
| 530E00800 SPECIAL - STRUCTURESDEBRIS CONTAINMENT WRAP | 160 SY | $177 | $175 | $240 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $20,000 | $25,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $6,300 | $1,000 | $7,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $4,500 | $19,325 | $17,250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 15,898 CY | $170 | $2.70M | 51% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,760 SY | $185 | $326k | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 12,950 FT | $22 | $285k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 3/4" | 327,043 SY | $0.75 | $245k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,537 FT | $30 | $166k | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 469 CY | $175 | $82k | 2% |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 29 MILE | $2,625 | $76k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 27,799 GAL | $2.25 | $63k | 1% |