HAM-IR 71 Ramp Stewart Rd Culvert
HAM County · est $0.5M
Bid dateThursday, February 17—
HAM County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 3.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2Rack & Ballauer Excavating CO INC | R3John R Jurgensen Company | R4Prus Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 899E10000 CURED-IN-PLACE PIPE LINER, 42" DIAMETER | 362 FT | $395 | $345 | $275 | $480 | 30% |
| 611E19400 42" CONDUIT, TYPE B, 706.02 | 201 FT | $579 | $475 | $642 | $650 | 24% |
| 624E10000 MOBILIZATION | 1 LS | $33,938 | $40,000 | $20,000 | $20,000 | 7% |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE D50, AS PER | 195 FT | $168 | $285 | $234 |
| Item | Quantity | R1Sunesis Construction CO | R2Rack & Ballauer Excavating CO INC | R3John R Jurgensen Company | R4Prus Construction Company |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 80 SY | $44.00 | $50.00 | $38.59 | $77.00 |
| 202E32700 GUTTER REMOVED | 8 SY | $86.00 | $45.00 | $285 | $160 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $755 | $1,300 | $4,473 | $1,050 |
| 202E98500 REMOVAL MISC.:, ROCK | 5 CY | $130 | $75.00 | $256 | $540 |
| 203E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $370 |
| 7% |
| 601E38101 PAVED GUTTER, TYPE 1-6, AS PER PLAN | 302 FT | $74.75 | $125 | $134 | $135 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,090 | $28,000 | $57,250 | $35,000 | 4% |
| 611E98231 CATCH BASIN, NO. 4, AS PER PLAN | 1 EACH | $17,750 | $13,000 | $4,944 | $17,500 | 4% |
| 202E35200 PIPE REMOVED, OVER 24" | 201 FT | $78.00 | $33.00 | $28.97 | $32.00 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 310 FT | $37.04 | $20.50 | $159 | $95.00 | 2% |
| 202E30700 CONCRETE BARRIER REMOVED | 195 FT | $53.50 | $85.00 | $43.53 | $88.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $449 | $320 | $473 | $420 | 2% |
| 304E20000 AGGREGATE BASE | 63 CY | $128 | $130 | $166 | $105 | 2% |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,995 | $10,000 | $6,441 | $8,700 | 1% |
| 861E11300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 4 CY | $1,202 | $1,175 | $1,940 | $800 | 1% |
| 644E00104 EDGE LINE, 6" | 0.32 MILE | $14,045 | $14,045 | $14,045 | $15,160 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,895 | $8,500 | $12,658 | $7,500 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $950 | $950 | $1,050 | $1,025 | 1% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3 CY | $1,252 | $1,275 | $2,479 | $995 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,639 | $5,000 | $4,186 | $7,500 | 1% |
| 50 CY |
| $72.25 |
| $65.00 |
| $191 |
| $74.00 |
| 203E20000 EMBANKMENT | 5 CY | $17.25 | $90.00 | $228 | $177 |
| 204E10000 SUBGRADE COMPACTION | 145 SY | $7.00 | $10.00 | $14.00 | $1.80 |
| 622E90000 BARRIER, MISC.: PORTABLE CONCRETE BARRIER RELOCATE | 20 FT | $53.25 | $90.00 | $119 | $62.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $1,000 | $9,720 | $2,600 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $2,350 | $1,800 | $5,572 | $7,400 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,900 | $1,800 | $5,572 | $14,500 |
| 407E20000 NON-TRACKING TACK COAT | 14 GAL | $6.00 | $3.00 | $10.00 | $10.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 18 EACH | $24.00 | $13.00 | $15.00 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 46 FT | $20.50 | $21.00 | $21.00 | $22.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $43.25 | $26.00 | $26.00 | $47.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $38.00 | $20.00 | $20.00 | $41.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $56.00 | $30.00 | $30.00 | $61.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $80.00 | $75.00 | $146 | $110 |
| 614E11630 INCREASED BARRIER DELINEATION | 318 FT | $2.75 | $2.75 | $3.00 | $3.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,175 | $2,175 | $4,113 | $2,350 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,650 | $2,650 | $5,501 | $8,600 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 6 EACH | $13.00 | $13.00 | $48.92 | $14.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 6 EACH | $16.00 | $16.00 | $34.56 | $17.00 |
| 614E22326 WORK ZONE EDGE LINE, CLASS I, 6", 873 | 0.32 MILE | $8,750 | $8,750 | $8,750 | $9,450 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 899E10000 CURED-IN-PLACE PIPE LINER, 42" DIAMETER | 362 FT | $395 | $143k | 28% |
| 611E19400 42" CONDUIT, TYPE B, 706.02 | 201 FT | $579 | $116k | 23% |
| 624E10000 MOBILIZATION | 1 LS | $33,938 | $34k | 7% |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE D50, AS PER | 195 FT | $167.5 | $33k | 6% |
| 601E38101 PAVED GUTTER, TYPE 1-6, AS PER PLAN | 302 FT | $74.75 | $23k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,090 | $18k | 4% |
| 611E98231 CATCH BASIN, NO. 4, AS PER PLAN | 1 EACH | $17,750 | $18k | 3% |
| 202E35200 PIPE REMOVED, OVER 24" | 201 FT | $78 | $16k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 310 FT | $37.04 | $11k | 2% |
| 202E30700 CONCRETE BARRIER REMOVED | 195 FT | $53.5 | $10k | 2% |